BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > China-the-most-famous-gas-engine-generator-sets > Biomass-Genset


Google

 
 

Biomass gensets


Ranging from 75kVA to over 625Kva Better use of biomass resources for renewable energy to the world. Biomass is a renewable energy resource derived from the carbonaceous waste of various human and natural activities, including wood chips, paper mill waste, wheat straw, saw dust, bark, forest residue chips and rice shell etc. It is derived from numerous sources, including the by-products from the timber industry, agricultural crops, raw materials from the forest and wood.
Biomass does not add carbon dioxide to the atmosphere as it absorbs the same amount of carbon in growing as it releases when consumed as a fuel. Its advantage is that it can be used to generate electricity with the same equipment. Traditional use of biomass is more than its use in modern application. In the developed world biomass is again becoming important for applications such as combined heat and power generation.

500GF1-PJG Biomass generator set

 

BIOMASS GAS GENSET SPECIFICATIONS

 

Description/ Genset Type

100GF-PJG

260GF-PJG

500GF1-PJG

Electrical Output (kw)

100

260

500

Voltage (V)

400

400

400

Engine Type

JG4190ZL-2

JG6190ZLDK-2

JG12V190ZLDK-2

Aspiration

Naturally Aspirated

Turbocharged Inter cooled

Turbocharged Inter cooled

Arrangement of cylinder

4-in line, 4-Stroke-Cycle

6-in line, 4-Stroke-Cycle

V-12, 4-Stroke-Cycle

Bore/Stroke (mm)

190/210

190/210

190/210

Engine Speed (rpm)

1000

1000

1000

Fuel consumption (MJ/kWh)

12.50

12.00

11.50

Exhaust temp. (oC)

580

580

550

Ignition mode

Spark-Ignited

Spark-Ignited

Spark-Ignited

Starting Mode

24V DC Power

24V DC Power

24V DC Power

Total Displacement (Lit)

23.82

35.72

71.45

Insulation

Class F

Class F

Class F

Excitement

Brushless excited

Brushless excited

Brushless excited

Length (mm)

4005

4650

5506

Width (mm)

1600

1970

1970

Height (mm)

1910

2675

2970

Weight Empty (kg)

6100

8000

12500

Better use of biomass resources for renewable energy to the world.

Biomass is a renewable energy resource derived from the carbonaceous waste of various human and natural activities, including wood chips, paper mill waste, wheat straw, saw dust, bark, forest residue chips and rice shell etc. It is derived from numerous sources, including the by-products from the timber industry, agricultural crops, raw material from the forest and wood.
Biomass does not add carbon dioxide to the atmosphere as it absorbs the same amount of carbon in growing as it releases when consumed as a fuel. Its advantage is that it can be used to generate electricity with the same equipment.
Traditional use of biomass is more than its use in modern application. In the developed world biomass is again becoming important for applications such as combined heat and power generation.

                                                                                                                                     Biomass gas should be purified before burning in engine
                                                                                                                                                                                  Biomass temperature  less than or equal 40oC                                                                                                                                                                                  

                                                                                                                                                                                  Biomass pressure 3-10kPa; Fluctuate rate of pressure  less than or equal 1kPa/min
                                                                                                                                                                                  Tar less than or equal 20mg/Nm3
                                                                                                                                                                                  H2S less than or equal 200mg/Nm3

                                                                                          ,     , ,                                                                                     NH3 less than or equal 20mg/Nm3
                                                                                                                                                                                  Granule less than or equal 5um

                                                                                                                                                                                  Granule less than or equal 30mg/Nm3
                                                  ,                                                                                                                               Moisture less than or equal 40g/Nm3 and heat value minimum 4MJ/Nm3

Cogeneration is an energy management solution for today.
Cogeneration, also known as Combined Heat and Power (CHP), is the on-site production of two kinds of energy usually electricity and heat �?from a single source of fuel. Cogeneration can replace the traditional method of supplying energy from multiple sources, e.g., purchasing electricity from the power grid and burning natural gas or oil separately in a furnace to produce heat or steam. These methods can waste up to two–thirds of the energy in the original fuel �?losses that are made up for in high utility rates.
A cogeneration system normally consists of a SD gas engine turning an alternator to produce electricity, and a waste heat recovery system to capture heat from the exhaust and cooling water jacket. Nearly 80% of the energy in the original fuel is put to productive use in a typical CHP system.
Electricity, steam, hot water

