I. DESIRED SCOPE OF SUPPLY A. Civil Work: â–?/SPAN> Included B. Installation and Commissioning: â–?/SPAN> Included C. Boiler and Auxiliary equipment: â–?/SPAN> Included D. Turbine and Auxiliary equipment: â–?/SPAN> Included E. Generator and Auxiliary equipment: â–?/SPAN> Included F. Fuel handling system: â–?/SPAN> Included G. Water Treatment system: â–?/SPAN> Included H. Electricity System: â–?/SPAN> Included I. DCS and Instrumentation: â–?/SPAN> Included J. Cooling Water System: â–?/SPAN> Included I. INFORMATION NEEDED FROM THE OWNER A. Site Information:
B. Fuel Specification (please attach analysis report if available):
C. Raw Water Analysis (please attach analysis report if available):
I. FINANCIAL DATA & CONDITIONS:
Codes/Standards required: N GB | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Boiler: |
Type: To suit manufacturer’s design Capacity (t/h): To suit manufacturer’s design Steam Pressure (Mpa): To suit manufacturer’s design Steam Temperature (�/SPAN>):To suit manufacturer’s design Feed Water Temperature (�/SPAN>): 25 � | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Turbine: |
Type: To suit manufacturer’s design Output Requirement (KW): to suit 1400MWe output Exhaust Pressure (Barg): To suit manufacturer’s design Process Steam Requirement (if any) Quantity (t/h): n/a Pressure (Barg): n/a Temperature (�/SPAN>):n/a | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Generator: |
Output Requirement (KW): 1,400,000 Output Voltage (KV): to be determined by Smelter Plant Frequency (Hz): 50 Excitation Type: To suit manufacturer’s design | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Emission Requirement: |
World Bank Emissions standard to be used as guideline. Final requirement after EIA approval. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Owner’s Brand Preference for Main Equipment: |
N Chinese Product | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Other Special Requirement (Please Specify): |
O&M contract with availability, capacity and heat rate guarantee to be proposed by manufacturer |
I. DESIRED SCOPE OF SUPPLY
A. Civil Work: â–?/SPAN> Included
B. Installation and Commissioning: â–?/SPAN> Included
C. Boiler and Auxiliary equipment: â–?/SPAN> Included
D. Turbine and Auxiliary equipment: â–?/SPAN> Included
E. Generator and Auxiliary equipment: â–?/SPAN> Included
F. Fuel handling system: â–?/SPAN> Included
G. Water Treatment system: â–?/SPAN> Included
H. Electricity System: â–?/SPAN> Included
I. DCS and Instrumentation: â–?/SPAN> Included
J. Cooling Water System: â–?/SPAN> Included
I. INFORMATION NEEDED FROM THE OWNER
A. Site Information:
|
Location: |
Latitude: 4° 1'38.75"N Longitude: 103°22'13.35"E (approx location) |
|
Site Layout (if available): |
|
|
Site Conditions (please attach the reports concerned): |
Meteorological Condition <Info not available yet> Topographical Condition <Info not available yet> Geological Condition <Info not available yet> |
|
Distances of fuel, power, water, etc, from the site: |
Fuel: Coal to be imported thru jetty about Power: at site boundary Water: at site boundary Other (Please Specify): |
|
Distance to Consumption Points: |
Proposed Plant ~ End User: Adjacent to end user Proposed Plant ~National Grid: |
|
Information on the existing system (if the expansion project is applied): |
Layout of The Factory Existing Water Treatment System: Factory Existing Electricity Single Line Diagram Existing Transformers Specification: Other Systems (Please Specify): |
B. Fuel Specification (please attach analysis report if available):
|
Type: |
Sub-butuminous coal (values below are approximate and final fuel spec will be discussed to suit manufacturer’s machines) |
|
LHV (Kcal): |
4800 (AR Basis) |
|
Carbon Content (%): |
35-58% (Air Dried Basis) |
|
Volatile Content (%): |
27-43.3% (Air Dried Basis) |
|
Sulfur Content (%): |
<1% (Air Dried Basis) |
|
Ash Content (%): |
<15.5% (Air Dried Basis) |
|
Moisture (%): |
28% (AR Basis) |
C. Raw Water Analysis (please attach analysis report if available):
|
Hardness: |
-no info yet- |
|
PH Value: |
-no info yet- |
|
Conductivity: |
-no info yet- |
|
Temperature: |
-no info yet- |
|
Pressure: |
-no info yet- |
|
Total Alkalinity: |
-no info yet- |
|
Total Dissolved Oxygen: |
-no info yet- |
|
Ca/Mg/S/Cl/Fe/Si/O2 Content: |
-no info yet- |
I. FINANCIAL DATA & CONDITIONS:
|
Proposed Source of Financing: |
Syndicated local and foreign loan |
|
Proposed Capital Investment on The Project and Estimated Cost of Equipment/Accessories for Budgeting Purposes: |
|
|
Banking reference: |
|
|
Other relevant information on customer's financial position: |
|
|