BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Gas Turbine Generator Compressor Unit Power Plant  
       Siemens Gas Turbine Generator  
       ABB-Siemens-ALSTOM-Gas-Turbine-Spare-Parts  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
       HFO-diesel-generator-sets-running-on-biodiesel  
     MTU Cummins Perkins Volvo Diesel Generator  
       List of MTU Cummins PERKINS diesel generator  
       Leroysomer Siemens, Marathon Generator  
       MTU-Cummins-Perkins-diesel-generator-spare-parts  
       Germany-Deutz-diesel-generator-and-spare-parts  
     Spare Parts for Steam Turbine Power Plants  
     Power Plant Generator  
       Air Cooled Power Generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China track Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
       China-heavy-industry  
       China-outstanding-buses-and-coaches  
     Cable&Wire  
     New Building Cargo Ships vessel Finance from China  
     Dual Fuel Engine Generator  
     Electric Motor  
     China Famous Equipments for Power Plant  
     MTU Deutz MWM Diesel gas engine for marine land  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
       IADC-CLASSIFICATION-OF-KINGDREAM-BITS  
       ROCK-BIT-COMPARISON-CHART  
     Drilling-Rig-for-Oil-Gas-Mining  
       Main-products-Directory-introduction  
     Best-Diamond-Brand-Cemented-Carbide  
     China-famous-steel-producers   
     China Largest Steam Turbine Producer  
       Harbin-Electric-Group-Spare-Parts  
     China-Best-Largest-Steam-Turbine-producers  
     Ingersoll Rand Air Compressor  
     Leading-farm-machinery-and-engineering-mechanical  
     Sawblade  
     Pump and pump parts  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Equipments - Hydraulic Edible Oil Press Machine


Google

Hydraulic Edible Oil Press Machine

Hydraulic oil press machine

(English version)

 

Production introduction:

  1. pressing range is big:

    (hot pressing and cold pressing two ways).

Hot pressed oil: sesame, flax, peanuts, wheat germ, corn germ, etc.

Cold pressed oil: walnut kernel, pine nut, almond, oil sunflower, olive, macadamia nut, camellia seed, etc.

Condiments and medicine: Chinese prickly ash, mustard seed, basil and etc.

2.Oil quality is good:

Pure physical pressing, high oil yield, cold pressing process does not produce temperature, do not destroy the organic components of oil, good oil quality, less impurities, high cake value, a wide range of applications.

3.Simple to operate and high productivity:

Mechatronics design, low failure rate, high degree of automation, from the loading to cake 8-10 minutes to complete, beautiful appearance, easy to operate, one person can operate 3-4 sets.

 

 

 

Main technical parameters

Model

6YZ-150

6YZ-180

6YZ-230

6YZ-260

6YZ-320

 

Size�?/span>mm�?/span>

400*500*850

500*650*1050

600*850*1360

650*900*1450

800*1100*1550

Weight�?/span>kg�?/span>

260

750

1050

1400

2000

Max pressure�?/span>Mpa�?/span>

55

55

55

55

50

Band heater Power�?/span>kw�?/span>

2

2

2

2

2

Band heater control temperature(℃�?/span>

       70-100

70-100

70-100

70-100

70-100

Material barrel volume(kg)

2

4

8

11

15

Oil cake diameter�?/span>mm�?/span>

150

180

230

260

320

Motor power

YZ90L-4

0.75KW

YZ90L-4     1.5KW

YZ90L-4     1.5KW

YZ90L-4     1.5KW

YZ90L-4     2.2KW

 

Name of main parts

  1. 上螺母加固圈 Upper nut reinforcement ring

  2. 螺母 Nut

  3. 上顶�?/span> top roof plate

  4. 调整丝圈 adjusting coil

  5. 加强�?/span>A  Reinforcement ring A

  6. 加强�?/span>B  Reinforcement ring B

  7. 料筒 barrel

     

  8. 油缸 oil cylinder

  9. 手柄 handle

  10. 配电�?/span> Distributor

  11. 压力�?/span> pressure gauge

  12. 接油�?/span> Oil tray

  13. 接油�?/span> Oil nozzle

  14. 立柱 upright column

  15. 底座 pedestal

    ①温控器 Thermostat

    ②加热指示灯 Heating indicator lamp

    ③加热开�?/span>  Heating switch

    ④电压力�?/span>  Electric pressure meter

    ⑤开关指示灯 Switch indicator lamp

    ⑥电源指示灯 Power indicator lamp

    ⑦保�?/span>  Insurance

    ⑧电机开�?/span> Motor switch

     

     

     

     

     

     

    Installation

    1.Put the meter box on the tray of the meter box, open the back cover of the meter box, and fix the meter box on the tray.

