BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      Quotationon Used PG6551B gas turbine plant   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Diesel generator   
      8x8735kw MAN 18V32/40 HFO Diesel power Proposal   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      10x5.5MW MAN 12V32/40 HFO diesel plant proposal   
      3mw-9mw MAN 18V32/40 HFO Diesel generator   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine & spare parts > Gas Turbine Spare Parts


 
Original GE Series of Gas Turbine Spare Parts from GE
Famous Chinese Gas Turbine Power Plant Get Full Support from GE JV
We are one of the most famous Chinese power plant projects EPC contractors from China, including GE gas turbine power plant, and most of our power projects are installed with GE gas turbine generator sets of 6B, 9E, 9FA through financing from our Exim bank financing of soft loan, buyer's credit, and when we signed contracts as EPC contractor, the foreign buyers usually offer us O&M contracts, so we have to get a lot of GE gas turbine spare parts, which have signed Technical Transfer Agreement from GE.
 
GE Original gas turbine generator spare parts
As we Chinese producers has established joint ventures to produce GE Frame 6, Frame 9, 9FA gas turbine generator sets, GE and our gas turbine generator producers have set up a GE original spare parts supplying, with a goal to supply GE original gas turbine generator spare parts directly to our buyers in China of GE gas turbine generator, such as GE 6B, 9E and 9F in a very short supply time, and also most importantly to supply the real and original GE gas turbine spare parts to the end users.
 
These GE gas turbine spare parts for 6B, 9E and 9F and MS5001, PG6581B, 9E, 9FA or other GE gas turbine generators in the GE gas turbine series, are designed and manufactured by GE in USA or European production bases, and some of them are producers by Chinese joint ventures with GE under technical transfer Agreements, so the gas turbine spare parts are of high quality and certified by GE, they are not OEM products, not refurbished, not aftermarket parts, which are usually much cheaper than the Original GE spare parts.
 
By GE original, we mean that these spare parts are directly quoted from GE global quotation and supplying chain system, the gas turbine generator spare parts are designed and manufactured by GE or GE certified manufacturers in the world. Most of  these spare parts will have GE log or certificates with the spare parts and most important is that these spare parts have Warranty to GE specification and terms.
 
Other Terms for quotations for GE gas turbine spare parts:
1) Origin.
Origin is from GE global, exact country still not known before we place order with GE suppliers
2) Can you please advise us shipment via air or sea to us?
Usually we can delivery to your destinations, by sea or air, but if you pay by L/C, then by Sea transportation.
3) Earliest delivery period.
Can not be informed, until we placing order to GE, usually if there is stock available in GE stock, 6 weeks, if not, then 12-24 weeks. But stock availability is dynamically changed due to online ordering by distributors in the world.
4) Price valid for 60 days.
Usually 40days, sometimes can be 60 days even to 90 days..
5) Estimated total weight for all items.
Not available now.
6) What will be the payment term in the event of order confirmation?
First option: 30% by T/T 7 days after Purchase order, and 70% by T/T within 10 days after notice from seller that the parts are delivered, but parts can be inspected by buyers before payment if needed by buyer.
Option 2: if total amount is less than 30000USD, then we need payment arrangement is 100% by T/T 7 days after purchase order.
Option 3: 30% by T/T 7 days after contract, balance by transferrable/irrevocable L/C issued within 10 days after contract.
7) Documents available?
Packing list, commercial invoice, B/L or air way bill (AWB). Third party documents are acceptable.
8) Warranty?
One year after first delivery.
 
Why some OEM parts quotations are competitive?
 
you can get the answer from the following mails we exchanged with others:
 
Dear China National Electric Wire & Cable,
 
Our company plans to buy some spare parts to replace old equipment or materials.
I got you and your price is very excited, but after it scroll down I know that the parts are NOT OEM. In closed time our company planned to buy Parts Combustion especially Cross Fire Tube Male P/N 169D3493G001 and Cross Fire Tube Female P/N 169D3494G001.
Your price is $ 286.2 each.
Could you inform us the price if your spare parts are made of OEM specify materials.
Or could you inform us if you have not OEM parts where can we get or buy the OEM spare parts.
Our company has 6 Gas Turbine and need not only for cross fire tube, other spare parts often bought like bucket, nozzle, shroud, e.t.c.
Your information is very important for us to get exactly thing with true price.
Waiting for your soon reply.
Thank you.
 
