China National Electric Wire&Cable Imp./Exp. Corp  BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Diesel generator   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine & spare parts > 2MW Gas Turbine Generator - 6 Units of 2mw QDR20 Gas Turbine power Plant Quotation


 

6 Units of 2mw QDR20 Gas Turbine power Plant Quotation

 

QDR20 Gas Turbine Plant Quotation

quotation code: 66151020090929 

      Equipment names

A. The quotation is FOB, with validity of 3 months from Sept. 28th, 2009

B. The quotation includes in above list, not including civil work, installation and commissioning.

C. if you are to construct combined cycle gas turbine power plant, you need heat recovery boiler, soft water supply system, steam turbine generator set:

1. heat recovery boiler: 1,656,000USD/ 6 units,

2. Ssoft water system: 126500USD/set

3. 6000kw/h steam turbine generator set: 1495000USD/set

D. Each unit of QDR20 gas turbine generator set (with gas supply of 9000Kcal/Nm3,  which are calculated as average value to your supplied gas analysis report and data.):

   a. Every Nm3 natural gas can generate 2.4kwh power;

   b. Every kwh of power will consume 0.417Nm3 natural gas;

   c. 6 units of QDR20 rated power is 12MW/h;

   d. 6 units of QDR20power plant will consume natural gas: 5004 Nm3/h�?/SPAN>

E. cost and fee of supervision on installation and commissioning: need 6 Chinese, each with 300USD per day. And traffic, boarding and lodging, immigration, pocket allowance is in the account of the buyers. Usually when site condition and tools are ready, single cycle installation will last 60 days to 70 days. Combined cycle in 90-100 days.

F. Delivery: FOB China port: for single cycle 10 months, for combined cycle 12 months after payment arrangement agreed and executed.

G. Payment: 30% to be paid by buyer to seller as advance payment, balance by irrevocable L/C at sight, issued by acceptable bank, within 15 days after advance payment.

 

 

1.                   rated power: 2000 kW

2.                   Max. capacity: 2330 kW

3.                   Steam: 6.5 t/h (0.8-1.3Mpa,160-300 Celsius degree)

4.                   Heat value: 15.65 MJ/kWh

5.                   Rate voltage: 6.3 or10.0 kV

6.                   Rated Frequency:  50 Hz

7.                   combined efficiency: no less than 70%

8.                   Cooling water consumption: no higher than 2 t/h

9.                   soft water for boiler: about 7 t/h

 

�?

�?Fuel supply, governing, pressure booster

synchronization generator 

Exciter�?

Heat recovery boiler �?

Low voltage control panels�?

steam turbine generator set�?

�? and auxiliaries 42T/

Heat recovery boilerunit�? 78T/unit

cooling water system unit

Copyright©2006 China National Electric Wire & Cable Import & Export Corporation
Tel:0086-10-85805511   Fax:0086-10-84568952  E-mail:
[email protected]