Scope of supply of 2x2mw gas turbine generator: main equipments of gas turbine generator, quotation, shipment, delivery, warranty, spare part, documentation
China National Electric Wire&Cable Imp./Exp. Corp  BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Diesel generator   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine & spare parts > 2MW Gas Turbine Generator - Scope of supply of 2x2mw gas turbine generator


 

Scope of supply of 2x2mw gas turbine generator

Quotation on Combined 2x2mw gas turbine power plant

1.    The scope of Power Station projection except gas fuel compressor or booster

1.1Main Parts of power Plant
QDR20 type combined gas turbine power station mainly includes three portions.QDR20 gas turbine genset, heat-recovery boiler (only needed for combined or cogeneration) plus Steam turbine generator, and civil engineering, periphery civil works. QDR20 type gas turbine genset operation process is that AC generator driven by WJ6G1 type core turbine to generate electricity, and recovery boiler utilizes the high temperature exhaust flue gas to product steam for consumer using in their works or lives. That is heat-electricity co-generating genset system. And if the steam is used to propel the Steam Generator, then it is called combined cycle power plant. Combined cycle plant will increase the heat efficiency.
 
1.2 Main Equipments of the power plant
Main equipments include core gas turbine, specific coupling, AC syn-generator, genset skid and underbase, gas fuel regulation equipment, turbine lubrication oil system, generator lubrication including heating oil system, electrical package, fire and gas detection and steam extinguish system, intake air filter, turbine site ventilation intake and exhaust system, silencer for genset, exhaust equipment of turbine, genset holding down bolts.
 
1.3 Civil and construction
Civil works of power station include genset chamber, cooling water pool, crane rail on genset site, centre controlling chamber, electrical chamber, auxiliaries room, boiler site, gas fuel increasing pressure and controlling equipments, periphery roads, enclosure of power station, lighting, water supply, earthening, lightning resistor, air-conditioner, ventilation fan, fire protection equipments, genset silencing door on site, observation windows and so on associated hidden civil works.
Periphery engineering
 
1.4 Seller supply
The seller undertakes the front portions that include manufacturing, genset package, installation, testing, commissioning and delivery with full guarantee with one year or 8000 running hours of gas turbine.
 
1.5 Buyer’s supply
The buyer undertakes site civil works and periphery engineering and civil construction.
The termination or interface points of the projection can be confirmed when two parts discuss technical and commercial terms.
The consumer supplies QDR20 type genset natural gas fuel, pipelines convey steam at pressure 1.27Mpa temperature 300�? water at pressure above 0.35Mpa complying with civil drinking water standard and accepts output electricity. The generator plate voltage is 10.5 or 6.3 kilo-voltage. and supplies starting power with capacity 315KVA.communication connection, associated termination points, cooling and soften water which boiler intake water connected from outside power station 1m far Low-voltage source inputs low-voltage chamber. High-voltage electricity output from station. Natural gas fuel inputs filter termination point. Steam pipelines connected after reducing temperature and pressure equipment. (the above data is only for example, and should be provided by buyer to meet the demand)
 
2. Quotation on 2x2mw combined cycle power plant
 
3. Quotation Remarks
3.1 The QDR20 gas turbine is adopted from gas turbine from military usage and reconditioned to achieve high quality.
3.2 The QDR20 gas turbine genset is of containerized type, but does not inclue cubicle for control systems and panels.
3.3 The validity is of six months
 
4. Shipment
The gas turbine power plant will be shipped to site for installation, each gas turbine genset needs one container, and balance equipments need one 40 feet standard container. Total weight is about 80 tons.
 
5. Delivery and Warranty
5.1 Delivered within 10 months
5.2 Installation period: if everything is ready, 60-90 days after equipments shipped to site.
5.3 Commissioning: all the needed condition met at site, including cooling water, grid netword, fuel and gas, then commissioning will be finished in 20 days.
5.4 Warranty: one year after delivery, or 8000 hours for gas turbine.
 
6. Spare Parts
The average annual cost for spare parts for one unit of gas turbine genset is about 26000 USD for Ex-works quotation.
 
7. Documentation
7.1 WJ6G1Gas turbine operation and maintenance manual: two sets.
7.2 QD20gas turbine power plant operation manual two sets.
7.3 Quality certificates for equipments, and related drawings
7.4 Documentations on installation, commissioning, and testing.
8. Options
Or we can only provide equipments, design, supervision, commissioning, training. Others are undertaken by the buyers.