Replied:
 
From the line we are sure that you are professional buyer, so we are ready to provide you with our professional service to your requirements.
 
The attached parts are produced by former GE OEM producer in USA with the same material and design and specification with these that are produced by GE French OEM. We have been in the gas turbine EPC and supplying business for the past  20 years, and have established firm cooperation with GE and GE OEM in the world. In order to reduce the cost GE has moved some parts production from USA to EU nation.  So we can offer you much lower price than these from French GE OEM.
 
So if you are pleased with our genuine OEM parts or these producers who were GE's former OEM prodcuers from USA, please provide us with your P/N for all the parts to be used in your plants
 
P.S. If you need China Eximbank financing or buy English book on EPC and Financing, please visit: China government exim bank finance against guarantee for projects, English book download
 
With My Best Regards,
 
yang chun lin
 
Project Manager
 
China National Electric Wire & Cable Imp./Exp. Corp.
Email:ycl1227@163.com
Tel: 0086 10 85805516
Fax: 0086 10-84568952
Mobile: 0086 13801218512
D-803, Shengshijiayuan, Road 98, Jianguo,  Beijing 100022, China
 
Gas Turbine Spare Parts from Independent Producers of OEM Producer
 
Thanks to our reputation in the market of GE gas turbine spare parts and GE gas turbine power plant contracting, we are entrusted by many GE gas turbine spare parts producers or OEM proucers from the world to promote their parts  in the world market. Most of them have been producing GE gas turbine spare parts for decades which are 100% interchangable with these from OEM producers. Gas turbine spare parts are available in stock or can be re engineered to specification provided by buyers in hours or days. Here is the Gas Turbine flexible couplings, bearing and seals for one example from USA.
 
