Power Station Quotation
1. SCOPE OF SUPPLY
The diesel power plant of 10MW electrical outputs with FOUR (4) diesel generating sets will be supplied to the client. The diesel engine generators are capable of operating parallel with each other and/or Grid. The Diesel Generating set shall be designed to produce electric power by HIMSEN ENGINE Type 6H 32/40 manufactured by Hyundai. Generating sets voltage: 10.5kV, Frequency: 50Hz, PF: 0.8pf, Speed: 750rpm.
The main fuel is heavy fuel oil (HFO). Light fuel oil (LFO) is also used for stand-by fuel and start-up and shutdown.
DESIGN AMBIENT CONDITION
The equipment will be designed and constructed for operation at the following condition:
-Air temperature(Blower inlet): |
40 °C |
-Total barometric pressure |
1010 mbar |
-Cooling water temperature |
50 °C |
-Cooling system |
Radiator Cooling |
-Relative humidity |
Max. 80% |
- Gross Output AT Generator Terminal: |
2,509kW/Unit |
- Fuel consumption at Generator Terminal: |
199 g/kWh |
(Based on LCV= 42700 kJ/kg, Load 100%, 50 Hz, PF = 0.8 )
- The performance data value is valid only for equal or above 0.8 P.F. during the test.
2. PRICE
2.1 EPC PRICE
|
Name |
Description |
Unit |
Quantity |
1 |
6H32/40V
Generator set |
Engines, couplings, generators, common base, control system, spare parts |
set |
4 |
2 |
Power house and auxiliary |
Lubricant separation module, fuel supply module, leaking oil and decontamination module inlet filter silencer module, nozzle cooling modules, engine warm-up module |
set |
4 |
Pump Station |
Water maintenance module, heavy oil separation module, air bottles, air compressor |
Radiator, exhaust |
Radiator, exhaust silencer |
Distribution room |
Switchgear, feeder panel, neutral grounding resistor cabinet PT cabinets, DC screens, power distribution cabinets, station transformer |
Offloading unit |
Diesel oil, lubricating oil offloading unit |
Auxiliary |
Auxiliary rated power |
3 |
Waste heat boiler |
|
set |
4 |
4 |
Power plant overall design |
|
set |
1 |
5 |
The power station equipment installation, installation material and debugging and On-Shore Cost |
Piping system (tubing, pipes, trachea, smoke tubes, etc.), cables, wires, bridge, Building extension and foundation refurbishment, Start-up, site testing and commissioning, Site Training and so on |
set |
1 |
Total:
(EPC price) |
United States Dollars () |
2.2 Payment of the Maintenance Program
JiC has agreed that the 1 year maintenance service charge is: (the charge includes spare parts during the contract period, JIC's management charge, labor cost, overtime cost, emergency repair cost, transportation cost, and necessary testing equipment for maintenance personnel etc.).
Description |
Period(Month) |
Maintenance Cost(USD) |
4×6H32/40V |
12 |
$0.015/KWh |
3. Delivery time
Delivery time will be conditional to unsold production capacity. The equipment will be ready for shipment from our factory not later than 10 months after the date of signature of the JiC Supply Contract and receipt of advance payment as defined therein.
4. WARRANTY
The warranty period shall be the earlier of (i) twelve (12) months from the commissioning or (ii) eighteen (18) months from the date of shipment.
5. VALIDITY
This offer is valid for a period of 60 days from the date of this offer.
6. REMARKS
1) All taxes and duties to be imposed are not included in our price.
2) The other terms and conditions of the contract shall be subject to mutual agreement.
|