Dear Ladies and Gentlemen,
We are your reliable partner in the supply for
· Power Plants - new and used
· Refinery - new and used
The three basic stacks of our work
· Technical Consulting
· Project Management
· Work Organization (installation of plant equipment - turnkey ready)
OFFER:
A complete power plant with gas turbines: 235 MW, 50 Hz.
Built 4 years ago, but new, still in original packaging. The power plant had already been sold, but the purchase was aborted as the remaining financing didn't come through.
The price (186 Mio Euro) is approx. 20% below the original price, additional savings 2 - rather 3 years of engineering and construction time.
The price includes the ready-to-use construction of the power plant incl. sundries. (Turn-key)
Not included are transport, site preparation works, i.e. infrastructure, connections, foundation slab and structure.
Reservation is possible only by making a reservation payment. If interested, hard LOI, POF, and taking up negotiations in Switzerland.
Please decide quickly.
Leda Greenpower (Beijing) Trading & Engineering Co., Ltd.
Web: http://www.china-power-contractor.cn/
|