Sample Quotation on GE Gas Turbine Spare Parts

Item
GE gas turbine generator spare parts name
GE gas turbine generator spare parts p/n
1
COUPLING , --: SIZE: 200 MM ID X (155  
307A9219G001
 /DIV>
MM X 234 MM X 245 MM X 420 MM X 635 MM)
 /DIV>
 /DIV>
OD X 1 M AND 650 MM LGMATERIAL: STL;   
 /DIV>
 /DIV>
ADDITIONAL DATA: 38 MM, 14 MM HOLE DIA,
 /DIV>
 /DIV>
ACCESSORY WITH MOUNTING HARDWARE. GE   
 /DIV>
POWER SYSTEM 307A9219G001 APPLICATION: 
 /DIV>
 /DIV>
 /DIV>
 /DIV>
2
TC2000 (C) EXP. ANALOG I DS200TCCBG1B
DS200TCCBG1B
 /DIV>
 /DIV>
 /DIV>
3
SHAFT: CLUTCH GE 4015G63-001 P          
4015G63001P
 /DIV>
GE-MS7001B                              
 /DIV>
4
VH14  Module Control
GM499061P003
6
NAICS: 517910  CARD  CONTROL  ACRONYM "TCEA" CARD. USE- EMERGENCY OVERSPEED BOARD  LOCATED IN GAS TURBINE CONTROL CAB (MML15). CARD MUST BE NEW AND UNUSED; NO REMANUFACTURED CARDS ARE ACCEPTABLE."GE" MARK V SPEEDTRONIC CONTROL CARD #DS200TCEAG1A
DS200TCEAG1A
 /DIV>
 /DIV>
 /DIV>
7
1.Maker    -    Voith, Turbine GmbH (Torque Converter) 
 /DIV>
 /DIV>
Type    -    4 -SGE-2015-1 (Torque Converter) 
 /DIV>
 /DIV>
Torque    -    600 (Torque Converter) 
 /DIV>
 /DIV>
 /DIV>
 /DIV>
8
2.Maker    -    Voith, Turbine GmbH (Reversing Gear) 
 /DIV>
 /DIV>
Type    -    E 7 WAT (Reversing Gear) 
 /DIV>
 /DIV>
E GT Code    -    91-470493 P003 REVC (Reversing Gear) 
 /DIV>
 /DIV>
Printed Circuitboard, ISC UCVE, 1 ETH, 2 ISBUS Port
 /DIV>
 /DIV>
    Prod. No.: IS215UCVEM06A
 /DIV>
9
 Hydraulic Valve Self Sequence Ratchet (VH14) (GE Part No. 277A2918P002) for Frame 6
277A2918P002
10
Stage Nozzle GE F 5  GE818 E 746 G009
818E746G009
11
Stage Nozzle GE F5   GE818E721G01
818E721G01
12
Stage Blade  GEF5    GE733E 831P3
733E831P3
13
Stage Blade  GEF5    GE772E 354 P4
772E354P4
14
BEARING , --: TYPE: THRUST; SIZE: 228  
HP 192 B 3553 G9142D4720P001
 /DIV>
MM ID X 480 MM OD X 64 MM TH; STYLE:   
 /DIV>
 /DIV>
PAD; SERIES: HEAVY; MATERIAL: STL;     
 /DIV>
 /DIV>
ADDITIONAL DATA: COMPLETE WITH PAD     
 /DIV>
 /DIV>
GENERAL ELECTRIC/DIELEKTROL/LENTRONICS 
 /DIV>
 /DIV>
P/N# HP 192 B 3553 G9142D4720P001      
 /DIV>
 /DIV>
MFR P/N :BEARING: UNLOADED T6733051    
 /DIV>
 /DIV>
MFR P/N :142D4720P001                  
 /DIV>
15
Accessory Coupling Shaft  With Both End Gear & Kit ( Frame â€?9E )
307A9220G001
16
3rd Stage Blade
91313357G01
17
Shroud for the same
91436807G001
18
1st Stage Shroud Block
109B4316G001
19
2nd Stage Shroud Block
91436806G001
20
Central Processor Unit
44A726758-151R01
 /DIV>
Module No. : IC697CPX772
 /DIV>
Vender : GE
21
1st stage nozzle
818E0746G006
22
2nd stage nozzle
818E0721G009
23
COUPLING , --: TYPE: FLANGE; SIZE: (140 MM X 184 MM X 234 MM X 314 MM)OD;X1MAND700MMLG;MATERIAL:STL;GENERALELECTRIC/DIELEKTROL/LENTRONICS P/N#  302A7695P001   MFR P/N :302A7695P001
302A7695P001
24
COVER ASSEMBLY NOZZLE   111E8989G001
111E8989G001
 /DIV>
