For all main gas turbine gensets to be delivered outside China through Chinese EPC
1. The projects location can only be non Americas, No European nations;
2. The project location can not be nations or regions blacklisted by America government;
3. The financing for the project should be from China (to GE agreement: 75% of financing for the main gas turbine gensets should be from China ).
As to each specific project, Chinese EPC should provide documents proof that financing for the GE gas turbine should be from China such as bank financing Letter of Intent, and then GE JV will confirm the supply, and also quotation and design, and supporting letter to specific projects.
As you have mentioned that you will be investor of the 2x42mw gas turbine power project in xxx, I suggest you use your own fund to the bank and let them issue our EPC or bank bank guarantee, and arrange 30% of the advance payment, then I will talk with our EPC contractor for the EPC or supplying of gas turbine and auxiliaries.