BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      Quotationon Used PG6551B gas turbine plant   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    HFO Diesel generator & Marine HFO Engine   
      8x8735kw MAN 18V32/40 HFO Diesel power Proposal   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      10x5.5MW MAN 12V32/40 HFO diesel plant proposal   
      3mw-9mw MAN 18V32/40 HFO Diesel generator   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    MTU Cummins Perkins Volvo Diesel Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine & spare parts > GE Licensed MS9001E Series Gas Turbine plant


 

Here you can get step by step guidance on applying China Eximbank financing on your power projects. 

GE Licensed MS9001E Series Gas Turbine

Generating Set of 125MW

It is a kind of packaged unit with a common base and four major compartments: control, accessory, gas turbine and generator. It can be arranged outdoor or indoor. The gas turbine control panel, generator control panel and protection panel, motor control center are arranged in the control compartment. Cabinets of generator neutral point and outgoing-line are set at both sides of generator. The unit has an enclosure with necessary ventilation, lighting and fire-fighting systems, Air conditioning is set for control compartment.

MS9001Egas Turbine

    MS9001E gas turbine consists mainly of air inlet system, compressor, combustor, turbine, exhaust system, accessory system and control system, etc. Air enters compressor through the inlet air filters and silencers. The compressed air then, gets into combustors and mixed with fuel, which is ejected by fuel nozzles in the combustors. The fuel and compressed air are burned to produce high-pressure and high-temperature gas, and then the gas expands in turbine to generate power. After expansion, it exhausts to atmosphere through exhaust system (or to HRSG)

Gas-Steam Combined Cycle

    Gas turbine can be operated both in simple cycle and in combined cycle. In the first, the expanded gas with higher temperature is exhausted to atmosphere directly, while in combined cycle, the exhausted gas will get into HRSG (Heat Recovery Steam Generator) to produce steam, then enters a steam turbine for generating power and/or cogeneration. Arrangements for combined cycle are S109E and S209E. S109E consists of one M9001E gas turbine, one HRSG and one steam turbine. S209E consists of two MS9001E, tow HRSG and one steam turbine.

    Gas-steam combined cycle has many advantages, mainly as follows:

1) It is clean power plant without ash and little pollution. Good environment can be got.

2) High thermal efficiency. The efficiency of S109E plant can be 50% above.

3) Less installation area

4) Less tap water. Usually, water flow is one of third for steam turbine power plant with same output.

5) Operation is flexible. Start or shutdown is fast. It can be used for base or peak load.

6) Short construction period and quick repayment

7) High automation and less staff

8) Fuel variability such as natural gas, distillate oil and heavy oil, HFO

9) Economic investment.

    In order to meet the different customers?requirements on steam turbine generating sets in combined cycle plant, we have developed 60MW and 135MW steam turbine generators which 60MW steam turbine generator is used for S109E gas-steam combined cycle. These units could satisfy different customers with different requirements on combined cycle power plant or cogeneration power plant.

   It is a pedestal 3-phase synchronous generator. The insulation for both stator and rotor is F class. Exciter is brushless exciting and is equipped with a high accuracy AVR (Automatic Voltage Regulator).So that the power factor and voltage can be controlled, adjusted and protected.

 

 Parameter:

Gas Turbine Performance

    Main performance parameters under ISO condition(inlet temperature of compressor.15?/SPAN>;Relative humidity: 60%; Atmospheric pressure:1.013bar), inlet air pressure loss;88.9mmH2O and exhaust air pressure loss:127mmH2O:

Model

PG9171E

Structure Type

Standard

Standard

Standard

DLN+Extraction Heating

Fuel

Natural Gas

Distillate Oil

Heavy Oil

Natural Gas

Output

126100 kW

123300 kW

115300 kW

125400 kW

Heat Rat(LHV)

10650 kJ/kWh

10730 kJ/kWh

10960 kJ/kWh

10700 kJ/kWh

Heat Cons(LHV)

1343×106 kJ/h

1328×106 kJ/h

1263.7×106 kJ/h

1340.8×106 kJ/h

Exhaust Temp

543?/SPAN>

543?/SPAN>

520?/SPAN>

543?/SPAN>

Exhaust Flow

1505×103kg/h

1509×103kg/h

1508.6×103kg/h

1504×103kg/h

Shaft Speed

3000r/min

3000r/min

3000r/min

3000r/min

 

Main Performance Parameters of Gas Turbine Generator

额定输出

135MW

Rated Output

135MW

额定转

3000r/min

Rated Speed

3000r/min

频率

50Hz

Frequency

50Hz

功率因素

0.85

Power Factor

0.85

满载效率

98.2%

Eff. at Full Load

98.2%

转向(从原动机端看)

逆时?SPAN lang=EN-US>

Direction of Rotation

(Viewed from turbine end)

Anti-clockwise

短路?SPAN lang=EN-US>

0.51

Short Circuit Ratio

0.51

接线

Y

Connection

Y

保护?SPAN lang=EN-US>

封闭?SPAN lang=EN-US>

Protection

CACW

 

We are EPC contractor and supplier for power plant, and also provide services from design to commissioning, spare parts supplying,  operation and maintenance.


- Specifications for GE Frame PG9171E Gas Turbine Generator 10/10 2009
- Specifications for GE Frame PG9171E Gas Turbine Generator 10/10 2009

Total 1 pages 2 items, Now at 1 page. First. Last. Next End


Copyright©2006-2010 Leda Greenpoweer Beijing BJ ICP Reg: 10010978
   Fax:0086-10-84568952  E-mail:
ycl1227@163.com