Here are the used gas turbine generator power plants available after their retreat from commercial operation.
1. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw. Total running hour is about 1000 hours. The power plant is located in Liaoning China.
2. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6531 made by GE China Joint Venture in 1992. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 50mw Total running hour is about 35000 hours. The power plant is located in Guangdong China.
3. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6561 made by GE China Joint Venture in 2001. The fuel for the gas turbine is natural gas. Total capacity, including Steam turbine generator capacities, is about 56mw Total running hour is about 32000 hours. The power plant is located in Guangdong China.
4. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw Total running hour is about 1000 hours. The power plant is located in Shanxi China.
5. 在陕西南京汽轮电机集团有限责任公司2001年生产的PG6561单台联合循环燃气轮机,加汽轮机功率为5.6万千瓦,烧天然气,运行小时约小时。
6. There a combined cycle gas turbine power plant equipped with two units of PG6531. The gas turbine generator sets were made by Brown, UK. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator (made by Siemens) capacities, is about 108mw Total running hour is about 25000 hours. The power plant is located in Shandong China.
7. 在山东PG6531B燃气轮机(1#、2#机),制造厂:英国布郎公司; 烧重油;汽轮机(3#机)制造厂:德国西门子公司,总功率:10.8千瓦,运行小时数25000小时。
8. There a combined cycle gas turbine power plant equipped with two units of PG6541. The gas turbine generator sets were made by GE USA in 2000. The fuel for the gas turbine is Heavy Fuel Oil or natural gas. Steam turbine, boiler were made by Chinese producers. Total capacity, including Steam turbine generator capacities, is about 100mw. Total running hour is about 25000 hours. The power plant is located in Jiangsu China.
9. 在江苏 2台美国GE公司生产的PG6541燃气轮机联合循环机组,锅炉和汽机均国产,烧天然气、柴油均可,总功率在10万千瓦,已运行25000小时。
10. There a combined cycle gas turbine power plant equipped with two units of PG6541. The gas turbine generator sets were made by GE USA in 2000. The fuel for the gas turbine is Heavy Fuel Oil or natural gas. Steam turbine, boiler were made by Chinese producers. Total capacity, including Steam turbine generator capacities, is about 100mw. Total running hour is about 25000 hours. The power plant is located in Jiangsu China.
11. There a combined cycle gas turbine power plant equipped with one unit of PG6541. The gas turbine generator sets were made by GE China JV in 1997. The fuel for the gas turbine is light diesel oil. Total capacity, including Steam turbine generator capacities, is about 50mw. Total running hour is about 10000 hours. The power plant is located in Zhejiang China.
12. 在浙江1台南汽厂1997年生产的PG6541燃气轮机联合循环机组,带锅炉和汽机,烧柴油,总功率在5万千瓦,已达行10000小时。
13. There a combined cycle gas turbine power plant equipped with three units of PG6541 and PG6551 produced by GE China JV in 1994, 1995, 1996 respectively. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 50mw. Total capacity is bout 150mw. Total running hour is from 10000-20000 hours. The power plant is located in Jiangsu China.
14. 在江苏共有3台南汽厂1994、1995、1996年生产的PG6541和PG6551燃气轮机联合循环机组,带锅炉和汽机,烧天然气、柴油均可,功率均在5万千瓦左右,运行小时数约1万至2万小时。
15. There a combined cycle gas turbine power plant equipped with two units of PG6541 produced by France Alstom with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Total capacity including Steam turbine generator capacities, is about 100mw. Total running hour is from 25000 hours. The power plant is located in Guangdong China.
16. 在广东有2台由法国阿尔斯通生产的PG6541燃气轮机联合循环机组,带锅炉和汽机,烧重油、柴油均可,功率均在10万千瓦左右,运行小时数约2.5万小时。
17. There a combined cycle gas turbine power plant equipped with two units of PG6581 produced by GE China JV in 2002 with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 60mw. Total capacity is bout 120mw. Total running hour is from 20000 hours. The power plant is located in Guangdong China.
