|
Original GE Series of Gas Turbine Spare Parts from GE
Famous Chinese Gas Turbine Power Plant Get Full Support from GE JV
We are one of the most famous Chinese power plant projects EPC contractors from China, including GE gas turbine power plant, and most of our power projects are installed with GE gas turbine generator sets of 6B, 9E, 9FA through financing from our Exim bank financing of soft loan, buyer's credit, and when we signed contracts as EPC contractor, the foreign buyers usually offer us O&M contracts, so we have to get a lot of GE gas turbine spare parts, which have signed Technical Transfer Agreement from GE.
GE Original gas turbine generator spare parts
As we Chinese producers has established joint ventures to produce GE Frame 6, Frame 9, 9FA gas turbine generator sets, GE and our gas turbine generator producers have set up a GE original spare parts supplying, with a goal to supply GE original gas turbine generator spare parts directly to our buyers in China of GE gas turbine generator, such as GE 6B, 9E and 9F in a very short supply time, and also most importantly to supply the real and original GE gas turbine spare parts to the end users.
These GE gas turbine spare parts for 6B, 9E and 9F and MS5001, PG6581B, 9E, 9FA or other GE gas turbine generators in the GE gas turbine series, are designed and manufactured by GE in USA or European production bases, and some of them are producers by Chinese joint ventures with GE under technical transfer Agreements, so the gas turbine spare parts are of high quality and certified by GE, they are not OEM products, not refurbished, not aftermarket parts, which are usually much cheaper than the Original GE spare parts.
By GE original, we mean that these spare parts are directly quoted from GE global quotation and supplying chain system, the gas turbine generator spare parts are designed and manufactured by GE or GE certified manufacturers in the world. Most of these spare parts will have GE log or certificates with the spare parts and most important is that these spare parts have Warranty to GE specification and terms.
Other Terms for quotations for GE gas turbine spare parts:
1) Origin.
Origin is from GE global, exact country still not known before we place order with GE suppliers
2) Can you please advise us shipment via air or sea to us?
Usually we can delivery to your destinations, by sea or air, but if you pay by L/C, then by Sea transportation.
3) Earliest delivery period.
Can not be informed, until we placing order to GE, usually if there is stock available in GE stock, 6 weeks, if not, then 12-24 weeks. But stock availability is dynamically changed due to online ordering by distributors in the world.
4) Price valid for 60 days.
Usually 40days, sometimes can be 60 days even to 90 days..
5) Estimated total weight for all items.
Not available now.
6) What will be the payment term in the event of order confirmation?
First option: 30% by T/T 7 days after Purchase order, and 70% by T/T within 10 days after notice from seller that the parts are delivered, but parts can be inspected by buyers before payment if needed by buyer.
Option 2: if total amount is less than 30000USD, then we need payment arrangement is 100% by T/T 7 days after purchase order.
Option 3: 30% by T/T 7 days after contract, balance by transferrable/irrevocable L/C issued within 10 days after contract.
7) Documents available?
Packing list, commercial invoice, B/L or air way bill (AWB). Third party documents are acceptable.
8) Warranty?
One year after first delivery.
Why some OEM parts quotations are competitive?
you can get the answer from the following mails we exchanged with others:
Dear China National Electric Wire & Cable,
Our company plans to buy some spare parts to replace old equipment or materials.
I got you and your price is very excited, but after it scroll down I know that the parts are NOT OEM. In closed time our company planned to buy Parts Combustion especially Cross Fire Tube Male P/N 169D3493G001 and Cross Fire Tube Female P/N 169D3494G001.
Your price is $ 286.2 each.
Could you inform us the price if your spare parts are made of OEM specify materials.
Or could you inform us if you have not OEM parts where can we get or buy the OEM spare parts.
Our company has 6 Gas Turbine and need not only for cross fire tube, other spare parts often bought like bucket, nozzle, shroud, e.t.c.
Your information is very important for us to get exactly thing with true price.
Waiting for your soon reply.
Thank you.
Replied:
From the line we are sure that you are professional buyer, so we are ready to provide you with our professional service to your requirements.
The attached parts are produced by former GE OEM producer in USA with the same material and design and specification with these that are produced by GE French OEM. We have been in the gas turbine EPC and supplying business for the past 20 years, and have established firm cooperation with GE and GE OEM in the world. In order to reduce the cost GE has moved some parts production from USA to EU nation. So we can offer you much lower price than these from French GE OEM.
