Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Spare Parts  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Siemens Gas Turbine Generator  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
     MTU Cummins Perkins Volvo Diesel Generator  
       List of MTU Cummins PERKINS diesel generator  
       Leroysomer Siemens, Marathon Generator  
       MTU-Cummins-Perkins-diesel-generator-spare-parts  
       Germany-Deutz-diesel-generator-and-spare-parts  
     Power Plant Generator  
       Air Cooled Power Generator  
       low speed 125rpm/150rpm generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China track Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
       China-heavy-industry  
     Cable&Wire  
     Electric Motor  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
       IADC-CLASSIFICATION-OF-KINGDREAM-BITS  
       ROCK-BIT-COMPARISON-CHART  
     Drilling-Rig-for-Oil-Gas-Mining  
       Main-products-Directory-introduction  

Diesel Generator Proposal

Power Plant Proposal

Home > Equipments > Gas turbine & spare parts > 2MW Gas Turbine Generator


 
 
PROPOSAL ON 2MW GAS TURBINE CO-GENERATION POWER STATION From China

CONTENTS

 
BRIEF INTRODUCTION
PRINCIPLES OF 2MW GAS TURBINE CO-GENERATION STATION OPERATION
PERFORMANCE PARAMETER
REQUIREMENT FOR QUALITY OF FUEL AND WATER
CONTROL FOR ENVIRONMENTAL PROTECTION
CONTENT OF SUPPLY
TECHNICAL SERVICE
Gas Turbine Generator Track Records

CHAPTER I: BRIEF INTRODUCTION

2MW type gas turbine, one of the series, is the item which is recommended by the state for its energy-saving environmental protection and advanced technology. It can improve the utility of the surplus coke oven gas, oil field gas and exhaust gas of oil refinery, especially suiting for coking industry, petroleum chemistry, oil field and so on.
Through over twenty years��?development, gas turbine sets have operated approaching five hundred thousand hours by now. The power station in shanxi coking factory was awarded the prize the best commercial efficiency.
The comprehensive heat efficiency of gas turbine set is 30 percent higher than that of steam turbine set and the pay back period is 50 percent shorter. The facts have shown that the 2MW gas turbine is a mature, stable, reliable, energy-saving product with evident social and economic beneficial results.
 
CHAPTER 2: PRINCIPLES OF 2MW GAS TURBINE CO-GENERATION POWER STATION OPERATION
 
The gas turbine is started by a starting motor. When it reaches the ignition speed, the compressed air is mixed with the fuel gas for combustion within the combustor. The combustion gas with high temperature and high pressure from the gas generator will drive the power turbine to work. When the running speed of the set reaches 42 percent of its rated speed, the starting motor will be automatically disengaged from the set. When the set runs automatically to its balance speed, the electric generator which is driven by power turbine will rotate at the same speed and operate in parallel with network. Fuel supply and output power increase in accordance with a certain law, the rated load of the set is 2000KW. Exhaust flow of gas turbine is 16.6Kg/s with 400 C Degree 0.8-1.2Mpa vapor with the flow of 6.5t/h is produced by the heat recovery boiler, the boiler exhaust temperature is 190 C Degree Heat-electricity co-generation is realized by the packaged set with its comprehensive heat efficiency reaching 70 percent or higher.

CHAPTER 3: PERFORMANCE PARAMETER

Gas Turbine engine (under ISO)
Type
 
Gas turbine rotating speed (rpm)
 
Output shaft speed (rpm)
 
Rotating direction of output shaft
 
 (rear view)
 
Air flow (Kg/s)
 
Rated output power
 
Maximum output power
 
Heat consumption (MJ/kwh)
 
Overall dimension (mm)
 
Mass (kg)
 
Fuels:
Coke-oven gas, light diesel, oil field gas, natural gas and so on .
�� Heat Recovery Boiler (supplying with vapour-gas)
When gas turbine is under the rated working condition
Vapour volume (t/h)
6.5
Vapour pressure (Mpa)
0.8-1.2
Vapour temperature (C Degree)
169.6
 
�� Generator
Rated output voltage (Kv)
6.3 or 10.5
Power factor (lag)
0.8
Frequency (Hz)
50
Output power (Kw)
2000
Rated powe r(Kw)
2500
 
�� Flexible coupling
Nominal torque (N.m)
4000
Max permitted speed (rpm)
2000
 
CHAPTER 4: REQUIREMENT FOR QUALITY OF FUEL AND WATER
 
�� Requirement for fuel (for example coke-oven gas )
When calorific value is 17.9MJ/Nm3 (not less than 15.9MJ/Nm3 )
Flow(Nm3 /h )
2000
Temperature(��?)
25
Pressure (MPa)
0.9
H2S(mg/ Nm3)
Not exceed 20
Naphthalene (mg/ Nm3)
Not exceed 100
HCN (mg/ Nm3)
Not exceed 150
Tar (mg/Nm3)
Not exceed 6
 
Requirement for the quantity and quality of water
 Cooling water capacity (t/h)
28
oxygen removed water (t/h)
8
Cooling water of boiler (t/h)
1
 
 
 Cooling water is used by circulation, water exhausted amount is 2t/h in practice.
 In order to prolong the life of the boiler, the requirement for water quality shall meet the international standard.
 