18. 在广东有2台由南汽厂在2002年生产的PG6581燃气轮机联合循环机组,带锅炉和汽机,烧重油、柴油均可,总功率在12万千瓦左右,运行小时数约2万小时。
19. There a combined cycle gas turbine power plant equipped with ONE units of PG9171E produced by France Alstom. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Single cycle capacity is about 123.4mw. and the Steam Turbine was produced by Harbin, with rated power of 56MW. Boiler was produced by Hangzhou. Total capacity is bout 180mw for the combined cycle plant. The power plant is located in Shandong China.
20. 在山东有1台法国阿尔斯通公司生产为PG9171E燃气轮机联合循环机组,可烧燃料:天然气、轻油、重油均可;
发电机输出功率123.4MW;蒸汽轮机由哈尔滨汽轮机厂生产;
设计功率:56MW;锅炉由杭州锅炉厂主产。联合循环的总功率达到18万千瓦。
The quotation for these used gas turbine generator power is about 4298507.463 USD to 12537313.45 USD for each unit of Gas Turbine Generator with available used auxiliaries as where they are on site without warranty.
By additional contracts:
1. Dismantling, packing, and transportation to China ports.
2. We can also provide engineering of the plant to be installed with the used plant, supervision on installation and commissioning.
4. Maintenance and operation for the whole plant.
If you are interested in the used plant of gas turbine, please send us your documents on your projects to show us that your project is ready and financing is ready. And then we will send you detailed specification with picture of the plant.
We have successfully provide EPC contracting services for 4 units of used combined cycle PG6541 made by French Alstom from China to Ghana, including used equipments supply, dismantling, packing, transportation, overhaul, renovating, engineering, diagnosing, installing, and commissioning. Modification includes combustion system from HFO to natural gas, control system update from Mark IV to Mark VI.
Heat Efficiency and quotation on Chinese QD128 Gas turbine Combined cycle power plant
The efficiency of QD128 combined cycle power plant as I have sent you the proposal and specficication is about 40%m and the parasisitic power consumption is 450kw.
The quotation of the combined cycle power is about 6769230USD per unit, FOB China port, and of course it will change to technical and financing conditions. You are welcome to inspect our power plant projects in China by using our QD128 gas turbine generator which can use both gas and diesel oil as fuel.
Gas turbine Totally Explained Spare part Totally Explained
1. SGT-400:gas turbine (without alternator), control system, reducer, all from Siemens UK, 7 million USD, FOB China port, if you buy 4 sets, price will be reduce by 5-8% depending on tariff/transportation arrangement.
2. SGT-400 gas turbine generator sets, including SGT-400 gas turbine, generator, common frame, High/Low voltage panels, control system, reducer, container, boiler, 6mw steam turbine generator set, FOB China port quotation: 12.8 million USD per unit.
To your power project, we can deliver our Gas turbine generator and as following without restriction for financing from China, if you need GE or Siemens gas turbine generator sets, then your financing should be from China.
Here is the configuration by Saturn gas turbine generator sets for your project:
1×GTG(110MW)+ 1×HRSG+1×STG(48MW) combined cycle power plant technical specification:
1. Gas Turbine Generator Unit
GT Type: GTD-110
Quantity: 1 unit
Rated Output: 110MW (ISO condition)
Thermal Efficiency: 34.5%
2. HRSG
HRSG Type: Horizontal type, double drum
Quantity: 1 unit
HP Steam Rated Flow: 147 t/h
HP Steam Pressure: 6.0MPa.a
HP Steam Temperature: 500 ℃
LP Steam Rated Flow: 38t/h
LP Steam Pressure: 0.515MPa.a
LP Steam Temperature: 230℃
Flue Gas Exhaust Temperature: 105℃
3. Steam Turbine Generator Unit
ST Type: Single cylinder, Double pressure, Condense type.
Quantity: 1 unit
Rated Output: 48 MW (ISO condition)
Heat Rate: 12065 kJ/(kW•h)
Steam Rate: 3.059 kg/(kW•h)
|