So if you are pleased with our genuine OEM parts or these producers who were GE's former OEM prodcuers from USA, please provide us with your P/N for all the parts to be used in your plants
With My Best Regards,
yang chun lin
Project Manager
China National Electric Wire & Cable Imp./Exp. Corp.
Email:ycl1227@163.com
Tel: 0086 10 85805516
Fax: 0086 10-84568952
Mobile: 0086 13801218512
D-803, Shengshijiayuan, Road 98, Jianguo, Beijing 100022, China
Gas Turbine Spare Parts from Independent Producers of OEM Producer
Thanks to our reputation in the market of GE gas turbine spare parts and GE gas turbine power plant contracting, we are entrusted by many GE gas turbine spare parts producers or OEM proucers from the world to promote their parts in the world market. Most of them have been producing GE gas turbine spare parts for decades which are 100% interchangable with these from OEM producers. Gas turbine spare parts are available in stock or can be re engineered to specification provided by buyers in hours or days. Here is the Gas Turbine flexible couplings, bearing and seals for one example from USA.
Sample Quotation on GE Gas Turbine Spare Parts
|
Item |
GE gas turbine generator spare parts name |
GE gas turbine generator spare parts p/n |
|
|
1 |
COUPLING , --: SIZE: 200 MM ID X (155 |
307A9219G001 |
|
|
 /DIV> |
MM X 234 MM X 245 MM X 420 MM X 635 MM) |
 /DIV> |
|
|
 /DIV> |
OD X 1 M AND 650 MM LGMATERIAL: STL; |
 /DIV> |
|
|
 /DIV> |
ADDITIONAL DATA: 38 MM, 14 MM HOLE DIA, |
 /DIV> |
|
|
 /DIV> |
ACCESSORY WITH MOUNTING HARDWARE. GE |
|
|
 /DIV> |
POWER SYSTEM 307A9219G001 APPLICATION: |
 /DIV> |
|
|
 /DIV> |
 /DIV> |
 /DIV> |
|
|
2 |
TC2000 (C) EXP. ANALOG I DS200TCCBG1B |
DS200TCCBG1B |
|
|
 /DIV> |
 /DIV> |
 /DIV> |
|
|
3 |
SHAFT: CLUTCH GE 4015G63-001 P |
4015G63001P |
|
|
 /DIV> |
GE-MS7001B |
 /DIV> |
|
|
4 |
VH14 Module Control |
GM499061P003 |
|
|
6 |
NAICS: 517910 CARD CONTROL ACRONYM "TCEA" CARD. USE- EMERGENCY OVERSPEED BOARD LOCATED IN GAS TURBINE CONTROL CAB (MML15). CARD MUST BE NEW AND UNUSED; NO REMANUFACTURED CARDS ARE ACCEPTABLE."GE" MARK V SPEEDTRONIC CONTROL CARD #DS200TCEAG1A |
DS200TCEAG1A |
|
|
 /DIV> |
 /DIV> |
 /DIV> |
|
|
7 |
1.Maker - Voith, Turbine GmbH (Torque Converter) |
 /DIV> |
|
|
 /DIV> |
Type - 4 -SGE-2015-1 (Torque Converter) |
 /DIV> |
|
|
 /DIV> |
Torque - 600 (Torque Converter) |
 /DIV> |
|
|
 /DIV> |
 /DIV> |
 /DIV> |
|
|
8 |
2.Maker - Voith, Turbine GmbH (Reversing Gear) |
 /DIV> |
|
|
 /DIV> |
Type - E 7 WAT (Reversing Gear) |
 /DIV> |
|
|
 /DIV> |
E GT Code - 91-470493 P003 REVC (Reversing Gear) |
 /DIV> |
|
|
 /DIV> |
Printed Circuitboard, ISC UCVE, 1 ETH, 2 ISBUS Port |
 /DIV> |
|
|
 /DIV> |
Prod. No.: IS215UCVEM06A |
 /DIV> |
|
|
9 |
Hydraulic Valve Self Sequence Ratchet (VH14) (GE Part No. 277A2918P002) for Frame 6 |
