To my current information, Siemens controls it spare parts channels very strictly, I have to use my high level connection to find a solution to get the quotation.
For Siemens V class and SGT series gas turbine units, I am sure we can get the best quotation and services.
For your Gas turbine installation and commissioning Technical Assistance or Guidance, we suggest to dispatch 4 person for each unit, of course we can arrange to work simultaneously on more than one units if local conditions permits.
Sheet1:Technical Service fee Unit: USD |
|
No. |
Item |
Number Technicians |
Hour Rate |
Hours of Week |
Number of Work Weeks |
Total |
Remark |
|
|
1 |
Mechanical TA |
1 |
180.00 |
40 |
10 |
72,000.00 |
|
|
2 |
Electrical TA |
1 |
180.00 |
40 |
10 |
72,000.00 |
|
|
3 |
Control Engineers |
1 |
180.00 |
40 |
10 |
72,000.00 |
|
|
4 |
Interpreter/Assistant |
1 |
100.00 |
40 |
10 |
40,000.00 |
|
|
|
Total |
|
|
|
|
256,000.00 |
|
|
|
|
|
|
|
|
|
|
|
Note:
1. Daily work hours shall no more than 8 hours, per week working hours shall no more than 40 hours. |
|
2. Over time of unit price is calculated according to 1.5 times of the normal working hours. |
|
3. The number of people of this sheet is arranged by a single unit, not considering simultaneous working situation; |
|
4. Estimated the working days are temperately 70 day for each unit of GE 6B GT according to the China’s domestic experience; |
|
And the international and domestic travel, immigration costs, meals and hotels, safety measure costs not quoted, and can be responsible by Employer or Contractor to both sides further negotiation.
Equipment, Spare Parts, consumables Special Tools to be provided by Employer.