BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > geothermal power plant > Work Scope


Google

2. Scope of Work of Geothermal Power Plant

The scope of works of the power plant includes design, manufacture, supply, procurement, erection, test and commissioning of the geothermal power plant on EPC basis, and also basic design of civil workls.

2.1Civil Works

Basic design of civil works including following items and civil work supervising,

a) Foundation and loading design and calculation for building

b) Foundation and loading design and calculation for main equipment

c) Foundation design and calculation for cooling tower

d) Foundation design and calculation for water tanks

e) Foundation design and calculation of condenser

f) Foundation design and calculation for other equipment

g) Design of inner size of ll uilding

Design for connection of beam, pile, cross-section

Design for location and size of doors, holes etc. 

2.2 Mechanical works

B-1 Turbines

Condensing steam turbines (single flow and skid mounted type), with attached stop valves, governing system, oil control and lubrication system, moisture separation and dryings, turning gear, over-speed detection, vibration monitoring, safeties and protections, steam by-pass system and its silencers.  

B-2 Steam piping & demisters

Steam piping, valves, with demister on the principles of vane separation, water injection system for removing silica on turbine inner space and blades.  

B-3 Jet Condensers

Steam condensers, direct contact, spray with water mixing type with internal features for functions of steam condensing, condensate water cooling and non-condensable gas extraction including hot well pump

B-4 NC gas extraction system

Non-condensable gas (NCG) in the steam of content up to 3% in weight of steam flow extraction system for removing it (by vacuum pump) from turbine exhaust steam

B-5 Cooling water system

Main water cooling system complete with piping (fiberglass reinforced polyester), fittings, filters and pumps, control system, cooling tower (counter flow type or cross flow type, mechanical induced draft, with splash fill) including reinforced epoxy-coated concrete basin, fan stack (made of fiberglass reinforced polyester (FRP)), drift eliminator, infill, water distribution system, mechanical equipment

B-6 Re-injection water system

Pumps, pipes and associated equipment

B-7 NaOH dosing system

NaOH storage tank (10m3) and control valves

B-8 Service water supply

Water storage tank, filters, pumps, pipes (incl. Pipe river to power plant, 500m) associated equipment (service water to be used for initial fill of water cooling basin and fire fighting system)

B-9 Fire fighting

Fire detection system, fire fighting water system included hydrant network and pipes, and water spay extinguishing system on turbo-generator lubricating units and main transformers, portable and mobile fire extinguishers

B-10 Handling equipment

Overhead traveling crane (electric controlled) including structures, rails, hoists and associated equipment, mobile handling and lifting devices and equipment

B-11 Laboratory and Personnel safety equipment

Chemical analysis laboratory, H2S detection and protection system

B-12 Workshop equipment

Special tools and devices for turbine and generator, common tools and appliances

B-13 Ventilation and air conditioning

Ventilation and air conditioning

2.3 Electrical works

C-1 Generators

Generators with neutral grounding and excitation system, generator main electrical output system

C-2 Transformers

Main transformers and station transformer

C-3 Medium voltage system

Switchgears

C-4 Low voltage system

Switchgears

C-5 Control and monitoring system

Computer system with logic control system for control and supervision including one video display unit printer, back-up vertical panel for conventional (manual) control of main functions, protection system.

C-6 Protection system

Protection system for electric and mechanical equipment

C-7 Exigency serviced system

Diesel generator, DC power system, UPS

C-8 Lighting and earthing

Lighting and earthing system

2.4 Others



Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]