277A2918P002 |
|
|
10 |
Stage Nozzle GE F 5 GE818 E 746 G009 |
818E746G009 |
|
|
11 |
Stage Nozzle GE F5 GE818E721G01 |
818E721G01 |
|
|
12 |
Stage Blade GEF5 GE733E 831P3 |
733E831P3 |
|
|
13 |
Stage Blade GEF5 GE772E 354 P4 |
772E354P4 |
|
|
14 |
BEARING , --: TYPE: THRUST; SIZE: 228 |
HP 192 B 3553 G9142D4720P001 |
|
|
 /DIV> |
MM ID X 480 MM OD X 64 MM TH; STYLE: |
 /DIV> |
|
|
 /DIV> |
PAD; SERIES: HEAVY; MATERIAL: STL; |
 /DIV> |
|
|
 /DIV> |
ADDITIONAL DATA: COMPLETE WITH PAD |
 /DIV> |
|
|
 /DIV> |
GENERAL ELECTRIC/DIELEKTROL/LENTRONICS |
 /DIV> |
|
|
 /DIV> |
P/N# HP 192 B 3553 G9142D4720P001 |
 /DIV> |
|
|
 /DIV> |
MFR P/N :BEARING: UNLOADED T6733051 |
 /DIV> |
|
|
 /DIV> |
MFR P/N :142D4720P001 |
 /DIV> |
|
|
15 |
Accessory Coupling Shaft With Both End Gear & Kit ( Frame �9E ) |
307A9220G001 |
|
|
16 |
3rd Stage Blade |
91313357G01 |
|
|
17 |
Shroud for the same |
91436807G001 |
|
|
18 |
1st Stage Shroud Block |
109B4316G001 |
|
|
19 |
2nd Stage Shroud Block |
91436806G001 |
|
|
20 |
Central Processor Unit |
44A726758-151R01 |
|
|
 /DIV> |
Module No. : IC697CPX772 |
|
|
 /DIV> |
Vender : GE |
|
|
21 |
1st stage nozzle |
818E0746G006 |
|
|
22 |
2nd stage nozzle |
818E0721G009 |
|
|
23 |
COUPLING , --: TYPE: FLANGE; SIZE: (140 MM X 184 MM X 234 MM X 314 MM)OD;X1MAND700MMLG;MATERIAL:STL;GENERALELECTRIC/DIELEKTROL/LENTRONICS P/N# 302A7695P001 MFR P/N :302A7695P001 |
302A7695P001 |
|
|
24 |
COVER ASSEMBLY NOZZLE 111E8989G001 |
111E8989G001 |
|
|
 /DIV> |
DRAW. NR: 111 E8989G001 |
 /DIV> |
|
|
25 |
IC3600SVSA1 |
IC3600SVSA1 |
|
|
 /DIV> |
Standard Lead Time: 15-17 WEEKS, 1 DAY |
 /DIV> |
|
|
 /DIV> |
Product Line :TC |
 /DIV> |
|
|
 /DIV> |
Description: HP SPEED SENSORS |
 /DIV> |
|
|
26 |
IC3600SOTE1 |
IC3600SOTE1 |
|
|
 /DIV> |
Standard Lead Time:15-17 WEEKS,1DAY |
 /DIV> |
|
|
 /DIV> |
ProductLine :TC |
 /DIV> |
|
|
 /DIV> |
Description: OVERTEMP |
 /DIV> |
|
|
27 |
First stage shroud segment ( complete ) |
329A3441G02 |
|
|
28 |
Plenum Exhaust |
118D5900G06 |
|
|
29 |
First stage bucket ( complete ) |
314B7158G003 |
|
|
 /DIV> |
+ Accessories / hardware x 2 |
 /DIV> |
|
|
30 |
Silencer Exhaust Asm. |
141D7553G01 |
|
|
31 |
STRAINER(P/N#362A3409P001) |
362A3409P001 |
|
|
 /DIV> |
DUPLEX, LUBE OIL TYPE FOR GE GAS TURBINES, GT#24, FR-7EA |
 /DIV> |
|
|
32 |
Accessory Coupling Shaft With Both End Gear & Kit 307A9220G001 |
307A9220G001 |
|
|
33 |
VALVE,BY-PASS,(NEW #154D7392G001),# 141D7151G001 FOR GE AUX. EQUIPMENTS, FLOW DIVIDERS &SWAGE LOCK FITTINGS, MFR: ROPER CO.,GE FRAME 7, JAZAN POWER STATION. |
154D7392G001 |
|
|
34 |
718C203G003 |
718C0203G005 |
|
|
 /DIV> |
Standard Lead Time: 7-9 WEEKS, 1 DAY |
 /DIV> |
|
|
 /DIV> |
Product Line :GAS |
 /DIV> |
|
|
 /DIV> |
718C0203G005 supercedes part 718C0203G003 |
 /DIV> |
|
|
 /DIV> |
