Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > China top conveyor belt for power, mining, port


Google

Quotation and specification on TOP China Belt conveyor for power plant, port, mining and cement plant
Content
 
1、Brief Introduction
2、Qualification Certificates
3、Business Achievements & Certificates from owners
4、Financial Data
5、Human Resource and Equipments
6、View of factory and main equipments
 
1. Brief Introduction
1) company Profile
Hengyang Conveying Machinery Co., Ltd. (HY) is a professional belt conveyor manufacture with a history of self design and manufacturing over 50 years. The company has provided high quality products amount to more than 3,000,000m in many projects for domestic and overseas clients. Centralized by Ministry of Machine-Building Industry (Beijing Hoisting and Conveying Machinery Research Institute ,  HY participated in the design, manufacturing, verifying and exterminating of TD62, TD75, DX, DTII, and DTII(A)belt conveyor, which is a major contribution in the technological promotion of belt conveyor industry. HY is a backbone enterprise in belt conveyor industry, one of the manufactures of national heavy fire power equipments and auxiliaries specified by planning commission, Ministry of Machine-Building Industry and Ministry of Electric Power, as well as the specified export products manufacturer.
  Our products has showed the advanced technology and equipments�?performance in many projects which have already been put into operation. Since the 1980s, HY has provided equipments in the electric power industry successively for more than 120 projects in power conveying systems, 117 of which are 2×300MW above. In hydropower construction industry, HY successively provided large conveying equipments for power stations, such as Wuqiangxi hydropower station, Gezhouba hydropower station, the three gorges hydropower plant and longtan hydropower station, etc. These equipments have made contributions for national electric power industry and the engineering construction, and are high praised by end users. In 1987, HY participated in the conveyor system supply for Shanxi Datong mine bureau Sitaigou coal preparation plant (belt width B=2000mm, belt velocity V=4m/s, capacity Q=5400t/h). This project played a key role of China’s “Western coal shipped East�?and export plan. In 1996, the electromechanical equipments provided by HY for long distance conveying system of Fujian Longyan Sande Cement Plant (belt width B=800mm, belt velocity V=2.5m/s, capacity Q=800t/h, max. single length Lmax=4.74km, total length L=10.059km) was cited by headquarter of Sande Cement Plant in Singapore. The advantages as low cost and good performances have brought the owner with notable economic benefits. The long distance belt conveyor provided for France Lafarge in 2002, and the max. single length (L=8.4km, B=1000mm) conveyor electromechanical system provided for Henan Zhumadian Yulong Cement Co., Ltd in 2004 are successfully commissioned. In 2006, HY was specified to be the supplier of belt conveyor system for Shanxi Jidong Jingyang Cement Plant. The 9.43km belt conveyor manufactured and erected by HY, has obtained highly praises in belt conveyor industry and the services are appreciated by end user. All these experiences epitomize the technical innovation, manufacturing ability and service level.
2 Company scale and structure
The company occupied an area of 200,000m2, possessed more than 300 sets and units of equipments of which 87 sets are large and heavy equipments. It subordinates 7 sub factories; they are pulley sub-factory, idler sub-factory, reducer sub-factory, metal structure sub-factory, electric power sub-factory, finished product sub-factory, and rubber casting sub-factory. The existing staff No. is 1432, including 276 engineering technicians; 230 of which are engineers or even senior engineer. 
3 Products
The main products of the company are: TD75 , DTII,DTII(A�?type common used belt conveyer, DX high strength steel cord belt conveyor, DT75 belt conveyor, DCY and DBY rectangular axis hardened reducer, ZDY, DLY, ZSY parallel shaft hardened reducer, ZQ reducer and ICS500-1400-ST type belt scale.  All these products are widely employed in electricity, mining building metallurgy, wharf and some other areas, and were exported to Vietnam, Pakistan, Iran, Iraq, Mauritius, Myanmar, Indonesia, etc.
 
