Now in this financial crisis times, you are looking for financing for your power plant projects, here is your solution with our EPC contracting plus financing from China Exim to help you.
China Gas Turbine Generator Set
In China there are two types of gas turbine generator power plant: one type is based on China technology, most of them are produced by airplane manufacturers in China, another type is produced by steam turbine producers who usually are licensed from GE technolgy for higher capacity over 40mw, such as GE 6B, GE 9E, GE 9FA, they are of the same technical level as GE produced, but price mightbe little lower due to manufactured in China. Recently, Siemens gas turbine of SGT200 , was also adopted to manufacture co generation, single and combined cycle gas turbine power plant in China. Other Siemens gas turbine of 12mw, 17mw can be found.
For big Siemens gas turbine generator sets, as Sgt 5-4000f: Siemens gas turbine generator of 270mw (HRSG system can be of 130MW)and Sgt 5-2000e: Siemens gas turbine generator of 160mw (HRSG system can of 90mw). But before we are approved to supply Iran, we should get the exact project information so that let Siemens HQ to approve. But when the financing is from China, then the possbility of approval to supply is very high.
We can adopt these gas turbine to set up power plant fueled by natural gas, coke oven gas, biomass gas or other gas from coal mine. They can be single cycle without heat recovery boiler and steam turbine and combined cycled with heat recovery boiler and steam turbine for higher efficiency due to recover the exhaust gas heat. The gas turbine can provide both power and heat as co-generation set or just wholy provide power or electricity.
Apart from brand new gas turbine power plant or generator sets from 2mw, 10mw, 42mw (6B, PG6581B), 125mw (9E PG9171B) , 9FA GE gas turbine generator for single cycle, we also provide used or second hand gas turbine powered power plant from China, they are still in good condition, most of them are of combined cycle with HRSG system or heat recovery steam turbine+generator sets for higher capacity and efficiency.
If you want us to quote to you, the very simple required data is the gas composition, heat value, and gas pressure, so that we can choosed the type of gas turbines.
Good news is that we now established strategy relationship with our GE authorized spare parts OEM producers and batch suppliers so that we can supply to the world market geniue and real high quality GE gas turbine spare parts. for details, please check the following tittles with hyperlinks about gas turbine spare parts, and please supply us your GE gas turbine generator spare part names, code or serial number, so that we can quicken our quotation process. For example: Magnetic clutch assembly ASM 20CF along with drive shaft part No.91450326P002 for GE Gas Turbine,Frame 5,Model NoPG5371PA, quotation is about FOB HONGKONG USD 31350, 14 WEEKS.
And here you can find more information on our GE gas turbine spare parts. And in every webpage, you can also use the web search function, by just filling the search box the the top right corner of each page with your key word, you will find more on specific contents.
1. 2MW Cogeneration Gas Turbine Generator set(China technology)
2. 7mw Siemens SGT200 Gas Turbine Cogeneration unit (Siemens Technology)
3. 10MW Combined Gas Turbine Generator set(China technology)
4. 42MW Gas Turbine Generator(GE technology)
5. 9E and 9F Gas Turbine from GE technology
Australian Exporters | Importers
Xitij Web Directory
Canadian Importers | Exporters
Web World Directory - A human indexed directory of quality sites offering paid listings. Suggest your site for inclusion!
Trade with America - Importer and Exporter Database
21 Units of Used Gas Turbine Generator Power Plants Available from China
Here are the used gas turbine generator power plants available after their retreat from commercial operation.
1. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw. Total running hour is about 1000 hours. The power plant is located in Liaoning China.
2. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6531 made by GE China Joint Venture in 1992. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 50mw Total running hour is about 35000 hours. The power plant is located in Guangdong China.
3. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6561 made by GE China Joint Venture in 2001. The fuel for the gas turbine is natural gas. Total capacity, including Steam turbine generator capacities, is about 56mw Total running hour is about 32000 hours. The power plant is located in Guangdong China.
4. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw Total running hour is about 1000 hours. The power plant is located in Shanxi China.
5. 在陕西南京汽轮电机集团有限责任公?001年生产的PG6561单台联合循环燃气轮机,加汽轮机功率为5.6万千瓦,烧天然气,运行小时约小时?/DIV>
6. There a combined cycle gas turbine power plant equipped with two units of PG6531. The gas turbine generator sets were made by Brown, UK. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator (made by Siemens) capacities, is about 108mw Total running hour is about 25000 hours. The power plant is located in Shandong China.