DRAW. NR: 111 E8989G001
 /DIV>
25
IC3600SVSA1
IC3600SVSA1
 /DIV>
Standard Lead Time: 15-17 WEEKS, 1 DAY
 /DIV>
 /DIV>
Product Line :TC
 /DIV>
 /DIV>
Description: HP SPEED SENSORS
 /DIV>
26
IC3600SOTE1
IC3600SOTE1
 /DIV>
 Standard Lead Time:15-17 WEEKS,1DAY
 /DIV>
 /DIV>
ProductLine :TC
 /DIV>
 /DIV>
Description: OVERTEMP
 /DIV>
27
 First stage shroud segment ( complete )
329A3441G02
28
 Plenum Exhaust
118D5900G06
29
 First stage bucket ( complete )
314B7158G003
 /DIV>
  + Accessories / hardware x 2
 /DIV>
30
 Silencer Exhaust Asm.
141D7553G01
31
STRAINER(P/N#362A3409P001) 
362A3409P001
 /DIV>
DUPLEX, LUBE OIL TYPE                         FOR GE GAS TURBINES, GT#24, FR-7EA 
 /DIV>
32
Accessory Coupling Shaft With Both End Gear & Kit 307A9220G001
307A9220G001
33
VALVE,BY-PASS,(NEW #154D7392G001),# 141D7151G001 FOR GE AUX. EQUIPMENTS, FLOW DIVIDERS &SWAGE LOCK FITTINGS, MFR: ROPER CO.,GE FRAME 7, JAZAN POWER STATION.
154D7392G001
34
718C203G003
718C0203G005
 /DIV>
Standard Lead Time: 7-9 WEEKS, 1 DAY
 /DIV>
 /DIV>
Product Line :GAS
 /DIV>
 /DIV>
718C0203G005 supercedes part 718C0203G003
 /DIV>
 /DIV>
Description: DEFLECTOR,OIL&AIR #3 BRG
 /DIV>
35
BUTEE PALIER HP Butée à patins
91408710P001
36
Actuator, Woodword part No. 9904-1205, Sr. No. 15744022, EC rev-D, GE # 172A5150P002, GE#362A2372P001
172A5150P002 & 362A2372P001
37
Purge Valve, Actuator make : EL-O-Matic,
 /DIV>
 /DIV>
Type : ES0600.U2G04A.27.K0, Sr. No. 185062002/08, Max.press : 8 Bar,
 /DIV>
 /DIV>
Body Make : Fisher Controls
 /DIV>
 /DIV>
Type : CV500, Sr. No. 118708842, Body : STL, Soft : SST, Size : 4, rating : CL300, Seat : CO Alloy, Ball/Disc : SST/PL
 /DIV>
38
Liquid fuel bypass valve, Sr. No. 13178, GE#354A1080P001
354A1080P001
39
BLADE TURBINE ST1
733E831P29 NEW P/N 314B7158G003
40
NOZZLE ARRGT. 1ST STAGE
733E470G05 NEW P/N 149C3941G007
41
NOZZLE ARR. TURBINE STG.2
812E531G03 NEW P/N 812E0531G012
42
SHROUD SET,9001 3RD STG MATERIAL: AiSAi 410 + heat threated + forged + coating (plasma spray infront)
329A3248G004
43
FRAME 5 (MS5001 N-Version) 2nd stage Turbine NOZZLES, 818E0721G009 or 818E531G03 
818E0721G009 or 818E531G03
44
complete 1st stage nozzle P/N 10P-051-280-1
10P0512801
45
FRAME 6 ACCESSORY COUPLING P/N: 302A7694P001
302A7694P001
46
NOZZLE STG 1 (SET)
109E3736G013
47
SHOROUD SET, TURBINE NOZZLE-3 STAGE
91436807G001
48
SHOROUD SET, TURBINE NOZZLE-2 STAGE
91436806G002
49
LINER BEARING
91201293G01
50
RETAINING RING
91101251G01
51
RING ASM, SUPPORT (SET)
188D7762G004
52
BEARING , THRUST
91408710P001
53
BLADE KIT, TB RTR STG1
314B7168G013
54
BLADE KIT, TURBINE ROTOR - STG2
314B7169G015
55
BLADE KIT, TB RTR STG3
314B7170G013
56
TRANSITION PIECE ARRNC
101E2571G103
57
NOZZLE ASM. STG 2 (SET)
119E2064G019
58
NOZZLE ASM. STG 2 (SET)
112E6651G007
59
LINER BEARING (2)
91012136G01
60
SEAL BRUSH ASSY-FWD
227C9137G001
61
SEAL BRUSH ASSY-AFT
227C9136G001
62
