Quotation on Used Combined cycle PG6551B Gas turbine plant
The used combined cycle PG6551B gas turbine power plant of capacity of 37+14.5mw is on the process of sale out to the world market at the preliminary quotation of:
FOB China port: 10 million USD, including:
Used Equipments for the complete power plant as where they are now without warranty:
Dismantling, packing and inland transporting to China ports. It usually takes about 100 days.
China port and custom clearance.
After we have entered the contract for the used equipments, we can negotiate the following.
By additional contracts:
1. We can also provide engineering of the plant to be installed with the used plant, supervision on installation and commissioning.
Single cycle plant: 1,200,000 USD (excluding materials, heavy machines, lodging, boarding, international traffic, immigration costs), around 3-4 months when the local site condition is ready.
Combined Cycle (steam turbine and generator, boiler):800,000 USD (excluding materials, heavy machines, lodging, boarding, international traffic, immigration costs), around 6 months.
The above is just estimation, for actual contract we charge to persons and days stay at site for supervision, usually need 10-15 technicians/engineers from China. Each person charges 300 USD.
3. Maintenance and operation for the whole plant to make sure the plant is into normal operation, usually needs one years guidance with 10 persons from China.
If you are interested in the used plant of gas turbine, please send us your documents on your projects to show us that your project is ready and financing is ready. And then we will send you detailed specification with picture of the plant.
|