Description: DEFLECTOR,OIL&AIR #3 BRG |
 /DIV> |
|
|
35 |
BUTEE PALIER HP Butée à patins |
91408710P001 |
|
|
36 |
Actuator, Woodword part No. 9904-1205, Sr. No. 15744022, EC rev-D, GE # 172A5150P002, GE#362A2372P001 |
172A5150P002 & 362A2372P001 |
|
|
37 |
Purge Valve, Actuator make : EL-O-Matic, |
 /DIV> |
|
|
 /DIV> |
Type : ES0600.U2G04A.27.K0, Sr. No. 185062002/08, Max.press : 8 Bar, |
 /DIV> |
|
|
 /DIV> |
Body Make : Fisher Controls |
 /DIV> |
|
|
 /DIV> |
Type : CV500, Sr. No. 118708842, Body : STL, Soft : SST, Size : 4, rating : CL300, Seat : CO Alloy, Ball/Disc : SST/PL |
 /DIV> |
|
|
38 |
Liquid fuel bypass valve, Sr. No. 13178, GE#354A1080P001 |
354A1080P001 |
|
|
39 |
BLADE TURBINE ST1 |
733E831P29 NEW P/N 314B7158G003 |
|
|
40 |
NOZZLE ARRGT. 1ST STAGE |
733E470G05 NEW P/N 149C3941G007 |
|
|
41 |
NOZZLE ARR. TURBINE STG.2 |
812E531G03 NEW P/N 812E0531G012 |
|
|
42 |
SHROUD SET,9001 3RD STG MATERIAL: AiSAi 410 + heat threated + forged + coating (plasma spray infront) |
329A3248G004 |
|
|
43 |
FRAME 5 (MS5001 N-Version) 2nd stage Turbine NOZZLES, 818E0721G009 or 818E531G03 |
818E0721G009 or 818E531G03 |
|
|
44 |
complete 1st stage nozzle P/N 10P-051-280-1 |
10P0512801 |
|
|
45 |
FRAME 6 ACCESSORY COUPLING P/N: 302A7694P001 |
302A7694P001 |
|
|
46 |
NOZZLE STG 1 (SET) |
109E3736G013 |
|
|
47 |
SHOROUD SET, TURBINE NOZZLE-3 STAGE |
91436807G001 |
|
|
48 |
SHOROUD SET, TURBINE NOZZLE-2 STAGE |
91436806G002 |
|
|
49 |
LINER BEARING |
91201293G01 |
|
|
50 |
RETAINING RING |
91101251G01 |
|
|
51 |
RING ASM, SUPPORT (SET) |
188D7762G004 |
|
|
52 |
BEARING , THRUST |
91408710P001 |
|
|
53 |
BLADE KIT, TB RTR STG1 |
314B7168G013 |
|
|
54 |
BLADE KIT, TURBINE ROTOR - STG2 |
314B7169G015 |
|
|
55 |
BLADE KIT, TB RTR STG3 |
314B7170G013 |
|
|
56 |
TRANSITION PIECE ARRNC |
101E2571G103 |
|
|
57 |
NOZZLE ASM. STG 2 (SET) |
119E2064G019 |
|
|
58 |
NOZZLE ASM. STG 2 (SET) |
112E6651G007 |
|
|
59 |
LINER BEARING (2) |
91012136G01 |
|
|
60 |
SEAL BRUSH ASSY-FWD |
227C9137G001 |
|
|
61 |
SEAL BRUSH ASSY-AFT |
227C9136G001 |
|
|
62 |
MOD-SEAL STA AIR, FWD |
122E1744G001 |
|
|
63 |
BEARING SEAL, BRG 2 |
142D4156G01 |
|
|
64 |
MOD-SEAL STA AIR, AFT |
112E1743G001 |
|
|
65 |
COMPRESSOR , AIR:TYPE:LOBE;CAPACITY:300 CFM;DISCHARGE PRESSURE:12 PSI;MOUNTING:FLOOR;STAGE:SINGLE;ADDITIONAL DATA:BOOSTER ATOMIZING AIR, 4000 RPM, FOR GA TURBINE STARTING SYSTEM. SER # 10163.GENERAL ELECTRIC/DIELEKTROL/LENTRONICS P/N# 298A7661P003 GARDNER DENVER MACHINERY/THOMAS PUMPS P/N# 298A7661P003 |
298A7661P003 |
|
|
66 |
 /DIV> |
DS3820PSCC |
|
|
 /DIV> |
001 MODULE,POWER SUPPLY: |
 /DIV> |
|
|
002 INPUT: |
|
|
003 28 V; |
|
|
004 ADDITIONAL DATA: |
|
|
005 GENERAL ELECTRIC/DIELEKTROL/LENTRONICS: |
|
|
006 DS3820PSCC |
|
|
67 |
Standard Lead Time: 44-46 WEEKS, 2 DAYS |