    2.The machine is placed on the horizontal working surface, and the sealing ring is placed at the connecting pipe, and the oil pipe joint is tightened.

     

    3.Inside the meter box, fifth, sixth grid wires are connected to the main heating ring, and the insulating porcelain cap is screwed.

    4.Connect the thermocouple to the back of the main engine.

    5.Single phase connection method:

     the incoming line is connected to the meter box, left first grids, and the incoming line is connected to the fourth grid. In the meter box, the left seventh and tenth grid wires are connected to the second and third rows of the motor of the pumping station. Pictured here. Install the rear cover.

    Triple-phase connection method:

    connect the wire to the first, second and third grid of the meter box from the left, and the zero line to the fourth grid. The seventh, eighth and ninth grid wires in the meter box are connected to the motor of the pump station, first, second and third rows.

    When the motor reverses, it will replace any two FireWire positions.

     

    Tighten the two nuts under the base, adjust the upper nut to 5-8 mm away from the top, lock the nut and fill the pump station with hydraulic oil.

    Machine operation

    1.Turn on the power supply, check the normal operation of the indicator, the first use of the machine, pump station lever placed in a horizontal position, continuous switch machine 10 times, empty the pump station gas, shut down. Turn on the thermostat switch.

    2.Put the joystick in a vertical position, open the top, start, observe the cylinder piston up to the pressure plate can be taken out, immediately close the switch, note: do not raise the piston too high. Remove the pressure plate, do not move other parts in the barrel.

    3.Open the top, put a cotton pad, put the fried oil into the barrel after exhausting smoke, put another cotton pad, put into the pressure plate, close the top, put the joystick in a vertical position, start the switch, start pressing. Normally, the pressure gauge of the ammeter box automatically stops at 55 (50) MPa, the pressure drops to 40 MPa, and the machine works automatically. Repeat 2-3 times, the oil is basically squeezed out, and the switch is closed. Put the joystick in the horizontal position for about 20 seconds and then put it back in the vertical position. Open the upper cover, open the main switch, take out the oil cake, put the joystick in the horizontal position, and after the piston falls to the bottom, start the next pressing.

     

     

    Special tips:

     a hose can be used to connect the main engine back oil return pipe and pump station, in order to prevent piston lifting too high, hydraulic oil flow out.

    Safety technology and maintenance

  16. The machine adopts 220 volt power supply, heating and control system uses 220 volt power supply, according to customer requirements, can also be changed to 380 volt power supply.

  17. In order to ensure the safety of electrical system, earthing protection measures must be adopted.

    3.the hydraulic system belongs to the super high pressure level with a pressure of 55 MPa. It is strictly forbidden to use overpressure. It is forbidden to arbitrarily disorderly and dismantle.

    4.When the pressure gauge is not working properly or damaged inaccurately, it is forbidden to start production, and the new pressure gauge should be replaced before starting.

    5.the machine prohibits overhauling electrical appliances during high voltage and pressure keeping.

    6.During operation, please strictly follow the rules of operation.

    7.After frying the oil, we must exhaust the smoke and squeeze it again. Otherwise, gas explosion will occur when the oil is squeezed, and people will be hurt if it is serious.

    8.After the oil is dried, the cake should be served immediately, otherwise the gas explosion will occur if the time is too long.

    9.If the oil tank is blocked, use a thin blade or a sewing needle to clean it.

    10.The new machine must be used for a month, the hydraulic oil must be filtered clean, and clean the tank, after the annual replacement of hydraulic oil. For a longer time, please turn off the main power supply.

     

    Causes and troubleshooting of failures

Pressure   problems of pressure gauge

1.The ball can   not be recovered in the intake valve of the suction pump.

1.Clean up   impurities in pump and replace clean hydraulic oil.

Hydraulic   cylinder not working

2.Disassemble   the manual valve on the pump station and wash the manual valve.

3.Damage of   hydraulic cylinder oil seal

3.Replace new   oil seals

oil pipe joint   leakage

Not strictly   sealed

4.Change the seal   to Xinmi and tighten the bolts.

5.Serious   piston wear

5.Replace new   piston

6.The pressure   gauge is damaged and the needle does not rise.

6.Replace new   pressure gauge

 

 





Statement: Any reference to the OEM, part number or other OEM, information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]