Dear Sir
Here are some reply to your 30 mw hfo containerized power project with the following configuration:
20 units of MAN 9L21/31,with each unit capacity of 1881kW, then total rated power capacity is 37.62MW, net output can be about 36MW. As you are negotiating with government for the IPP license, once you win, please inform us for further quotation and proposal.
The main parameters are:
1. the HFO maximum guaranteed consumption rate �?g/Kwh,
Reply: The HFO maximum guaranteed consumption rate for the 36MW power plant is 227g/Kwh.
(Based on HFO Lower calorific value: 9620 Kcal/kg, Tolerance:+5%)
2. - the 0&M costs �? $ cents / Kwh,
Reply: The 0&M costs 2 $ cents / KWh (Only personnel services)
3. - the average availability,
Reply: More than 95%.
4. - and the delivery time ( you can consider three shipments of around 10 MW each)
Reply: Delivery time :12months
Yangchunlin |