| We can supply Gas Turbine Generator Unit and Gas Turbine Compressor Unit as EPC project, here is the introduction as below: 1. Company Profile HABGH Gas Turbine Co. is a wholly-owned subsidiary of China Shipbuilding Industry Corporation (CSIC), located in. With the  strong support of Research Institute in technology and human resource, HGGT is specialized  in  R&D,  design,  manufacture, system integration, installation and commissioning, maintenance and technical service of gas turbine generator unit and gas turbine compressor unit.    BUSINESS SCOPE u R&D, manufacture and supply of Gas Turbine and its components;  u Design, manufacture, supply, installation, commissioning, system integration, maintenance and relevant services of Gas Turbine Units and auxiliary systems;  u Importation and exportation of commodity and technology.    
2. Products        â‘ Gas Turbine Generator Package As a general packager, HGGT Gas Turbine supplies Gas Turbine Generator Package, and is responsible for its quality and performance guarantee. Based on the Gas Turbine provided by partner- company, we provide GTG package with auxiliary systems, such as air inlet system, exhaust system, enclosure, electrical system & MCC, fuel forward system, fuel system, fire fighting system, lubricating oil system, etc. GT25000 Manufactured under 703RI’s license  ZORYA SATURN HITACHI 
  
 Engine Core - Zorya-Mashproekt - 6MW~25MW GTG Units -  In cooperation with Zorya-Mashproekt Ukraine for near 20 year. (DV71)                          (DN70)                    (DB90)                         (DG80) 
u  High reliability u  High performance u Highest Economy of operation Engine Core - HITACHI - 15MW~34MW GTG Units -  In cooperation with HITACHI since 2009.                                                                 Hitachi H-25 Gas Turbines u Long life u Heavy duty
 u High Fuel Flexibility with Low Emission Level Engine Core - NPO Saturn  2.5MW~110MW GTG Units -  In cooperation with NPO Saturn. GTD-6/8RM - 6/8MW                     GTD-110 - 110MW u Wide range of output capacity u  Wide range of after sale support and services u  High Reliability and safety in operation Engine Core - GT 25000 manufactured under 703RI’s license Specifications ISO Base Rating: 26.2MW Efficiency: 36.3% Exhaust Temp: 471°C Turbine Speed: 3600r/minor 3000r/min (ISO Base fuel —Oil or Gas)     2. Gas Turbine Compressor Package As a general packager, HG Gas Turbine supplies Gas Turbine Compressor Package, and is responsible for its quality and performance guarantee. Based on the Gas Turbine provided by partner-company, we provide GTC package with auxiliary systems, such as air inlet system, exhaust system, enclosure, electrical system & MCC, fuel forward system, fuel system, fire fighting system, lubricating oil system, etc. 
    Engine Core - Zorya-Mashproekt   UGT 10000,  UGT 15000,  UGT 25000  Engine Core - NPO Saturn   GTD-6.3RM,-6.3RM/8   GTD-10RM   Engine Core - GT 25000 manufactured under 703RI’s license Specifications ISO Base Rating: 26.7MW Efficiency: 36.5% Exhaust Temp: 480°C Turbine Speed: 5000r/minor 3270r/min (ISO Base fuel —Gas)   3. Main reference for last 3 years 
| Application | Package | Customer | Location | Quantity | Time |  
| Marine | GT25000 Marine propulsion equipment | N/A | China | >20 | 2009~Up to now |  
| GTG & EPC Project | UGT6000 GTG | CNOOC | Hainan Dongfang | 1 | 2009 |  
| UGT6000 GTG | CNOOC | Guangxi Weizhou | 2 | 2010 |  
| UGT15000 GTG (Singleand dual fuel) | CNPC(Iran) | North Azadegan Iran | 4 | 2012 |  
| GTC | 30MW-classGTC | CNPC | West-East Gas Pipeline | 4 | 2010~Up to now |  
3.1  6Mw Single Cycle Power Plant for Hainan Dongfang terminal of CNOOC - put into operation from May 2009, average operating hours each year exceed 8,000 hours. 3.2  EPC project of Weizhou terminal power plant of CNOOC       The Guangxi Weizhou terminal power plant project belongs to Weizhou South-west oil fields power network. The power plant adopts isolated operation of 2×6MW simple cycle Gas Turbine Generator units. 3.3 IRAN NORTH AZADEGAN PROJECT (4 ×UGT15000) Started on Sept 29 2012. 3.4 30MW-class GT-driven compressor package for Natural Gas Pipeline 4 set of 25Mw GTC Packages have been contracted with CNPC   West-East Gas Pipeline in China   4. Technical and Post-sale services Remote Monitoring and Diagnostic The Remote monitoring and diagnostic system of our company is based on the classification techniques of remote data transmission technology, gas turbine data recognition and expert remote support and service system. The system is the first real sense of the gas turbine remote diagnostics and support systems of China. At present, the system is providing remote monitoring and diagnostic service for gas turbine plant on offshore platform. 
On-site services  - Installation and commissioning  - Specialist support stands by during operation  - Technical support of life cycle  - Response in 24h Spare parts  - Supply of spare parts for commissioning, maintenance and overhaul   - Fast procurement and supply of temporary spare parts   - Extra key parts store Maintenance  - Economic maintenance by our engineers  - Strict inspection before overhaul   Training  - Portfolio of technical training courses at customer’s site or in 703RI Training center.  5. Power Plant Design & EPC Projects Owning an efficient management and technical team with solidarity, cooperation, and innovation capacity and rich experience in the fields of power plant design, equipment supply, construction and technical services, we provide integrated solution from project demonstration, technical design, equipments procurement to construction, installation, commissioning, maintenance and technical training.   GTCC Power Plant in Meishi Suzhou Gaoda GT power plant Phase I Nanshan GT Combined Cycle power plant Changzhou Saide GT power plant Phase I CNOOC Dongfang terminal GT power plant CNOOC Weizhou terminal GT power plant   Q & A:   
Thanks for your inquire.   1.       For H-25 (34MW) gas turbine, it has similar configuration of GE 6B. our Chinese OEM, as a GTG package integrator,  can supply complete H-25 GTG package to customer, with Hitachi being a Core engine sub-vendor. Please note that H-25 GTG can not be sell to any countries under sanction, such as Iran. For spare parts, please send us GE p/n or H-25 p/n to us.   2.       Regarding NPO Saturn, it is a gas turbine manufacturer in Russia, not Solar’s Saturn 60. NPO Saturn is one of our long-term cooperators in GTG and GTC project. NPO Saturn will supply Core engine to OEM , and our OEM can supply whole GTG package to customer.   3.       GT25000 gas turbine is developed by Zorya-Mashproekt in Ukraine. It has no relationship with GE 5P. 
 
 
 |