252C3966G009 supercedes part 178C6255G033 |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
252C3966G009 supercedes part 178C6255G033 |
|
|
Description: BL&RG STG1 9E G450 |
|
|
 /DIV> |
Refurbished options for:178C6255G033 |
|
|
 /DIV> |
Product Line : PS RP Gas |
|
|
68 |
 /DIV> |
252C3966G010 supercedes part 178C6255G034 |
|
|
|
 /DIV> |
Standard Lead Time: 44-46 WEEKS, 2 DAYS |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
252C3966G010 supercedes part 178C6255G034 |
|
|
Description: BL&RG STG2 9E G450 |
|
|
 /DIV> |
Refurbished options for:178C6255G034 |
|
|
 /DIV> |
Product Line : PS RP Gas |
|
|
69 |
 /DIV> |
252C3966G011 supercedes part 178C6255G035 |
|
|
|
 /DIV> |
Standard Lead Time: 41-43 WEEKS, 1 DAY |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
252C3966G011 supercedes part 178C6255G035 |
|
|
Description: BL&RG STG3 9E GECC |
|
|
 /DIV> |
Refurbished options for:178C6255G035 |
|
|
 /DIV> |
Product Line : PS RP Gas |
|
|
70 |
 /DIV> |
252C3966G012 supercedes part 178C6255G036 |
|
|
|
 /DIV> |
Standard Lead Time: 41-43 WEEKS, 1 DAY |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
252C3966G012 supercedes part 178C6255G036 |
|
|
Description: BL&RG STG4 9E GECC |
|
|
 /DIV> |
Refurbished options for:178C6255G036 |
|
|
 /DIV> |
Product Line : PS RP Gas |
|
|
71 |
 /DIV> |
178C6255G037 |
|
|
|
 /DIV> |
Standard Lead Time: 13-15 WEEKS, 2 DAYS |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
Description: BL&RG STG5 9E GECC |
|
|
 /DIV> |
Refurbished options for:178C6255G037 |
|
|
72 |
 /DIV> |
178C6255G038 |
|
|
|
 /DIV> |
Standard Lead Time: 13-15 WEEKS, 2 DAYS |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
Description: BL&RG STG6 9E GECC |
|
|
 /DIV> |
Refurbished options for:178C6255G038 |
|
|
73 |
 /DIV> |
178C6255G039 |
|
|
|
 /DIV> |
Standard Lead Time: 13-15 WEEKS, 2 DAYS |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
Description: BL&RG STG7 9E GECC |
|
|
 /DIV> |
Refurbished options for:178C6255G039 |
|
|
74 |
 /DIV> |
178C6255G048 |
|
|
|
 /DIV> |
Standard Lead Time: 13-15 WEEKS, 2 DAYS |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
Description: BL&RG STG8 9E |
|
|
 /DIV> |
Refurbished options for:178C6255G048 |
|
|
75 |
 /DIV> |
109E5112P001 |
|
|
|
 /DIV> |
Standard Lead Time: 19-21 WEEKS, 1 DAY |
|
|
 /DIV> |
Product Line :GAS |
|
|
 /DIV> |
Description: VANE,STATOR STG9 403CB |
|
|
 /DIV> |
Refurbished options for:109E5112P001 |
|
|
76 |
CARD AMS42 code L54C1300HJ00 |
L54C1300HJ00 |
|
|
 /DIV> |
rev 01 N FAB 01NG505 |
 /DIV> |
|
|
77 |
Shaft the turbine-supercharger |
235A5191P001 |
|
|
78 |
hydraulic valve |
277A2918P001 |
|
|
79 |
Booster Compressor |
298A7661P003 |
|
|
80 |
Pump Water |
302A1543P003 |
|
|
81 |
CPU Card |
IC697CPX772 |
|
Please advice to us; status of this inquiry for frame 5-P parts?
