Quotation on 2x2000kw QDR20 Co-Generation Gas Turbine Genset power plant
1. Advantage
The cogeneration power plant, generating both electricity and steam, is based on principles of high efficiency, clean, and comprehensive usage of energy fuel, which is friendly to environment, and saving water and land. It features:
a. higher efficiency, generating both electric icy and steam;
b. mitigated impact on environment; co generation power plant impacts the minimum negative impact on environment among all kinds of power plant;
c. Cost effective;
d. Good leak load ability;
e. Water and land saving;
f. Shorter construction periods
g. Higher automation;
h. Operation and maintenance const is very lower, overhaul cost is about one third of others
i. Higher availability thanks to its simple construction
2. Specification and quotation
|
Name |
Unit Price in USD |
Quantity |
Total in USD |
1.00 |
Gas turbine genset |
551,515.15 |
2.00 |
1,103,030.30 |
2.00 |
Fuel automatic adjusting system |
29,545.45 |
2.00 |
59,090.91 |
3.00 |
Gas turbine lube system |
19,696.97 |
2.00 |
39,393.94 |
4.00 |
Generator Lube System |
13,787.88 |
2.00 |
27,575.76 |
5.00 |
Cooling System |
15,757.58 |
2.00 |
31,515.15 |
6.00 |
Inlet air system and silencer |
130,000.00 |
2.00 |
260,000.00 |
7.00 |
Exhaust coupling system |
5,909.09 |
2.00 |
11,818.18 |
8.00 |
Fire protection (excluding extinguisher) |
11,818.18 |
2.00 |
23,636.36 |
9.00 |
Genset automatic control system |
163,484.85 |
2.00 |
326,969.70 |
10.00 |
Metering, alarming system |
29,545.45 |
2.00 |
59,090.91 |
11.00 |
MCC |
5,515.15 |
2.00 |
11,030.30 |
12.00 |
DC Panel |
19,696.97 |
1.00 |
19,696.97 |
13.00 |
Gas turbine container |
175,303.03 |
2.00 |
350,606.06 |
14.00 |
Heat recovery boiler (12.6t/h) |
202,878.79 |
2.00 |
405,757.58 |
15.00 |
Design |
92,575.76 |
1.00 |
92,575.76 |
16.00 |
Training |
43,333.33 |
1.00 |
43,333.33 |
/DIV> |
Total |
/DIV> |
/DIV> |
2,865,121.21 |
3. Remark:
●the gas turbine is retired from military fighter and overhauled to good condition;
●it is QD20containerized type of gas turbine generator, but control container is not included in the quotation.
●Validity is 3 months from Aug. 20th, 2008.
4. Transportation
Each 2mw gas turbine genset is a standard container for sea shipping, other auxiliaries need about one 40 feet container. Total weight is about 80 ton.
5. Delivery, installation, commissioning, warranty
Deliver: 10-11 month after contract effectiveness
Installation: two-three month after equipments on site.
Commissioning: 10-20days when other preparation jobs are ready.
Warranty: one year after delivery (gas turbine is 8000 hours.)
6. Supervision on installation and commissioning
We provide technical engineers for supervision on installation and commissioning at price of 200 USD per day per capita.
7. Spare parts
We can supply total spare parts for the whole plant, but we suggest these scope of spare parts will be defined after final proposal is fixed. (to our experience, one unit of gas turbine genset’s annual spare part cost is about 190000-200000 Chinese Yuan.)
8. Documents
WJ6G1gas turbine generator set operation and maintenance manual;
QD20power plant operation manual
Quality certificates and drawings;
Other installation, commissioning documents, testing documents.
9. Quotation code: 663020080820
|