 

 

Technical specification of Biomass Generator Set
 
 
SD Biomass Generator Set
 
MODEL:500GF1-PWG
 
 

500Kw  Biomass Generator Set


 
1. 500Kw Biomass Generator Set

1.1 Model:500GF1-PWG  &  Picture of 500GF1-PWG gas generator set

 
           
 
 
 
 
control panel                         gas generator set                            Multi-fan Radiator

1.2 Technical parameter 500GF1-PWG

A. Technical specification of gas generator set
 

Mode
500GF1-PWG
Engine model
Generator model
1FC6 455-6LA42
Control panel model
PCK1-RB500/Option:PCK1-RZ500
Rated power(kW)
500
Rated current(A)
902
Rated voltage(V)
400
Rated power factor, COSΦ
0.8(lagging)
Frequency(Hz)
50
Starting method
24V DC motor starting
Voltage regulation
Automatic voltage regulation
Governing Method
Electronic Governing
Exciting method
Brushless
Phase and wiring
Three-phase, four-Wire system
Connecting Method between engine and generator
Flexible coupling
Cooling method of water cycle
Closed (with multi-fan radiator)
Dimensions (l×b×h),mm
5344×2170×2955
Weight kg
12350

 
B. echnical specification of gas engine
 

Engine model
G12V190ZLDK-2
Type
4 –stroke, Spark plug ignition, water-cooled ,
with turbocharger and inner-cooler
Cylinder arrangement
V-type, 60oangle
Cylinder bore                    mm
190
Stroke Piston                     mm
210
Total displacement          L
71.45
Rated power                 kW
500
Rated speed               r/min
1000
Idle speed      r/min
550
Specific Oil Consumption     g/kWh
less than or equal 1.5
Exhaust temp. oC
less than or equal 600
Water outlet temp.     oC
less than or equal 85
Oil temp. in oil pan   oC
less than or equal 90
Oil pressure in main oil gallery     kPa
400~800
Oil pressure in turbocharger    kPa
200~400
Stable speed droop (%)
less than or equal 5
Cooling method
Forced water cooling, heat exchanger  with cooling tower
Lubricating method
Pressure and splash lubrication
Cylinder number
Output end
1- 2- 3- 4- 5- 6
7- 8- 9-10-11-12
Ignition mode
SI
Ignition sequence
1-8-5-10-3-7-6-11-2-9-4-12
Starting method
24V DC motor starting
Rotation direction
Counter-clockwise (facing output end)
Power output method
Flywheel output
Dimensions L×H×W  mm×mm×mm
2692×2860×1970
Weight   kg
5300

 
C.Technical specification of alternator
 

Generator model
Rated power(KVA)
625
Rated voltage(V)
400
Rated current(A)
902
Rated frequency(Hz)
50
Rated power factor (lagging)
0.8
Rated speed(r/min)
Rated speed
1000
Protection class
IP23
Insulation class
Class F
Cooling method
Natural cooling

 
D.Technical specification of control panel
 

Model
PCK1-RB500
PCK1-RZ500
Functions
The PCK1-RB500 control panel has comprehensive protecting function for over-current, short circuit, reverse power, low frequency and low voltage etc.
It also has the functions of semiautomatic quasi-synchronism, automatic power factor adjustment.
PCK1-RB500 can also cooperate with TEM system and monitoring instrument, to monitor water temp, oil temp, oil pressure and speed of the engine. Once threat emerges, control panel will alarm and automatically switch off for protection.
The PCK1-RZ500 control panel has comprehensive protecting function for over-current, short circuit, reverse power, low frequency and low voltage etc.
It also has the functions of automatic quasi-synchronism, load distribution and automatic power factor adjustment.
PCK-RZ500 can analyze the condition of the grid, once the grid is shut down, it can cut the gas generator set from the grid until the grid start to work again, then automatically recover the connection.
The control panel can also cooperate with TEM system and monitoring instrument, to monitor water temp, oil temp, oil pressure and speed of the engine. Once threat emerges, control panel will alarm and automatically switch off for protection.
Application method
Work with grid connection or single unit operation 
Work with grid connection or single unit operation or parallel operation
Rated power (kW)
500
500
Rated voltage(V)
400
400
Rated currency (A)
902
902
 Frequency(Hz)
50
50
Rated power factor (lagging)
0.8
0.8
Dimension
L×H×W
mm×mm×mm
800×1000×2200
Installation bore :W×H=650×750  4-R7×30 Deep bore
 

1.3  500GF1-PWG Configuration of gas generator set

Standard configuration
 
Standard configuration includes five parts: gas engine, generator and heat exchanger installed on the platform; standard control panel; TEM counter; free parts, spare parts and tools.
 