The part numbers are as follows:
1st stage nozzle (old tech): 818E746G01
2nd stage nozzle (old tech): 818E721G01
Someone might have a superseded version of the 1st stage nozzle (old tech) so you might eg.818E746G06.
Same for the 2nd stage a superseded p/n: 818E721G09 or you can offer new design.
These numbers are for the assemblies.
Answer: If you buy the two types of upgraded nozzle of: 818E0746G006, (which is replaced by 818E0746G009) and 818E0721G009 We can offer you very special price.
One set of BLADE KIT,TB RTR-STG1 F51 314B7158G003 including the the followings with FOB HK quotation of 143,100.00USD.
|
29 |
BLADE TURBINE ST1 |
733E831P29 |
120 |
143100 |
143100 |
|
|
|
|
|
|
|
31 |
PIN HORZ |
114A8569P07 |
120 |
|
|
|
|
|
|
|
|
|
33 |
PIN RADIAL SEAL |
114A6022P05 |
120 |
|
|
|
34 |
LOCK TWIST |
211A8627P04 |
120 |
|
|
|
|
|
|
|
|
One Set of BLADE KIT,TB RTR-STG2 F51 361B6349G001 including the the followings with FOB HK quotation of 143,100.00USD.
|
30 |
BLADE TURBINE ST2 |
772E354P02 |
90 |
|
|
|
|
|
|
|
|
|
32 |
PIN SEAL |
211A8731P02 |
90 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
35 |
LOCK TWIST |
211A8627P05 |
90 |
|
|
314B7164G014( INCLUDING ASSOCIATED HARDWARES) 3rd STAGE BUCKET FOR FRAME 6 GE GAS TURBINE has been replaced by 314B7164G023, and rough weight is about 350KG, normal delivery time is very long, but most probabaly there are stocks in in stock houses around the world, then delivery is weeks away.
REMARKS :- The purposed components can fit to all gas Turbine Frame 6 machine.
Here is the reply to your questions ON 314B7164G014( INCLUDING ASSOCIATED HARDWARES) -3rd STAGE BUCKET FOR FRAME 6 GE TURBINE 314B7164G023 REPLACES 314B7164G014
- Please advise us the quoted item including associated hardware. If yes, then give us the list of associated hardware.
92PCS 279A1706P001, BUCKET SEAL PIN
92PCS 279A1705P003 BUCKET SEAL PIN
92PCS 239B57, 91P006 TWIST LOCK
- Please advise us the weight 350kg you have given for one set or two set. If possible advise us the approx. volume so that we will calculate the freight charg, e. ,
EACH SET weight is about 350kg, each set volume or dimension is 140CMx120CMx60CM
- The validity of price you have given 30 days, I request you please extend it for 60 days because our client usually take 30-45 days to decide order and last date for the submission of quotation is 20/3/10.
Ok, we can offer you 60 days of validity from the date of quotation.
- Please advise us the quoted item will fit to all gas Turbine Frame 6 machine because our client asked the same in the enquiry.
Yes, IT FITS TO ALL F6 GAS TURBINE
- Please advise us the approx. delivery time so that the same we will mention in our quotation to client along with subject to prior sale.
GE STANDARD LEAD DELIVERY TIME IS 3 MONTHS, BUT IT IS POSSIBLE TO CHECK THE STOCK IN WORLD STOCK HOUSES FOR SHORTNED DELIVERY ONLY AFTER PURCHASE ORDER.
- Will it possible to you to give us good discount on quoted price so that I will make our offer more competitive to grab this order.
THE FINAL DISCOUNT CAN ONLYU BE APPLIED WITH GE ONLY AFTER YOUR SERIOUS INTENTION BY LETTER, BUT DISCOUNT IS NOT TOO MUCH.
- Please advise us have you received same enquiry from other company in Oman.
YES, AT LEASET I KNEW THIS IS A PUBLIC ENQUIRY BROADCASTED.
|