BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > Thermal Power proposal


Google

Sample 2x50MW Coal Fired Thermal Power Plant Proposal and Quotation

Content

1. Quotation Remark and Specification

2. Power plant's Technical Specification on Main System

3. Main Schedule of the Implementation

4. Summary of Quotation

5. Main List of Power Plant Equipment

 /P>

1. Quotation Remark and Specification

a. Quotation validity December 2006

b. The quotation is a EPC quotation including power plant design, equipments and their auxiliaries, materials, spare parts, installation and commissioning, training, not including maintenance and operation. Civil engineering contract not included, and should be offered to local contractors and finished by locals.

c. Equipments should be packed to Chinese equipments export standard.

e. Power plant design, equipment manufacturing and materials should be to Chinese National Standards for power plants.

f. This quotation is based on the limited information available from owner, and referred to our similar power plants built in Indonesia. The quotation and specification should be revised to new data and owners' detailed requirements through discussion. 

g. Other issues should be referred to the forms of each equipments in the .xls file

2. Power plant's Technical Specification on Main System

a. Thermal System specification

Boiler YG-240/9.8       2 units of CFB boiler

          Producer�?Jinan, with ISO9002,National First Class boiler producer

          Rated Flow:                      220t/h   

          Steam Pressure:               9.81Mpa 

          Steam Temp.:                   540�?/P>

          In feeding water temp.:     215�?

          Fuel:                                 Coal

          Fuel Value�?SPAN style="mso-spacerun: yes">                    20934 kJ/kg

          Design Efficiency:             90%

Steam Turbine:N50-8.82               1unit   Qingdao Turbine

         Producer�?Qingdao Turbine    IS9002 

         In steam Flow�?SPAN style="mso-spacerun: yes">                186t/h

         In steam Pressure�?SPAN style="mso-spacerun: yes">          8.82Mpa 

         In steam Temp.�?SPAN style="mso-spacerun: yes">              535�?

         Rated Power�?SPAN style="mso-spacerun: yes">                 50MW

         Rated Speed�?SPAN style="mso-spacerun: yes">                 3000r/min

Steam Turbine:C50-8.82/2.55         1 Unit

         Producer�?Qingdao Turbine IS9002 

         In steam Flow�?SPAN style="mso-spacerun: yes">  Rated/Max.             458/480 t/h

                            Condensing                     200 t/h

         In steam Pressure�?SPAN style="mso-spacerun: yes">                           8.82Mpa 

         In steam Temp.�?SPAN style="mso-spacerun: yes">                               535�?

         Extraction:    Rated/Max.                    72/95 t/h

                            Extraction Pressure:        2.55±0.30 Mpa  (Abstract)

                            Extraction Temp.:            335 �?/P>

Turbine Generator:QF-50          2 Units

         Producer�?SPAN style="mso-spacerun: yes">   Jinan Generator   IS9002 

         Rated Voltage�?SPAN style="mso-spacerun: yes">                                11KV

         Rated Power�?SPAN style="mso-spacerun: yes">                                  30MW

         Rated Speed�?SPAN style="mso-spacerun: yes">                                  3000r/min

         Cooling�?SPAN style="mso-spacerun: yes">                                           Air Cooling

b. Coal and Ash handling system specification

Coal Supervison:coal be transported to plant by owner, and coal stockyard and dry coal booth be installed with dry coal capacity of 15 days usage.

There are loaders and bridge Coal trucks for loading and loading coal, the 8MM pulverized coal convoyed to two coal bunkers in from of the boiler, with each bunker' capacity for 12 hours coal supply.

Two streams of conveyor systems be installed, with detection and removal of ferrous tramp material, screening, crushing, and metering equipments. Operation of two shifts, each shift for 5.5 hours. 

Fuel handling system be equipped with limestone handling equipments if higher sulpher content in coal, or ratioed limestone be added to coal stockyard and mixed for fuel supply to boiler.

Ash handling system: boiler flu gas handled by electro-precipitator with efficiency of 99.7%,precipitated ash be transported to two ash bunkers by positive pneumatic ash removal ways with ask bunkers holding capacity for 7 days. Bunker beneath ash be removed in dry or wet condition to outside plant by truck. In the plant only transient ash sump constructed.

Cinder removal in dry condition, boiler beneath cinder or ash be cooler by cooler and convoyed to cinder bunker and then trucked out. The bunker is of one day capacity.

