Used Combined GE Licensed Gas Turbine Power Plant for Sale
/P>
We now have another two used gas turbine power plants for sale, one is PG6531B Combined Gas Turbine Generator Set, and another is PG6581B Combined Gas Turbine Generator Set.
The technical data for G6531B Combined Gas Turbine Generator Set is attached hereinafter, and for PG6581B Combined Gas Turbine Generator Set, please refer to another attachment named: PG6581B Gas Turbine Genset.
Indicative Quotation for Used Combined Cycle Gas Turbine power plant |
Item |
Gas Turbine |
PG6531B Combined Gas Turbine Generator Set |
PG6581B Combined Gas Turbine Generator Set |
1 |
Brief Intro. |
The genset was jontly produced in China under GE license, Rated output at 36500kw (at 15 C degree), now reaching at about 33000kw, first operation date at 1992 |
The genset was jontly produced in China under GE license in 2004, Rated output at 38000kw (at 15 C degree), now reaching at about 38000kw too. |
/TD>
| Steam turbine generator set was manufactured and put into operation by famous Chinese producer with rated power of 15000KW in 2000 |
Steam turbine generator setwas manufactured by famous Chinese producer with rated power of 18000KW and put into operation in 2005 |
/TD>
| Rated combined output is 51500KW, (now the output reaching at 48000KW) |
Rated combined output is 56000KW, (now the output reaching at 56000KW too) |
/TD>
| The gas turbine generator set has in operation for about 39000 hours, (Steam turbine generator set has run for much less hours due to late installation) |
The combined cycle power plant run less than 2500 hours |
/TD>
| The gas turbine generator set was designed and produced to GE standard under GE license, and it can use both disillate oil and heavy oil as fuel, currently using HFO |
The gas turbine generator set was designed and produced to GE standard under GE license, and it can use both disillate oil and heavy oil as fuel, currently using HFO |
2 |
Indicative Quotation in USD (to be settled after further negotiation) |
/TD>
| /TD> |
1.Equipment |
/TD>
| /TD> |
2.Dismantle&pack |
/TD>
| /TD> |
3.Shipment to offshore |
/TD>
| /TD> |
4.Design |
/TD>
| /TD> |
5.Insallation |
/TD>
| /TD> |
6.Comissioning |
/TD>
| /TD> |
7.Electric Panels and Installation |
/TD>
| /TD> |
8.Training&Documenst |
/TD>
| /TD> |
11.Others |
/TD>
| /TD> |
Total |
14,313,000 |
21,463,000 |
9.Inland shipment |
to be calculated |
to be calculated |
10.Civil&construction |
to be calculated |
to be calculated |
|
/TD>
| /TD> |
3 |
/TD>
| /TD>
| /TD> |
|
/TD>
| /TD>
| /TD> |
Remarks |
1.Due to lack of detailed design information, so the quotation and technical specification is only for reference only, and to be clarified and negotiated. Quotation is only indicative. |
2.The quotation does not include power grid outside the power plant and fuel supply or storage equipments. |
|