4 Comprehensive Technical level
The whole machine capacity has reached the leading level of China
 
(1) Max. Belt width:  B=2200mm (Datong Mineral Bureau, Huanghua Port,).
(2) Max. Single unit length: L=9430mm (Jidong Haidebao Jinyang Cement Co., Ltd.)
(3) Max. Convey capacity: Q=8700 t/h (Caofeidian 50 million coal wharf)
(4) Max. belt velocity: V =6.1m/s (Huanghuagang Coal Warf)
(5) Max. Belt strength: ST=4500N/nm (Jincheng Mineral bureau)
(6) Max. single power N=6×1070KW(Shanxi Golden Sea Coal Group)
(7) Max. Down move angle (anti- explode): β= -150 (Tianfu Mining Bureau)
(8) Middle drive upward belt conveyor (coke and iron mixture blast furnace belt conveyor B=1800mm)
 (9) Advanced single point supporting float drive device. This device convey with big pitch of strand,compact  structure. It has no high requirements on installation technique, shit for various special basis. (Sande Cement Plant, Dagang Power Plant)
(10) self-moving downhill vehicle (downhill inclination 27°, Wanzhou Port)
(11) 90°corrugated inclined belt conveyor (Zhuzhou Steel)
(12) 60° deep groove angle downhill belt conveyor (Wanzhou Port)
(13) Max. pulley resultant force 1600KN (Pingshuo Coal Industry).
(14) Advanced soft starting (braking) technology. This technology can control the starting (braking) time in the regret of 50s to 250s thus to make good start/brake performance.
 
5 New product development capability.
  From 1970s, our company has taken part in the new products�?development in China, such as DT75type, DX type, DTIItype, and DTII(A)type, etc.
  In 1989, we developed 4 medi-friction rubber belts used in Shanxi Aluminum plant, which acquired “New Product Award"
  During the year of 1983~1984, we developed down explode proof braking rubber belt, which acquired “Technical Improvement Award" from Coal Ministry of Hunan.
  During the year of 1982~1984, we developed horizontal type, inclined type muti-idler electron belt scale, which gained the first place in high precision, object verification and microcomputer process in China. And also acquired “Technology Improvement Award" in Hunan.
  In 1992, we developed inclined rubber belt conveyer, created 3 “tops" of belt width, inclination, and lifting height.
 
  In 2006, the 8139M belt conveyor for Henan Zhumadian Cement Co., Ltd acquired the third prize of China Machinery Industry Union.
  Computer application: CAD and MIS soft ware are adopted.
 
6 Technical Feature
Shot blasting Anti-rust
  This system is material pre-process equipment, which was designed and produced by our company. After the stead metrical been processed by this equipment, it can reach the standard of sa2
Automatic submerged arc welding and Co2 gas protect welding. The main welding seam adopts the automatic submerged arc welding .The idler adopts Co2 gas protect welding in order to assure the quality.
Idler automatic production line. We imported an automatic production line from Mitsubishi, Japan, of which pipe diameter reached φ259mm. The procedures of idler cutting, lathing, welding and installing all finished by chamfer machines, pipe cutting machine , double-end Co2  gas shielded arc welding machine and other automatic production line. Thus the idler quality was assured in technology.
Dry-cast vulcanized rubber production line: 1) oil is used as a medium for heating the rubber vulcanizer. The pulley rubber was heated evenly to assure the quality of rubber casting. 2) The SO2 corrosion defects are defeated by dry-cast vulcanizing. 3) No steam cast defeats.
Gear grinding: 3 sets gear grinding machines are imported from Germany, which ensured the using capacity of the reducer.
Vibration prescription: After the machine frame was processed by the vibration prescription it eliminate most of the welding stress, improved the strength, and avoid the frame became deformed.
Specialized production: Our production is carried with high specialization level. Many parts are produced with molds, which assure the quality.
7  Test Method
Belt conveyer comprehensive test site.
This test site can used to test the relationship between a certain main parameter and the whole unit’s capacity, capacity of each part ,complete capacity of electron belt scale , These test method are benefit for our how produces development.
Large reducer test board. The high speed shaft can be loaded to 20000Nm. This test board can used to measure efficiency, noise, exposure, leakage, cleanliness and other projects.
Idler complete capacity test system
There are 6 sets professional testing equipment for this system ,which can test the rotate resistance, dustproof, waterproof axle bearing ,dropping, run out ,etc.
 