Boiler cinder and ash can be reused, but not quoted in this quotation.

c.Electrical System Specification

This proposal is for that power supply is not connected with national grid�?1kv generator is connected to transformer and step up to 22kv bus bar, Single bus bar is adopted, and 4 routers of feed out line to ender users. High voltage for in plant usage be supplied directly from generator,single bus bar is used. 0.4kv in plant usage power is evacuated from 11kv in plant high voltage. The standby transformer connected by power cables will automatically put into service when there are problems with certain prime transformers. DC power supply system is installed too, Relay protection and control system are governed by Micro computer. Steam turbo generator is of controllable silicon static excitation. Most of the electrical system are made by Joint ventures with international quality.

Plant standby and starting power is offered by owner, and power transmission, illumination and telecommunication is not inclued in the quotation.

D. Thermal control specification

Thermal control system covering boiler, steam, dearator and water supply, chemical water treatment, coal feeding and ash handling and so on. Boiler and steam turbine control is of DCS. DCS covering mainly: Data Collection and Process system (DAS). Analogue control System (MCS), Sequence control system (SCS) and so on, with their main tasks as check. automatic governing (MCS). main auxiliary on-lock protection (SCS. protection and alarming. All the equipments and systems are made by mature and high standard quality.

Auxiliary systm such as boiler ash blow, ash removal, coal feeding, and chemical water treatment systems are using independent PLC system.

 Control methods: boiler, steam turbine, dearator and water supply are of centerilized control, chemical water treatment, coal feeding and ash handling are of at site control.

e. chemical water treatment is adopted with process of anion-ion exchange desalt with capacity of 40t/h. 

f. Water Suplly System�?BR>The quotation not including water source site supply and purification, daily life water consumption.

Including water supply for equipment cooling, fire protection water and waste water treatment.

Steam turbine cooling usage of about 13500t/h, recycling method is used.

The total water supplement is about 400m3h�?SPAN style="mso-spacerun: yes"> 

g. Auxiliary operation systems: meeting the demand for equipment checking and repairement, instrumentation, and laboratory, ventilation and fire protection. Some large sized components or parts can be made assembled by local contractors. Office and dorm are not included in quotation.

3. Main Schedule of the Construction

Schedules in two stages:

Stage one of proposal: 60 days after complete data or documents available

Stage two of implementation: 660 days after signature. 

To be continued.

 
4. Quotation (2x220+1xC50+1xN50) Thermal power plant, coal fired with bolier
NO.
Item Name
Expenses
(RMB10
4)
Expenses
(USD)
1 Combustion system 8939.72 11,316,104
2 Thermodynamic system 6553.85 8,296,016
3 Fuel System 706.01 893,687
4 Ash remove System 506.04 640,562
5 Supply & Drainage water system 366.01 463,301
6 Demineralized water system 334.62 423,568
7 Electrical system 6568.54 8,314,613
8 The thermal control and instrumental system 1568.62 1,985,595
9 Subsidiary production equipment 331.14 419,170
10 Start-up power supply 1380.54 1,747,524
 /FONT> subtotal 27255.11 34,500,139
11 Main materials 2949.72 3,733,827
12 Expense for internal transportation and commodities inspect 2270.18 2,873,639
13 Integration, management and tools 398.58 504,532
14 Design expenses 932.75 1,180,691
15  Civil work cost (Ex foundation treatment) 10865.00 13,753,165
 /FONT> Foundation treatment 901.00 1,140,506
16 Installation work cost (Ex large construction equipment cost) 6909.08 8,745,671
 /FONT> Large construction equipment cost 424.00 536,709
 /FONT> Detail test & Running-in cost 212.00 268,354
 /FONT> Fuel cost 1653.60 2,093,165
17 Other one cost 3430.18 4,341,997
 /FONT> subtotal 30946.08 39,172,256
 /FONT> 合计Total expenses 58201.19 73,672,395
RMB change into Us dollar is 7.9�?/FONT>1 and quotation will be revised to exchange rate.


- Used Steam Turbine Plants from China 3/6 2008
- Quotation for 2X50MW Thermal Power Plant 15/11 2006
- Quotation for 2X50MW Thermal Power Plant 15/11 2006
- Sample Quotation of thermal plant 2x50mw 15/11 2006

Total 1 pages 4 items, Now at 1 page. First. Last. Next End


Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]