7. 在山东PG6531B燃气轮机?#?#机),制造厂:英国布郎公司; 烧重油;汽轮机(3#机)制厂:德国西门子公司,总功率:10.8千瓦,运行小时数25000小时?/DIV>
8. There a combined cycle gas turbine power plant equipped with two units of PG6541. The gas turbine generator sets were made by GE USA in 2000. The fuel for the gas turbine is Heavy Fuel Oil or natural gas. Steam turbine, boiler were made by Chinese producers. Total capacity, including Steam turbine generator capacities, is about 100mw. Total running hour is about 25000 hours. The power plant is located in Jiangsu China.
9. 在江?2台美国GE公司生产的PG6541燃气轮机联合循环机组,锅炉和汽机均国产,烧天然气、柴油均可,总功率在10万千瓦,已运?5000小时?/DIV>
10. There a combined cycle gas turbine power plant equipped with two units of PG6541. The gas turbine generator sets were made by GE USA in 2000. The fuel for the gas turbine is Heavy Fuel Oil or natural gas. Steam turbine, boiler were made by Chinese producers. Total capacity, including Steam turbine generator capacities, is about 100mw. Total running hour is about 25000 hours. The power plant is located in Jiangsu China.
11. There a combined cycle gas turbine power plant equipped with one unit of PG6541. The gas turbine generator sets were made by GE China JV in 1997. The fuel for the gas turbine is light diesel oil. Total capacity, including Steam turbine generator capacities, is about 50mw. Total running hour is about 10000 hours. The power plant is located in Zhejiang China.
12. 在浙?台南汽厂1997年生产的PG6541燃气轮机联合循环机组,带锅炉和汽机,烧柴油,总功率在5万千瓦,已达?0000小时?/DIV>
13. There a combined cycle gas turbine power plant equipped with three units of PG6541 and PG6551 produced by GE China JV in 1994, 1995, 1996 respectively. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 50mw. Total capacity is bout 150mw. Total running hour is from 10000-20000 hours. The power plant is located in Jiangsu China.
14. 在江苏共?台南汽厂1994?995?996年生产的PG6541和PG6551燃气轮机联合循环机组,带锅炉和汽机,烧天然气、柴油均可,功率均在5万千瓦左右,运行小时数约1万至2万小时
15. There a combined cycle gas turbine power plant equipped with two units of PG6541 produced by France Alstom with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Total capacity including Steam turbine generator capacities, is about 100mw. Total running hour is from 25000 hours. The power plant is located in Guangdong China.
16. 在广东有2台由法国阿尔斯生产的PG6541燃气轮机联合循环机组,带锅炉和汽机,烧重油柴油均可,功率均?0万千瓦左右,运行小时数约2.5万小时
17. There a combined cycle gas turbine power plant equipped with two units of PG6581 produced by GE China JV in 2002 with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 60mw. Total capacity is bout 120mw. Total running hour is from 20000 hours. The power plant is located in Guangdong China.
18. 在广东有2台由南汽厂在2002年生产的PG6581燃气轮机联合循环机组,带锅炉和汽机,烧重油柴油均可,功率?2万千瓦左右,运行小时数约2万小时
19. There a combined cycle gas turbine power plant equipped with ONE units of PG9171E produced by France Alstom. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Single cycle capacity is about 123.4mw. and the Steam Turbine was produced by Harbin, with rated power of 56MW. Boiler was produced by Hangzhou. Total capacity is bout 180mw for the combined cycle plant. The power plant is located in Shandong China.
20. 在山东有1台法国阿尔斯通公司生产为PG9171E燃气轮机联合循环机组,可烧燃料:天然气轻油、重油均可;
发电机输出功?23.4MW;蒸汽轮机由哈尔滨汽轮机厂生产;
设计功率?6MW;锅炉由杭州锅炉厂主产联合循环的功率达到18万千瓦
The quotation for these used gas turbine generator power is about 4298507.463 USD to 12537313.45 USD for each unit of Gas Turbine Generator with available used auxiliaries as where they are on site without warranty.
By additional contracts:
1. Dismantling, packing, and transportation to China ports.
2. We can also provide engineering of the plant to be installed with the used plant, supervision on installation and commissioning.
4. Maintenance and operation for the whole plant.
If you are interested in the used plant of gas turbine, please send us your documents on your projects to show us that your project is ready and financing is ready. And then we will send you detailed specification with picture of the plant.
We have successfully provide EPC contracting services for 4 units of used combined cycle PG6541 made by French Alstom from China to Ghana, including used equipments supply, dismantling, packing, transportation, overhaul, renovating, engineering, diagnosing, installing, and commissioning. Modification includes combustion system from HFO to natural gas, control system update from Mark IV to Mark VI.
Gas turbine Totally Explained Spare part Totally Explained
|