7. Construction process schedule
In according to the similar project experience, the project constructing process schedule as per the attached time schedule.
After approving of the investment feasible schedule, it can start to purchase the equipment, the construction design will be set up just one month after the equipment purchased. The civil construction shall be commerce within two months as the civil construction design done. The equipment installation can be executed with the civil working gin alternated. The seventh month after the construction design, single equipment start to testing and commissioning test and try operation will be start within eight months.
Detail bar time schedule as Attachment - A
8. Operation personnel
This project put into operation just as the workshop of the Cement Factory, so the added personnel not included the maintenance employee (whose shall be shared with the Cement Factory)
Job and location |
Each shift |
Subtotal |
�?/SPAN> |
�?/SPAN> |
�?/SPAN> |
�?/SPAN> |
|
Heat captive power station |
|
|
|
|
|
A. Office |
|
|
|
|
|
Head of station and thermo engineer |
1 |
|
|
|
1 |
Electrical and instrument engineer |
1 |
|
|
|
1 |
B. Operator |
|
|
|
|
|
Boiler |
1 |
1 |
1 |
1 |
4 |
Turbine |
1 |
1 |
1 |
1 |
4 |
Electrical |
1 |
1 |
1 |
1 |
4 |
Chemicals and analyzer |
1 |
1 |
1 |
|
3 |
Total amount |
17 |
To be continued to
|