BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Gas Turbine Generator Compressor Unit Power Plant  
       Siemens Gas Turbine Generator  
       ABB-Siemens-ALSTOM-Gas-Turbine-Spare-Parts  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
       HFO-diesel-generator-sets-running-on-biodiesel  
     MTU Cummins Perkins Volvo Diesel Generator  
       List of MTU Cummins PERKINS diesel generator  
       Leroysomer Siemens, Marathon Generator  
       MTU-Cummins-Perkins-diesel-generator-spare-parts  
       Germany-Deutz-diesel-generator-and-spare-parts  
     Spare Parts for Steam Turbine Power Plants  
     Power Plant Generator  
       Air Cooled Power Generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China track Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
       China-heavy-industry  
       China-outstanding-buses-and-coaches  
     Cable&Wire  
     New Building Cargo Ships vessel Finance from China  
     Dual Fuel Engine Generator  
     Electric Motor  
     China Famous Equipments for Power Plant  
     MTU Deutz MWM Diesel gas engine for marine land  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
       IADC-CLASSIFICATION-OF-KINGDREAM-BITS  
       ROCK-BIT-COMPARISON-CHART  
     Drilling-Rig-for-Oil-Gas-Mining  
       Main-products-Directory-introduction  
     Best-Diamond-Brand-Cemented-Carbide  
     China-famous-steel-producers   
     China Largest Steam Turbine Producer  
       Harbin-Electric-Group-Spare-Parts  
     China-Best-Largest-Steam-Turbine-producers  
     Ingersoll Rand Air Compressor  
     Leading-farm-machinery-and-engineering-mechanical  
     Sawblade  
     Pump and pump parts  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Equipments > MTU Cummins Perkins Volvo Diesel Generator - Semi-automatic/Full-automatic Parallel Operation for MTU, Cumins, Perkins, Doosan Diesel generator


Google

Semi-automatic/Full-automatic Parallel Operation for MTU, Cumins, Perkins, Doosan Diesel generator

ZGPT Semi-automatic/Full-automatic Parallel Operation for MTU, Cumins, Perkins, Doosan Diesel generator
I. Parallel theory
The set in parallel means that several generator sets are in operation, the power provided by each generator set is connected to a single power to load. Every set should meet the four conditions as same phase-sequence, same voltage, same frequency as well as same phase-position, when can parallel to the whole system safely.
The important problem is to share loads appropriately when the multi gensets (different brands and types) are in parallel operation. The load is composed by active power (kW) and reactive power (KVA). The active power is provided by diesel speed regulating system, and reactive power provided by generator AVR.
II. The concept of parallel cabinet
The optimum operating state is between 70% and 85% of load. If generator sets continue to operate beyond this load range for a long time, it will not only cause waste of energy, but also increase the combustion waste, which needs to supply frequent maintenance.
When the load and load variation become bigger, several sets supply electricity separately, some load of sets is very small, while some load is very big. In order to start the electro-motor, we will increase the capacity and make set in the condition of light load. This has many faults of enormous waste energy, hard management, many times of maintenance and high frequency, making no full use of the existing resource.
The advantages of parallel system: enhance quality and capacity of electricity, enhance the reliability of system, and increase the capability of directly starting asynchronous motor. With flexible system operation, reasonable load share as well as simplified supplying system grounding, it will make sets operate in economic loading condition and reduce the expense of operation and maintenance.
 
ZGPT Semi-automatic Parallel Operation
 
1. Features
1.1 Optimizing selection for components, safe and reliable, easy maintenance.
1.2 Centralized parallel operation, easy and convenient operation.
1.3 Excellent performance and price.
2. Composition
2.1 Main switch
The domestic famous air circuit breaker or joint, import and user-defined air circuit breaker is adopted as the executive components of completing operation with functions of overload, over-current protection and pre-accumulator.
2.2 Measurement meter
Adopting 6L2 series meters as the display of the set operation status and parallel operation.
2.3 Synchronizer
Complete the manual and semi-automatic parallel function. Rotated speed or voltage regulation resistance shares the active power and reactive power of system in parallel operation.
2.4 Protection device
Protections of reverse power, overload and over-current.
2.5 Control system
Adopting relay and change-over switch as logic control components, easy maintenance.
3. Main technological parameters
3.1 Work conditions: Specification of diesel generator set.
3.2 Generator major loop
   Rated voltage�?00/230V
   Rated current�?.804×set power(kW�?/DIV>
Rated frequency�?0Hz
Power factor�?.8
3.3 About diesel generator set of same power, the division difference of active power and reactive power is not more than 10% in parallel operation. However, about diesel generator set of different power, the division difference of active power and reactive power for high-powered genset is not more than 10% in parallel operation, while the division difference for low-powered genset is not more than 20%. About semi-automatic parallel operation, the power ratio of single genset is not in excess of 3:1.
4. Functional description
The parallel control cabinet can be installed with parameter meter and synchronizer, as AC voltage, current, frequency and power. And the parallel cabinet can separately complete the operations of manual close, open, alarm reset and automatic synchronous close.
5. Parallel figure 
 
