Contact Information
For your attention:
If you are interested in our serivces of power EPC contracting or equipments in the power industry from China, you are highly appreciated to provide your detailed technical documents and background information for the projects or equipments, which will save your valable time and also ours too.
At least you are suggested to fill in the questionnaire for power plants and for other equipments or projects, you can provide us data to the sample. Thanks a lot.
Sample Questionnaire for thermal power plant project, please complete for saving your time.
QUESTIONNAIRE FOR GAS / HFO / LIQUID FUEL BASED POWER PLANT
INFORMATION REQUIRED FOR SELECTION / SIZING / DESIGN OF POWER PLANT
A SITE CONDITIONS
1) Altitude (m above Sea Level)
2) Maximum Ambient Temp. (° C)
3) Relative Humidity at Maximum Ambient (%)
4) Wet Bulb Temperature of the Area (° C)
5) Environment (Dusty / Clean)
6) Presence of any Hazardous or ChemicallyActive Gases In Surrounding Air
7) Soil Condition at site (normal, marshy, black cotton etc.)
8) Soil bearing capacity (< 15 tons/m2 or > 15 tons/m2)
9) Water table at site
B POWER REQUIREMENT (As discussed personally present conditions given )
1) Maximum Demand (kVA)
2) Minimum continuous process loads (kVA / kW)
3) Grid Voltage and Frequency
Variation Percentage
4) Whether Independent Auxiliary Power Supply (415 V) available
5) Proposed Power Plant capacity (MW)
C STEAM REQUIREMENT (IF ANY)
1) For process Steam (Quantity T/hr, pressure)
2) For air-conditioning / chillers etc (quantity T/hr., pressure)
3) For fuel heating only
4) Existing Boiler(s) details
D FUEL
1) Type of fuel to be used HPS / LSHS / FO / LDO / HSD / NG / BIOGAS
(Please provide specifications of fuel, in case of Gas Annexure IV shall be filled also)
2) Approximate price of fuel at site
3) Design Viscosity of Fuel handling System (180 or 380 cSt at 50° C)
4) Fuel Handling and Storage Facility at site (If any for existing Generating Sets)
INFORMATION REQUIRED TO DETERMINE OPERATING PHILOSOPHY
A POWER PLANT OPERATION (Continuous / Base Load / Standby / Emergency / Peaking)
B PARALLEL OPERATION
1) With grid ( Yes / No )
2) Between proposed DG Sets (Yes / No )
3) With existing DG / TG Sets (Yes / No)
Details of existing DG /TG sets (if parallel operations req.)
i) Supplier / Model / Name plate details
ii) Rating (kVA / kW)
iii) Make / Model / Type of Governor
iv) Type of Excitation / AVR
v) Synchronization Facility
C SPECIAL REQUIREMENTS
1) Motor Starting Duty (If any)
(If yes, please provide details wherever possible)
2) Furnace application
(If yes, please provide details wherever possible)
3) Non-linear Thyristor Loads, if any
4) Any other non-standard loads, if any
5) Voltage requirement (3.3 / 6.6 / 11 kV)
6) Water Availability (Sufficient- Cooling Towers, Scarce - Radiators)
INFORMATION ABOUT THE CLIENT (PURCHASER / OWNER COMPANY)
1) Annual Turnover of the Company
2) Main Product and installed capacity
3) Location of the Site
4) Availability for proposed Power plant at site
5) Contact Person at Site
6) Whether power requirement is for existing plant /expansion project / new project
7) Duty structure (EPCG / EOU / Project Import / IPP)
8) Project Implementation Schedule
(Power Out - month / year)
9) Mode of Financing the Project
10) Type of Offer Required (Feasibility Study / Indicative / Budget / Firm)
11) Cost of existing Power
(a) From Grid including Max.Demand Charges
(b) Generated from other source (DG / TG etc.)
Additional Information
1. what is the current project stage? Conception, feasibility study, financing, land acquirement, PPA, EPC contractin?
2. is the fund for the project ready? If yes, where from?
3. what is the process for awarding EPC contractor? Negotiation or public tendering?
4. why need Chinese equipments and EPC services?
5. what is your role for this project? Developer/owner/sponsor/investor/EPC contractor/agent/consultant?
If you have any suggestion, enquiries and help for or from us, please contact me:
Yang Chun Lin
China National Electric Wire&Cable Imp./Exp. Corp. Beijing, China We are EPC contractor and supplier of global power generation, transmission and distribution
Tel/Fax: 0086-10-84568952 Mobile: 0086-13801218512
Email: ycl1227@163.com or Ycl661227@yahoo.com
Liu Bo
Email: ccclb@sina.com
El Salvador Agent
Ing. Luis Albans Molina
Santa Tecla, El Salvador, Phone/Telono: 503 22784842,
Celular: 503 77325918, Fax/1 303 479 6738,
email: ing_albanes@yahoo.com.mx
Web: www.geocities.com/ing_albanes/ Global Trade Leads - Import & Export on our award-winning International Trade Site - Trade portal and business resource guide. Providing free international trade information as well as a huge database with buyers and sellers!
|