Brief introduction
HQ Industrial development Corporation locates in Chinese Power City , HEB is the subsidiaries of Electric corporation.(HE), is the economic entity that has independent corporation position. The registered capital is 119 millions RMB. Persisting to the principle "Work on main business more careful, while develop in all areas", based on the improved technology and perfect process in the designing and manufacturing of steam turbine possessed by former Turbine Work, the company re-designs the flow passage of 300MW,150MW,50MW, 25MW, 12MW and 6MW steam turbine with the most advanced full-3D technology in world and reach advanced level in China. While work on main business, follows on fire-new management theory and the spirit of the unremitting innovation, the company creates new economic increasing points, enlarge the business field and form a multiple economy pattern that include the design and manufacture for mid & small turbines and the mechanical products used in grain and oil processing industry, the development of estate and the management of logistics. The decision-makers with the principle of seeking to perfect and the overstepped opinions and the managers with the scientific and effective workings style and the innovatory and pragmatic spirit form the good configuration of company. The company has a lot of technicians and engineers, among 3642 staffs there are 894 technicians and engineers and account for 24.55% of total staffs, while 171 engineers with senior title and 474 engineer with middle title. Among 24 attached divisions and subsidiaries, Turbine Manufacture Division, Turbine Accessories Industrial Co, Toupin Group Co., Estate Development Co., Logistics Management Co., school, hospital and Mingzhu Hotel all have stranger strength and affect force. Modern machining equipments, scientific production and management, ISO 9001 quality management system, significant advantages in the designing of turbine and excellent after-sale service form the stable operation basic for Haqi Industrial Development Co. The company sets up 11 offices in Shenzhen , Hunan , Shandong and other areas, the products spread over more than 20 provinces and cities. The company participates in extensive technical cooperation and technology exchange with many foreign corporations in USA , Japan , South Korea , Italy , Russian, Ukraine , Bengal and so on. Insisting on the enterprise spirit of "Act in society with moral; Strive to become stranger by learning; Be proficient in work by diligent effort; Make a development by innovating"and the developing theory of "all give way to developing", the company continuously makes the technical innovation, and develop and produce a series of new products following on the clear and economical design principle and the united and effective working style, major includes: WY series complete sealing duplex oil baffle ring, ML series comb gland, new-type auto level controller, new-type drain flash tank, multi-way water jet air ejector, tilting-pad bearing, centrifugal oil purifier, precision grinding machine, gear lapping machine and so on. HQ Industrial Development Corporation would like to cooperate with all friends in all walks of society and get benefit mutually and develop together.
HQ Industrial Development Corporation
Turbine Performance
No |
Description |
Capacity |
Type |
Years of putting into operation |
Note |
13 |
Shandong Huaxiao Resources Co. Ltd. |
13.2MW |
N13.2-23.5/1.27 |
2005 |
Double pressure condensing |
14 |
Sinopec Baling Petrochemical Co. Ltd. |
12MW |
C12-3.43/0.98 |
2005 |
Single extraction condensing |
15 |
Power Plant of Jilin Petrochemical |
15MW |
CB15-8.83/3.5/0.98 |
2005 |
Extraction & back pressure |
16 |
Zhejiang Duzhou Donggang Environmental Thermal Power Co. Ltd |
6MW |
B6-4.9/0.98 |
2005 |
Back pressure |
17 |
Dalian Beiliang Co. Ltd |
15MW |
B15-4.9/1.27 |
2005 |
Back pressure |
18 |
Power Plant in Shandong Laiwu |
4X135MW |
N135-13.24/535/535 |
2005 |
Reconstruction |
19 |
Benxi Iron & Steel (Group) Co. Ltd. |
25MW |
C25-3.04/0.98 |
2005 |
Single extraction condensing |
20 |
Dalian Beiliang Co. Ltd |
15MW |
C15-4.9/1.27 |
2005 |
Single extraction condensing |
21 |
Weifang Shandong Huawei Electric Power Co. Ltd. |
25MW |
C25-8.83/0.98 |
2006 |
Single extraction condensing |
22 |
Kashi Xinjiang Huadian Power Co. Ltd. |
2×50MW |
C50-8.83/0.3 |
2006 |
Single extraction condensing |
23 |
Datong Coal Mine Group Co. Ltd. Datang Thermal Power Plant |
4×50MW |
CK50-8.83/0.3 |
2006 |
Air-cooled extraction |
24 |
Huomei Hongjun Aluminum & Electric Co. Ltd. InnerMongolia |
2×100MW
Remould |
WGZ410/9.9-13 |
2006 |
Condensing to single extraction |
No |
Description |
Capacity |
Type |
Years of putting into operation |
Note |
25 |
Henna Jiaozuo Handian Power Co. Ltd. |
2×50MW |
CC50-8.83/4.22/1.57 |
2006 |
Double extraction condensing |
26 |
Tianjin Chentangzhang Power Plant |
30MW |
C30-0.98/0.29 |
2006 |
Bass turbine |
27 |
Datong 2# Power Plant |
6×200MW |
N200-12.7/535/535 |
2007 |
Heat remould |
28 |
Weifang Shandong Huawei Electric Power Co. Ltd. |
25MW |
C25-8.83/0.981 |
2007 |
Single extraction condensing |
29 |
Shandong Xiwang Group Self-supply Power Plant |
25MW |
B25-8.83/0.98 |
2007 |
Back pressure |
30 |
Anhui Jinyuan Electric Power Co.Ltd. |
25MW |
B25-8.83/1.27 |
2007 |
Back pressure |
31 |
Jinlin Oilfield Power Plant |
50MW |
B50-8.83/0.98 |
2007 |
Back pressure |
32 |
Comprehensive Utilization Power Plant in Yongxi County in Hunan |
60MW |
N60-8.83/535 |
2007 |
condensing |
33 |
Indonesia Xibayak Power Plant |
2×5.8MW |
N5.8-0.66 |
2007 |
Geothermal power plant |
34 |
State Power Jinlin Longhua Power Plant |
2×200MW |
N200-130/535/535 |
2008 |
reconstruction |
35 |
Liuzhou Iron & Steel Co. Power Plant |
4.8MW |
N4.8-0.8 |
2008 |
Condensing |
36 |
Anshan Iron & Steel Group Chaoyang Anling Iron & Steel Co. Ltd. |
2×25MW |
C25-4.9/0.981 |
2008 |
Single extraction condensing |
|
|
|
|
|
|
|
No |
Description |
Capacity |
Type |
Years of putting into operation |
Note |
37 |
Hegang Mining Group Co. Ltd. |
2×50MW |
CB50-8.83/0.294/0.049 |
2009 |
Extraction & back pressure condensing |
38 |
India Vedanta Aluminum Plant |
50MW |
C50-8.83/0.981 |
2009 |
Single extraction condensing |
39 |
India Vedanta Aluminum Plant |
2×30MW |
C35-8.83/0.981 |
2009 |
Single extraction condensing |
40 |
Mutanjiang Electric Power Co. Ltd. |
80MW |
B80-8.83/0.194 |
2009 |
Back pressure |
41 |
Henan Mengdian Group Thermal Power Plant |
2X300MW |
C250/N300-16.7/537 |
2009 |
Extraction condensing |
42 |
Sinopec Sichuan Vinylon Works |
50MW |
CB50-8.83/4.02/0.75 |
2010 |
Extraction & back pressure |
43 |
Sinopec Sichuan Vinylon Works |
25MW |
B25-8.83/4.02 |
2010 |
Back Pressure |
44 |
State Grid Shentou 2# Power Plant |
500MW |
500MWremoule |
On processing |
Remould |
|