ZGPT Full-automatic Parallel Operation
When two or more gensets are in parallel, the set is initiated automatically (The set must be self-start set.), once the start control signal is received (This signal can be provided by manual or external controller.). After the start, the control system will complete parallel operation automatically. The load is shared automatically in parallel. The set can be increased or reduced automatically according to the load, in order to achieve non-impulse load transfer. When the stop signal is received, the system will be disconnected automatically as follows: firstly, reduce the load gradually, the set is in parallel operation as load is near zero; then the set is disconnected and withdrawn from operation. After then, the set is shutdown after the idle operation for minutes. The operation sequence is also designed by requirements.
1. Features
1.1 Optimizing selection for components, safe and reliable, easy maintenance.
1.2 Centralized parallel operation, easy and convenient operation.
1.3 Excellent performance and price.
2. Composition
2.1 Main switch
The domestic famous air circuit breaker or joint, import and user-defined air circuit breaker is adopted as the executive components of completing operation with functions of overload, over-current protection and pre-accumulator.
2.2 Measurement meter
Adopting 42L6 series meters as the display of the set operation status and parallel operation.
2.3 Synchronizer and load shares
The American GAC parallel control module is adopted, in order to finish the automatic and manual parallel function and automatic load shares proportionally.                                                                             
2.4 Protection device and alarm display
Protections of reverse power, overload and over-current.
2.5 Control system
Adopting relay and general change-over switch as operating control components, easy maintenance, and the PLC as logic control components.
3. Main technological parameters
3.1 Work conditions: Specification of diesel generator set.
3.2 Generator major loop
   Rated voltage�?00/230V  
   Rated current�?.804×power (kW�?/DIV>
Rated frequency: 50Hz
Power factor�?.8
3.3 About diesel generator set of same power, the division difference of active power and reactive power is not more than 10% in parallel operation. However, about diesel generator set of different power, the division difference of active power and reactive power for high-powered genset is not more than 10% in parallel operation, while the division difference for low-powered genset is not more than 20%.
 
4. Functional description
The parallel control cabinet can be installed with parameter meter and synchronizer, as AC voltage, current, frequency and power. And the parallel cabinet can separately complete the operations of manual close, open, alarm reset and automatic synchronous close.
4.1 Automatic parallel: The synchronous module, based on the frequency and phase position of electrical power of bus-bar, can regulate the speed automatically. When the set reaches the synchronism point, the module gives the close signal automatically, with the whole process not more than 5S.
4.2 Automatic load sharing: According to power ratio for average load sharing after parallel operation, apply the isochronous automatic load sharing module, with full electricity, highly reactive sensitivity and high-adjusting accuracy. Share the total load averagely in proportion to size according to different powers. The automatic load sharing deviation can be controlled within 10% from idle load to overload. The PLD close-loop mode can increase the oil capacity advanced before the change of speed as the great load fluctuation; while the traditional regulating system may increase the oil capacity after the decline of speed (frequency) to make excellent performance of electric network.
4.3 Peak adjustment: The system automatically controls the numbers of parallel sets according to the capacity of load, and makes the operation of set better economy. If customer needed, we can provide pre-start function. When the system has standby set and needs to start the high-capacity motor load, we can provide the signal to start and parallel the standby sets, reduce the impact to system as starting the motor. (The emergency supply-electricity generator set system doesn’t set up this function)
4.4 The soft over\unloading and zero-power open: The load transfer of sets is not transient transfer in the peak regulating function, because the transient transfer will cause voltage fluctuation to the whole parallel system and impact to set and load. Applying the soft over\unloading, the whole system has no impact in the transfer process with the load transfer according to certain slope. When needs to remove a set, it will make the soft load wholly transfer to other sets, then the set could separate brakes automatically. In the same way, a set after parallel operation is loaded in the given slope, making the distribution and 100% load of same powered sets.
4.5. Protection
When the engine or control system go wrong in operation (as obstruction of engine fuel ), it will cause the abnormal power, then other set will make them enter motor condition, which increase the load of system. At the time, the control system will break the set automatically and give the alarm.
When the load appears over-current protection, system will trip automatically; break the supplying power as well as automatic cooled shutdown at the same time. While removing the malfunction, system will provide electrical power with automatic operation without recovery of the city electricity. Please connect with us for special needs.
4.6. Fault display and inter-trip. If the set shutdown in operation because of the problem for high water temperature, the parallel switch will be inter-trip to prevent reverse power to drag other sets and prevent the high pulse from burning excitation system. The malfunction indicator will work during this protection.
4.7. ATS transfer function (optional): The system monitors mains supply automatically. When the mains supply fails, the start can be delayed and paralleled automatically. After parallel, ATS can provide load transfer signal automatically and the load is transferred to genset. While the mains supply is recovered, the auto delay timer will transfer load to mains supply. Then, the parallel set will be open automatically and be shutdown for cooling, ready for next start.
5. Transfer System Diagram
 
 
 
 
 
 
 
Parameters:
·three-phase wire voltage
·three-phase current
·frequency
·active power
·power factor
·active watt-hour meter
·reactive watt-hour meter
Protections:
·high generator voltage
·low generator voltage
·generator overload
·generator short circuit
·reverse power
·power leakage protection (optional)
Indications:
·generator fault
·high generator voltage
·low generator voltage
·reverse power
·emergency stop
·air switch close
·generator operation
The main components list about automatic parallel operation:
 
Components
Specification
Product base
main switch
By the set
Import\Joint
Automatic synchronizer
GAC SYC6714
Import
Automatic load share protector
GAC LSM672
Import
Three-phase indicator
200VAC
Optional
Three-phase current meter
By the set
Optional
Voltage meter
0-500V
Optional
Power meter
By the set
Optional
Frequency meter
45-55HZ220VAC
Optional
Power factor meter
N/A
Optional
Three-phase voltage option switch
N/A
Optional
Auto\Manual start switch
N/A
Optional
Indicator
24V DC
Optional
Alarm
24V DC
Optional
Emergency button
N/A
Optional
Synchronizer
N/A
Optional
Synchronizer switch
N/A
Optional
Relay
N/A
Optional
Transformer
N/A
Optional




Statement: Any reference to the OEM, part number or other OEM, information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]