A. The quotation is FOB, with validity of 3 months from Sept. 28th, 2009
B. The quotation includes in above list, not including civil work, installation and commissioning.
C. if you are to construct combined cycle gas turbine power plant, you need heat recovery boiler, soft water supply system, steam turbine generator set:
1. heat recovery boiler: 1,656,000USD/ 6 units,
2. Ssoft water system: 126500USD/set
3. 6000kw/h steam turbine generator set: 1495000USD/set
D. Each unit of QDR20 gas turbine generator set (with gas supply of 9000Kcal/Nm3, which are calculated as average value to your supplied gas analysis report and data.):
a. Every Nm3 natural gas can generate 2.4kwh power;
b. Every kwh of power will consume 0.417Nm3 natural gas;
c. 6 units of QDR20 rated power is 12MW/h;
d. 6 units of QDR20power plant will consume natural gas: 5004 Nm3/h�?/SPAN>
E. cost and fee of supervision on installation and commissioning: need 6 Chinese, each with 300USD per day. And traffic, boarding and lodging, immigration, pocket allowance is in the account of the buyers. Usually when site condition and tools are ready, single cycle installation will last 60 days to 70 days. Combined cycle in 90-100 days.
F. Delivery: FOB China port: for single cycle 10 months, for combined cycle 12 months after payment arrangement agreed and executed.
G. Payment: 30% to be paid by buyer to seller as advance payment, balance by irrevocable L/C at sight, issued by acceptable bank, within 15 days after advance payment.
1. rated power: 2000 kW
2. Max. capacity: 2330 kW
3. Steam: 6.5 t/h (0.8-1.3Mpa,160-300 Celsius degree)
4. Heat value: 15.65 MJ/kWh
5. Rate voltage: 6.3 or10.0 kV
6. Rated Frequency: 50 Hz
7. combined efficiency: no less than 70%
8. Cooling water consumption: no higher than 2 t/h
9. soft water for boiler: about 7 t/h
�?
�?Fuel supply, governing, pressure booster
synchronization generator