MOD-SEAL STA AIR, FWD
122E1744G001
63
BEARING SEAL, BRG 2
142D4156G01
64
MOD-SEAL STA AIR, AFT
112E1743G001
65
COMPRESSOR , AIR:TYPE:LOBE;CAPACITY:300 CFM;DISCHARGE PRESSURE:12 PSI;MOUNTING:FLOOR;STAGE:SINGLE;ADDITIONAL DATA:BOOSTER ATOMIZING AIR, 4000 RPM, FOR GA TURBINE STARTING SYSTEM. SER # 10163.GENERAL ELECTRIC/DIELEKTROL/LENTRONICS P/N# 298A7661P003 GARDNER DENVER MACHINERY/THOMAS PUMPS P/N# 298A7661P003
298A7661P003
66
 /DIV>
 DS3820PSCC
 /DIV>
001  MODULE,POWER SUPPLY:
 /DIV>
002  INPUT:
003   28 V;
004  ADDITIONAL DATA:
005  GENERAL ELECTRIC/DIELEKTROL/LENTRONICS:
006   DS3820PSCC
67
Standard Lead Time: 44-46 WEEKS, 2 DAYS  
252C3966G009 supercedes part 178C6255G033
 /DIV>
Product Line :GAS
 /DIV>
252C3966G009 supercedes part 178C6255G033
Description: BL&RG STG1 9E G450
 /DIV>
Refurbished options for:178C6255G033
 /DIV>
Product Line : PS RP Gas 
68
 /DIV>
252C3966G010 supercedes part 178C6255G034
 /DIV>
Standard Lead Time: 44-46 WEEKS, 2 DAYS  
 /DIV>
Product Line :GAS
 /DIV>
252C3966G010 supercedes part 178C6255G034
Description: BL&RG STG2 9E G450
 /DIV>
Refurbished options for:178C6255G034
 /DIV>
Product Line : PS RP Gas 
69
 /DIV>
252C3966G011 supercedes part 178C6255G035
 /DIV>
Standard Lead Time: 41-43 WEEKS, 1 DAY  
 /DIV>
Product Line :GAS
 /DIV>
252C3966G011 supercedes part 178C6255G035
Description: BL&RG STG3 9E GECC
 /DIV>
Refurbished options for:178C6255G035
 /DIV>
Product Line : PS RP Gas 
70
 /DIV>
252C3966G012 supercedes part 178C6255G036
 /DIV>
Standard Lead Time: 41-43 WEEKS, 1 DAY  
 /DIV>
Product Line :GAS
 /DIV>
252C3966G012 supercedes part 178C6255G036
Description: BL&RG STG4 9E GECC
 /DIV>
Refurbished options for:178C6255G036
 /DIV>
Product Line : PS RP Gas 
71
 /DIV>
178C6255G037
 /DIV>
Standard Lead Time: 13-15 WEEKS, 2 DAYS  
 /DIV>
Product Line :GAS
 /DIV>
Description: BL&RG STG5 9E GECC
 /DIV>
Refurbished options for:178C6255G037
72
 /DIV>
178C6255G038
 /DIV>
Standard Lead Time: 13-15 WEEKS, 2 DAYS  
 /DIV>
Product Line :GAS
 /DIV>
Description: BL&RG STG6 9E GECC
 /DIV>
Refurbished options for:178C6255G038
73
 /DIV>
178C6255G039
 /DIV>
Standard Lead Time: 13-15 WEEKS, 2 DAYS  
 /DIV>
Product Line :GAS
 /DIV>
Description: BL&RG STG7 9E GECC
 /DIV>
Refurbished options for:178C6255G039
74
 /DIV>
178C6255G048
 /DIV>
Standard Lead Time: 13-15 WEEKS, 2 DAYS  
 /DIV>
Product Line :GAS
 /DIV>
Description: BL&RG STG8 9E
 /DIV>
Refurbished options for:178C6255G048
75
 /DIV>
109E5112P001
 /DIV>
Standard Lead Time: 19-21 WEEKS, 1 DAY  
 /DIV>
Product Line :GAS
 /DIV>
Description: VANE,STATOR STG9 403CB
 /DIV>
Refurbished options for:109E5112P001
76
CARD  AMS42   code L54C1300HJ00
L54C1300HJ00
 /DIV>
rev 01   N FAB  01NG505
 /DIV>
77
Shaft the turbine-supercharger
235A5191P001
78
hydraulic valve
277A2918P001
79
Booster Compressor
298A7661P003
80
Pump Water
302A1543P003
81
CPU Card
IC697CPX772