 
 
 

2. Guarantee period

 
Packing: To be packed in strong new wooden case(s) or carton(s), suitable for long distance ocean/parcel post/air freight transpiration and to change of climate, well protected against moisture and shocks. The sellers shall de liable for any damage of the commodity and expenses incurred on account of improper packing and for any rust attributable to inadequate or improper protective measures taken by the Seller in regard to the packing.
Guarantee period:Within one year after the delivery time or accumulative total running hours up to 1500hs, two take the first.
 
 
Warranty, overhaul cycle and service life of main engine components
 
 
Warranty: 12 months after delivery or 1500hrs of operation. The period which ends first is the warranty period.The first overhaul is after 20000hrs of operation.
Referential service life of main engine components: Crankshaft and crankcase: 60000hrs
Connecting rod: 40000hrs, Turbocharger: 7500hrs
Piston and bearing bush of crankshaft: 20000hrs, Cylinder block: 15000hrs
Notice: the above data are gained when engine operates under gas condition of methane content :50%; H2S content less than or equal 50 mg/nm3 . The actual service life of such components is determined by user’s gas condition and maintenance.
 
 
 

3.requirements:

3.1.ambient conditions:

a)    Ambient temperature : -40oC~40oC
 
b)    Relative humidity less than or equal 95%(35oC)
 
c)    ASL Above Sea Level less than or equal 2000m
 
d)    Working atmosphere:  flashing board
 

3.2 Requirements for gas source

Biomass gas should be purified before burning in engine(minimum requirements)
Biomass gas temperature  less than or equal 40oC;
Biomass gas pressure 3~10kPa; Fluctuate rate of pressure less than or equal 1kPa/min;
Tar less than or equal 20mg/Nm3 , H2S less than or equal 200mg/Nm3 , NH3 less than or equal 20mg/Nm3 , Granule less than or equal 5μm , Granule less than or equal 30mg/Nm3 ;
Moisture less than or equal 40g/Nm3 ,and gas LHV greater than or equal 5MJ/ Nm3.
 
For the optimization of system performance, users should provide data of gas composition and pressure to us.


 

4.   Price 

No.
Description
subentry
Qty
Unit Price
(USD)
Total price
(USD)
1
Main Equipments
 
 
 
Biomass Generator Set
 
                                                                     Model:500GF1-PwG
(50Hz/400V)
G12V190ZLDK  Biomass Engine
1unit
1 Set
172388.1
172388.1
2
alternator(1FC6)
1unit
3
Electronic Governing(Woodward2301A)
1set
4
Platform  &  coupling
1set
5
Silencer and Exhaust pipes
1set
6
Control panel for Generator set
(PCK1-RB500)
1unit
7
Batteries for Control panel and start-up
6units
8
Technical documentation
1set
9
Attached spare parts, tools and accessory
1set
10
Monitoring
TEM Computer System
1 Set
9850.746
9850.746
11
multi-fan radiator+ with control panel(for 500GF1-PwG)
1 Set
11492.54
11492.54
12
Freight
FOB Qingdao or Tianjin Port
1 lot
656.7164
656.7164
Total
500GF1-PwG
194388.1
Spare parts for one year operation(1 set)
10671.64

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note:
1、The quotation is based on standard configuration.
2、Packing: naked package (accessories: wooden Export standard)
3、Payment : 30% by T/T for deposit, the rest of 70% by irrevocable L/C at sight, should be reaching us before delivery. or 100% irrevocable L/C at sight.
4、Delivery time: 50 days after getting 30% deposit by T/T.
5、Service rules : commissioning and training is free(within 14 days).The customers will be charge of the round trip air tickets fee and room and board fee abroad.
6. The price is of full new gas generator set. Not modification gas generator.
7. This quotation is valid for 1 month.
 
 
 

Price List for 2000kW Biomass (Producer) Gas Generator set

 

 


Total 0 pages 0 items, Now at 0 page. First. Last. Next End


Statement: Any reference to the OEM, part number or other OEM, information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]