    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
      3x42mw gas turbine plant proposal   
    15MW Heat recovery plant GE 6B Gas Turbine Plant   
    200mw Coal Fired Plant   
    600mw ultra super critical power plant   
    1500mw GE gas turbine plant   
    3x750mw Gas Turbine Combined Cycle Power Plant   
    360000 M3/D Sea Water Desalination   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
      Proposal quotation of 2x2.6mw gas engine generator   
      500kw-5200kw gas engine generator series   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > Questionnaire for Gas/HFO/Liquid Fuel Power Plant


 

Questionnaire for gas / HFO liquid fuel Based Power Plant

Information Required for Selection / Sizing/ Design of Power Plant

A SITE CONDITIONS

1) Altitude (m above Sea Level) :-

2) Maximum Ambient Temperature. (° C) :- 45 Degree Cent

3) Relative Humidity at Maximum Ambient ( % ) :-

4) Wet Bulb Temperature of the Area (° C) :-

5) Environment (Dusty / Clean) :- Clean

6) Presence of any Hazardous or Chemically :-Active Gases In Surrounding Air

7) Soil Condition at site (normal, marshy :- Normal black cotton etc.)

8) Soil bearing capacity :-

(< 15 tons/m2 or > 15 tons/m2)

9) Water table at site :-

 

B POWER REQUIREMENT ( As discussed personally present conditions given )

1) Maximum Demand (kVA) :-Max Demand reached in Last 4 Years - KVA

2) Minimum continuous process loads (kVA / kW) :-

3) Grid Voltage and Frequency :- 22 KV ( +/- 10 % ) Variation Percentage :- 50 Hz ( +/- 4% )

4) Whether Independent Auxiliary Power Supply?:- Yes ( 415 V) available

5) Proposed Power Plant capacity (MW) :- Option 1 - for 50 % Load; Option 2 - for 100 % Load

 

C STEAM REQUIREMENT (IF ANY) If system can provide the steam it can be used for preheating in our existing system.

At present we are using thermal oil based heating system

1) For process Steam (Quantity T/hr., :-pressure)

2) For air-conditioning / chillers etc. :-(quantity T/hr., pressure)

3) For fuel heating only :- For Fuel Heating

4) Existing Boiler(s) details :-

 

D FUEL

1) Type of fuel to be used :- HFO/ HPS / LSHS / FO / LDO / HSD / NG / BIOGAS

(Please provide specifications of fuel, in case of Gas Annexure IV shall be filled also)

2) Approximate price of fuel at site (Rs. / kL) :- Rs. 18000 per KL

3) Design Viscosity of Fuel handling System :-(380 or 500 cST at 50° C)

4) Fuel Handling and Storage Facility at site :- Tank of 65 KL capacity (If any for existing Generating Sets)

INFORMATION REQUIRED TO DETERMINE OPERATING PHILOSOPHY

A POWER PLANT OPERATION :- Continuous (Continuous / Base Load / Standby / Emergency / Peaking)

B PARALLEL OPERATION

1) With grid ( Yes / No ) :- Yes

2) Between proposed DG Sets (Yes / No ) :- Yes

3) With existing DG / TG Sets (Yes / No) :- No

Details of existing DG /TG sets (if parallel operations required.)

i) Supplier / Model / Name plate details :- We have Old 180 KVA DG set which are used at present for Emergency Lighting etc incase of Power

shutdown / Breakdown

ii) Rating (kVA / kW) :- 180 KVA * 2 Nos

iii) Make / Model / Type of Governor :- Kirloskar

iv) Type of Excitation / AVR :-

v) Synchronization Facility :-

 

C SPECIAL REQUIREMENTS

1) Motor Starting Duty (If any) :- We have rolling mills. The (If yes, please provide details wherever possible) maximum size of the motor is 750

HP DC having a full load current of 1006 Amp. When it starts from standstill it takes @ 1600 Amp + current.

2) Furnace application :- We have 3 No. Foil

Annealing Furnace. 1350 KW

3) Non-linear Thyristor Loads, if any :- Thyristor drives - Yes

4) Any other non-standard loads, if any :-

5) Voltage requirement (3.3 / 6.6 / 11 kV) :- 3.3 KV ( my existing feeder is 22 KV incoming and Step down to 3.3 KV )

6) Water Availability :-(Sufficient - Cooling Towers, Scarce - Radiators)

If Yes in case of C1, C2 and / or C3 above Annexures - I. II and III (Page 5 of 8, 6 of 8 & 7 of 8) shall be filled also. In case of Non-linear loads please provide harmonics analysis report also.

INFORMATION ABOUT THE CLIENT (PURCHASER / OWNER COMPANY)

1) Contact Person & Designation :-

Office Address / Telephone / Fax # -- –Electrical Industries Ltd

2) Name / address / Tel. of Consultant (if any) :- NA

3) Annual Turnover of the Company :-Plant @ 168 Cr

4) Main Product and installed capacity :-Aluminum. foil & Packaging Products

5) Location of the Site :- Kalwa - Thane

6) Availability for proposed Power plant at site :-

7) Contact Person at Site :- As Above Address / Telephone / Fax #

8) Whether power requirement is for :- Existing Plant existing plant /expansion project / new project

9) Duty structure :-(EPCG / EOU / Project Import / IPP)

10) Project Implementation Schedule :- FY 07-08 (Power Out - month / year)

11) Mode of Financing the Project :-

12) Type of Offer Required :- Budget + Firm (Feasibility Study / Indicative / Budget / Firm)

13) Cost of existing Power

(a) From Grid including Maximum. Demand Charges :- @ Rs. 4.4 per Unit

(b) Generated from other source :-

(DG / TG etc.)

Additional Information :-

Max Demand Charges Rs. 350 per KVA

Rate Rs. 2.85 per Unit

Other Charges Rs. 1.0 Per Unit

Avg. Unit Charge Rs. 4.4 per Unit

Avg. Consumption 1250000 units per month