CHAPTER 5: CONTROL FOR ENVIRONMENTAL PROTECTION
Noise control
Noise of inlet and exhaust air is disposed by filter silencer in gas turbine unit, Noise meet the international specification.
Vibration control
Isolation measure is adopted in gas turbine unit and compressor to control the vibration.
Discharge control
Fuel is burnt thoroughly , not causing draining pollution; exhaust temperature of boiler is 190��? not causing heat pollution.

 

CHAPTER 6: CONTENT OF SUPPLY

The set of 2MW gas turbine co-generation power station chiefly consists of the following parts.
�� Gas Turbine section
WJ6G1 light gas turbine engine
Inlet filter of gas turbine.
Inlet spray shell of gas turbine.
Joint-support for both gas turbine and generator.
Exhaust unit of gas turbine.
External lube oil system of gas turbine.
Fuel (liquid or gas fuel ) supply and adjustment system of gas turbine.
Main and auxiliary support of gas turbine.
�� Generator section
Three-phase AC synchro-generator
Ventilation (cooling ) unit of generator
Bearing lube and jack-up unit of generator
Starting system for turbine-generator
Excitation unit.
�� Recovery boiler
Recovery heat exchanger
Vapor and water separator
Heat-water circulating system
Boiler water supply and regulation system
Vapor pipe assembly
Smoke exhaust unit of recovery boiler
�� Switch Unit
High voltage switch cabinet (four to five )
400/230v station distribution cabinet
�� Control System
�� DC control cabinet
�� AC control cabinet
�� Protection system
�� Main control desk
�� Control Desk of Recovery Boiler
�� Connecting Wires and cables use in the Station.
�� Primary Instrument Installing Board.
�� Terminal Box
�� Special Tools
�� Floor Bolt of installation equipment
 
CHAPTER 7: TECHNICAL SERVICE
�� The supplier will supply the Instructional Manual for the Power station and maintenance manuals for various equipments.
�� If required by the purchaser, the supplier can offer the service of operation of the equipment of the power station.
�� The customer may get help in training the personals in proper operation and maintenance procedures.
�� To provide spares for the usage of one or two years.
�� The warranty period for the equipment of power station is one year from delivery.
�� The supply of spare parts is guaranteed.
 
Gas Turbine Generator Track Records
Item Clients (Chinese Clients) Nos. of Gas turbine Sets Nos. of Gas Turbine Fuel Output Completion year
1 山东胜南电厂 4 9 NG, AG Standard 1988
2 山东胜利油田注水泵站 1 1 NG, AG Standard 1989
3 铁岭焦化 1 1 Coke oven gas Standard 1991/4
4 陕西焦化 1 2 Coke oven gas Standard 1994/4
5 湛江东兴炼油 6 8 Diesel Peak load 1993/1
6 南方公司姜园电站 3 9 Coal oil, diesel Standard 1976
7 拉萨火电 2 2 Diesel Peak load 1985/7
8 甘肃长庆油田 4 6 diesel Peak load 1985/6
9 河南中原油田 6 10 NG Standard 1981
10 河北华北油田 2 3 Diesel Peak load 1980/7
11 克拉玛依油田 3 6 diesel Peak load 1983/1
12 河南南阳油田 2 2 Diesel  Peak load 1978/9
13 广州石化总厂 2 3 Flu from refinery Standard 1995/7
14 湖南鲤鱼江煤 1 2 Coke oven gas Standard 1996/2
15 山西晋城矿务局/FONT> 2 4 Coal bed gas Standard 2000/10
16 陕西韩城 1 1 Coke oven gas Standard 2001/0
17 陕西榆林子州电站 2 2 NG Standard 2002/8
18 河北峰峰矿务局/FONT> 3 3 Coke oven gas Combined 2002/7
19 河北石家庄焦化厂 3 3 Coke oven gas Standard 2003/1
20 河北峰峰矿务局/FONT> 1 1 Coal gas from mine Standard 2003/8
21 甘肃靖远矿务局/FONT> 2 2 Coal gas from mine Standard 2004/6
22 山东省节能工程有限公 5 5 Coke oven gas Combined 2004/11
23 山东省海化集团薛城振兴焦化有限公?/FONT> 5 5 Coke oven gas Combined 2004/12
24 山西曙光煤焦集团有限公司 6 6 Coke oven gas Standard Under construction
25 七台河龙洋焦电有限公?/FONT> 11 11 Coke oven gas Combined Under construction
26 黑龙江七台河煤气公司 1 1 Coke oven gas Standard Under construction
27 山西孝义金达煤焦化集 2 2 Coke oven gas Containerized 200505
28 河南平顶山鸿跃煤化公?/FONT> 2 2 Coke oven gas Standard Under construction
 /TD> Total 84 112  /TD>  /TD>  /TD>

- quotation on 2mw single cycle QD20 gas turbine generator set 10/1 2012
- GE Gas Turbine spare parts Frame 6 BLOCK SPACER-TP FWD SUPT 159D6801P001 159D6801P001 14/1 2010
- 6 Units of 2mw QDR20 Gas Turbine power Plant Quotation 29/9 2009
- quotation on 1x2mw co generation gas turbine generator power plant 21/1 2009
- Scope of supply of 2x2mw gas turbine generator 3/9 2008
- 2x2mw gas turbine co generation plant quotation 3/9 2008