BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       Hynudai 5.5mw to 9.3mw Gas Engine Generator Sets  
       500kw-5500kw Gas or Duel fuel diesel Generator  
     Solar-Panel-Power-Plant-Quotation  
     Power Plant Auxiliary  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > geothermal power plant > Ventilation


 

7 VENTILATION AND AIR CONDITIONING SYSTEMS

7.1 Ventilation Systems

Ventilation systems are provided in the turbine generator building, baghouse, control building, and other areas such as diesel generator set room, air conditioning plant room, demineralizer building and various pump houses.

7.2 Air conditioning Systems

Air conditioning is required in various areas in the main control rooms that house control equipment. Air conditioning is provided by individual air conditioning units.

The air duct system should be equipped with necessary fire damps which should be interlocked with fire alarming system. When fire taking place, the fire damps should be operated to shut off the air flowing, and the air conditioning units should be shut down at the same time. After put out a fire completely, the fire damps should be come back to original state and the air conditioning system should be take into operation manually. 

Office, classroom, test room and other necessary air conditioning room, should be conditioned by split air conditioner, The operation and installation should be depend upon the requirement of the manufactory. 

The electrical rooms should be equipped with ventilation system to keep the rooms of positive pressure so that the H2S would not retain in the rooms and the content of H2S in these rooms should be kept at an acceptable level, and the ventilation system should also be used to discharge heat generated by the electrical devices. 

Special protection has to be foreseen for electrical equipment with respect to H2S gas, which is usually found in the ambient air in geothermal power plant projects. The supply air to electrical switchgears, relay, computer and control rooms shall be treated (H2S filters)..The rooms requiring the supply of H2S free air shall be provided with special features, such as positive pressure with air tight doors etc. and monitored by H2S detectors accordingly.



Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
ycl1227@163.com