BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      Quotationon Used PG6551B gas turbine plant   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Diesel generator   
      8x8735kw MAN 18V32/40 HFO Diesel power Proposal   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      10x5.5MW MAN 12V32/40 HFO diesel plant proposal   
      3mw-9mw MAN 18V32/40 HFO Diesel generator   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Steam Turbine > Quotation-50MW-condensing-steam-turbine


 
 

Quotation for 50MW condensing Steam Turbine Generator Sets

1.     Technical data and supply scope

1.1  Main technical parameters of the steam turbine:

 

Installation

Indoor

Model of Steam turbine

 

Quantity

1 set

Rated Power

 

Rated Revolution

3000rpm

Rated Inlet Pres.

10 MPa

Rated Inlet Tempt.

535Degree C

Layout manner

Double arrangement

1.2  Main technical parameters of the generator:

 

Rated power

 

Rated speed

3000 rpm

Frequency

50Hz

Excitation style

Brushless

Cooling type

CACW

Rated voltage

11KV

Power factor

0.8

Insulation class

F

1.3      Scope of supply of steam turbine:

 

One set of components for a steam turbine unit, including:

l         Emergency stop valve along with integral filter;

l         Steam turbine proper, front and rear pedestal supports, cover, coupling;

l         Water strainer;

l         AC & DC Gear oil pump, electrical motor driven pump, jacking oil pump;

l         Oil strainer, oil tank, oil cooler;

l         Gland Sealing Condenser (GSC);

l         flash tank;

l         surge tank;

l         All steam, drain water and oil pipelines within the supply scope;

l         Woodward 505  Digital electric-hydraulic governor (no panel);

l         Bently for generator

l         Condenser(cooled by water)

l         One set of valves for all the pipelines within the supply scope;

l         One set of local instruments within the turbine supply scope;

l         motors for the above pumps,

l         Spare parts;

l         Special tools;

l         Four sets of technical drawings and documents .

 

1.4  General explanation of the constructions:

Our turbine unit is of impulse type. The casing is of horizontal split type, the steam chest is an integral part of the inlet casing, and steam enters the steam chest from both sides of the steam chests. The rotor is forged type, and the LP stage is built up; The bearings of the turbine are composed of two oval rear bearing and a front bearing, which are comprised of one tilting pads thrust bearing at the front and one oval journal bearings for support of the rotor of the turbine.

1.5  Scope of supply of generator

l         Generator Assembly

l         Excitation system and control device (AVR)

l         Air cooler

l         Special tools

l         Spare parts

l         Drawings and documentation

 

1.6  Adopted standard and code:

 

l         IEC-45       For steam turbine;

l         IEC-34       For turbo-generator

 

2. EXCLUSIONS

The following are not considered in scope of the supply by SUPPLIER:

 

l         All civil foundations (Load data to be provided by supplier)

l         Building, structure and other civil work.

l         EOT cranes & Hoist

l         Designing of piping lay-out & its civil foundation.

l         Main steam piping from boiler to flange of ESV.

l         CEP pumps,

l         Deaerator.

l         LP heater;

l         HP heaters;

l         Water piping, steam piping and their valves and elbows except the ones in the scope stipulated in the items 1.3 and 1.5.

l         Turbine heat insulation (Technical documentation to be provided by supplier only for reference)

l         Generator protection system & panels, CT, PT & distribution transformers. Neutral grounding systems, Circuit Breakers, Bus bar & coupler, MCC surge protection panel.

l         Power Distribution System, Illumination & Telecommunication.

l         Re-circulation Pump House, DM water plant

l         Microprocessor / PLC based control system for the CPP.

Instrumental and thermal control system for the turbine and generator and other equipment of power plant.

l         Fire Fighting and Protection System.

l         Air conditioning and Ventilation System

l         Cooling Tower and Pumps

l         LT, HT cables, control cables and cable accessories.

l         Consumable, Chemicals & First fill of Lub. Oil

l         Lub. oil centrifuge

l         DC power & battery & charger

l         Erection & commissioning

 

3. TERMINAL POINTS ( BATTERY LIMITS )

3.1  Mechanical

 

l         Main Steam: At the inlet of the emergency stop valve of the turbine with counter flanges.

l         Bleed steam: At the flange of bleed outlet of turbine with counter flanges

l         Extraction steam: At the flange of extraction outlet

 

3.2  Electrical

 

l         HT Power: At the out let of the Generator.

l         AC: At the junction box of motors.

l         UPS Power: To be provided by customer at one point inside the TG house.

 

3.3  Instrumentation

 

Instruments: Complete field instruments as detailed in the supply scope.

 

4. Price

Price for one set of the above shall be FOB China Port USD3,400,000.00

 

4.1ï¼?/SPAN>Payment

--10% of the total contract price shall be paid as down payment by the customer by means of telegraphic transfer, within 10 days after signing the contract against 10% Bank Guarantee.

--30% of the total contract price shall be paid by the customer by means of telegraphic transfer, within 15 days after receiving the basic designing drawings.

--The payment of the rest 60% of total contract price shall be made by an acceptable irrevocable confirmed and unconditional Letter of Credit at sight in favor of the Seller within 200 days after signed the contract.

5. Delivery time

The delivery time will be 13 months after received the down payment.

6. After-sale service

For this project, we shall send about three technical specialists to the working site for supervision of erection and commissioning of the unit, one or two for steam turbine, and one for generator. The buyer should bear the expense of the above said experts�international traffic fee, room and board, communication and medical insurance. Moreover, the buyer also needs to pay USD200.00/person.day to these experts as allowance.

7. Validity

2 months (60 days)

8. Packing

All contract goods are packed in solid sea-worthy wood cases.