Budgetary quotation and equipment list for 2x38MW+2x16MW combined gas turbine power plant
This quotation and equipment list is only for your information without any binding force upon both sides. Although the quotation does not include civil construction, installation, commissioning, auxilliary materials, tools for installation and commissioning, storage room, water supply, national grid, and office, we can provide them as EPC or turnkey contractor from China, with high quality, good service and attractive prices.
The gas turbine is GE licensed to Chinese producer and strictly designed, manufactured, assembled, tested to GE standard. Also 6B gas turbine of 42mw, 9E Gas turbine of 125MW units are available too.
NO. |
Item Name |
Expenses (RMB104) |
Expenses (USD) |
Remarks |
1 |
燃气轮发电机�?/FONT> (天然�?/FONT>) |
21,000.00 |
27,272,727 |
/FONT> |
/FONT> |
Gas turbine set (natural gas) |
/FONT> |
/FONT> |
/FONT> |
2 |
热力系统 |
10,672.35 |
13,860,188 |
/FONT> |
/FONT> |
Thermodynamic system |
|
|
/FONT> |
3 |
给排水系�?/FONT> |
198.72 |
258,078 |
/FONT> |
/FONT> |
Supply & Drainage water system |
|
|
/FONT> |
4 |
水处理系�?/FONT> |
122.59 |
159,208 |
/FONT> |
/FONT> |
Demineralized water system |
/FONT> |
|
/FONT> |
5 |
电气系统 |
4,272.02 |
5,548,078 |
/FONT> |
/FONT> |
Electrical system |
|
|
/FONT> |
6 |
热控系统 |
1,121.25 |
1,456,169 |
/FONT> |
/FONT> |
The thermal control and instrumental system |
|
|
/FONT> |
7 |
附属生产设备 |
133.40 |
173,247 |
/FONT> |
/FONT> |
Subsidiary production equipment |
/FONT> |
|
/FONT> |
/FONT> |
�?/FONT> �?/FONT>subtotal |
37,520.33 |
48,727,695 |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
8 |
主要材料 |
1,403.92 |
1,823,273 |
/FONT> |
/FONT> |
Main materials |
/FONT> |
/FONT> |
/FONT> |
9 |
包装、国内运输�商检�?/FONT> |
1,000.00 |
1,298,701 |
|
/FONT> |
Expense for internal transportation and commodities inspect |
|
|
Estimated |
10 |
海运、保险费 |
520.00 |
675,325 |
|
/FONT> |
Expense for internal transportation and commodities inspect |
/FONT> |
|
Estimated |
11 |
设计�?/FONT> |
1,200.00 |
1,558,442 |
/FONT> |
/FONT> |
Design expenses |
/FONT> |
|
/FONT> |
12 |
安装工程�?/FONT> |
0.00 |
0 |
not quoted |
/FONT> |
Installation engineering |
/FONT> |
|
/FONT> |
13 |
土建工程 |
0.00 |
0 |
not quoted |
/FONT> |
Constructional engineering |
/FONT> |
|
/FONT> |
14 |
不可预见�?/FONT> |
0.00 |
0 |
not quoted |
/FONT> |
Reserved expense |
/FONT> |
|
6-10% of total |
15 |
建设期利�?/FONT> |
0.00 |
0 |
not quoted |
/FONT> |
Accrual |
/FONT> |
|
/FONT> |
/FONT> |
/FONT> |
/FONT> |
|
/FONT> |
/FONT> |
�?/FONT> �?/FONT>subtotal |
4,123.92 |
5,355,740 |
/FONT> |
|
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
合计 |
41,644.25 |
54,083,435 |
/FONT> |
/FONT> |
Total expenses |
/FONT> |
/FONT> |
/FONT> |
Remarks: the quotation does not include civil construction, installation, commissioning, auxilliary materials, tools for installation and commissioning, storage room, water supply, national grid, and office
Usd to RMB rate is 1:7.73
|