Please advice to us; status of this inquiry for frame 5-P parts?
The part numbers are as follows:
1st stage nozzle (old tech): 818E746G01
2nd stage nozzle (old tech): 818E721G01
Someone might have a superseded version of the 1st stage nozzle (old tech) so you might eg.818E746G06.
Same for the 2nd stage a superseded p/n: 818E721G09 or you can offer new design.
These numbers are for the assemblies.
 
Answer: If you buy the two types of upgraded nozzle of: 818E0746G006, (which is replaced by 818E0746G009) and 818E0721G009 We can offer you very special price.
 
One set of  BLADE KIT,TB RTR-STG1 F51  314B7158G003 including the the followings with FOB HK quotation of 143,100.00USD.
29
BLADE TURBINE ST1
733E831P29
120
143100
143100
31
PIN HORZ
114A8569P07
120
33
PIN RADIAL SEAL
114A6022P05
120
34
LOCK TWIST
211A8627P04
120
 
One Set of BLADE KIT,TB RTR-STG2 F51  361B6349G001 including the the followings with FOB HK quotation of 143,100.00USD.
30
BLADE TURBINE ST2
772E354P02
90
32
PIN SEAL
211A8731P02
90
35
LOCK TWIST
211A8627P05
90
 
314B7164G014( INCLUDING ASSOCIATED HARDWARES) 3rd STAGE BUCKET FOR FRAME 6 GE GAS TURBINE has been replaced by 314B7164G023, and rough weight is about 350KG, normal delivery time is very long, but most probabaly there are stocks in in stock houses around the world, then delivery is weeks away. 
REMARKS :- The purposed components can fit to all gas Turbine Frame 6 machine.
Here is the reply to your questions ON 314B7164G014( INCLUDING ASSOCIATED HARDWARES) -3rd STAGE BUCKET FOR FRAME 6 GE TURBINE 314B7164G023 REPLACES 314B7164G014
 
  1. Please advise us the quoted item including associated hardware. If yes, then give us the list of associated hardware.
92PCS 279A1706P001,  BUCKET SEAL PIN
92PCS 279A1705P003   BUCKET SEAL PIN
92PCS 239B57, 91P006   TWIST LOCK
  1. Please advise us the weight 350kg you have given for one set or two set. If possible advise us the approx. volume so that we will calculate the freight charg, e. ,
 EACH SET weight is about 350kg, each set volume or dimension is  140CMx120CMx60CM
  1. The validity of price you have given 30 days, I request you please extend it for 60 days because our client usually take 30-45 days to decide order and last date for the submission of quotation is 20/3/10.
Ok, we can offer you 60 days of validity from the date of quotation.
  1. Please advise us the quoted item will fit to all gas Turbine Frame 6 machine because our client asked the same in the enquiry.
Yes, IT FITS TO ALL F6 GAS TURBINE
  1. Please advise us the approx. delivery time so that the same we will mention in our quotation to client along with subject to prior sale.
GE STANDARD LEAD DELIVERY TIME IS 3 MONTHS, BUT IT IS POSSIBLE TO CHECK THE STOCK IN WORLD STOCK HOUSES FOR SHORTNED DELIVERY ONLY AFTER PURCHASE ORDER.
  1. Will it possible to you to give us good discount on quoted price so that I will make our offer more competitive to grab this order.
THE FINAL DISCOUNT CAN ONLYU BE APPLIED WITH GE ONLY AFTER YOUR SERIOUS INTENTION BY LETTER, BUT DISCOUNT IS NOT TOO MUCH.
  1. Please advise us have you received same enquiry from other company in Oman.
YES, AT LEASET I KNEW THIS IS A PUBLIC ENQUIRY BROADCASTED.
 

  Fexible Coupling Bearing of Gas Turbine

- GE GAS TURBINE SPARE PARTS FRAME 6 AMERICAN AIR FILTER (AAF) 04 DX 12/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 Joint Garlock Klosure 298A548P029 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 THERMOCOUPLE EXHAUST, P/n. 328A8483P001 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 314B7164G023 REPLACE 314B7164G014 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 HPRB Card Model: DS3800HPRB 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 GENERAL ELECTRIC/DIELEKTROL/LENTRONICS 354A1709P102 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 SEAL MECHANICAL WATER PUMP, P/n. 114A9710P019-82 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 Card DS200 TCPS G1A 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 IS2020RKPSG3A 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 GENERAL ELECTRIC: 109E3763G029-P 11/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 EAST AURORA N.Y 14052 - 0018 USA 312A6077P005 MODEL G771 K203 10/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 ELECTRIC RATING 28 V/DC GE 62105-3 10/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 COUPLING FLEXIBLE 307A9597P001 9/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 GENERAL ELECTRIC/DIELEKTROL/LENTRONICS 255A4309P001 9/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 DRWG. NO: 10R-098-537 8/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 304A8471 8/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 215A4504P001 8/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 Shaft the turbine-supercharger 235A5191P001 8/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 Exhaust Thermocouple 351A3488P005 8/3 2010
- GE GAS TURBINE SPARE PARTS FRAME 6 GASKET 211A8235G001 8/3 2010

Total 13 pages 247 items, Now at 1 page. First. Last. Next End


Copyright©2006-2010 Leda Greenpoweer Beijing
   Fax:0086-10-84568952  E-mail:
ycl1227@163.com