Normal test
 We have a series of complete normal test methods, includes physics and chemistry test, ultrasonic wave crack detection, X-ray crack detection, noise test, paint thickness test, roller rampart thickness test, pulley static balance’s test.
8 Product quality
The company has set up a complete product quality assurance system, and been verified by ISO9001 in Oct. 2000.
Our product of DT75 type gained an award in 1985.DXtype gained an award in 1987. in the year of 1996,1997,2003, our products gained the first prize in the national quality selective examination .
Our DTII belt conveyor has own the Name-Brand award of Hunan Province in 2002, and product quality award of Chinese machinery industry in 2000.
 
2 . Qualification Certificates
1. Business License and Tax Registration Certificates
2. Production license and qualification certificates
ISO9001-2000 certificate
specification certificate in power industry
 
3. Business Achievements & Certificates from owners
 
Item
Project name
capacity(MW)
Model
Spec,
(mm)
Qty
(m)
Delivery date
Remark
1
Shenzhen Western Power Plant
2×300
DTII
1400-1200
2900
2002.05
 
2
Longtan hydropower station left shore system
 
DTII
800~1000
1800
2003.8
 
3
Sichuan Guangan Power Plant (2nd phase)
2×300
DTII
1200~1400
634
2003.6
 
4
Chongqing White crane Power Plant
1×300
DTII
1000
1634
2003.9
 
5
Yunnan Jinghong hydropower station
 
DTII
800~1000
1200
2003.11
 
6
Ningxia Shizuishan Power Plant
2×300
DTII
1000-1200
650
2003.06
 /FONT>
7
Long tan hydropower station
2×150
TD75
800-1000
2646
2003.06
 /FONT>
8
Hebei Xibaipo Second Power Plant
2×600
DTII
1400
2860
2005.04
 /FONT>
9
Shanxi Yangmei Group  Gangue Power Plant
2×200
DTII
1000
341
2004.12
 /FONT>
10
Datang Shentou second Power Plant 2rd phase
2×600
DTII
1400~1600
1931
2004.5
 
11
Datong Power Plant 2rd phase
2×600
DTII
1400~1600
3218
2004. 6
 
12
Guizhou Pannan Power Plant
4×600
DTII
1400~1600
3280
2004.12
 
13
Guizhou Qianxi Power Plant
2×300
DTII
1400
2760
2004.11
 
14
Shanxi Qunsheng Power Co., Ltd.
2×300
DTII
650
700
2004.8
 
15
Shanghai Xinke
2×300
DTII
1000-1200
2138
2004.02
 /FONT>
16
Tianjin Dagang Huashi Power Plant
2×350
DTII
1200
1965
2004.04
 /FONT>
17
Ningxia Zhongning Power Plant
2×300
DTII
1000-1200
1850
2004.07
with coal feeder
18
Shanxi Pingshuo Gangue Power Plant
2×50
DTII
650
253
2004.07
 /FONT>
19
Guixi Power Plant
2×300
DTII
1000-1200
2100
2004.08
 /FONT>
20
Xiangtan Power Plant
2×600
DTII
1400
1400
2004.09
 /FONT>
21
Yueyang Huaneng Power Plant
2×300
DTII
1200-1400
2300
2005.03
 /FONT>
22
Huadian Shimen
2×300 /FONT>
DTII
1400
1300
2004.09.
 /FONT>
23
Jiangxi Fengcheng Power Plant
2×600 /FONT>
DTII
1400
2800
2004.09
 
24
Huadian Shimen
2×300
DTII
1200-1400
1900
2004.12
 
25
Yichang Gezhou Dam Lingao Project
 
DTII
500-1000
726
2004.12
 
26
Huaneng Yueyang Power Plant
2×600
DTII
1400
1640
2005.01
 
27
Gansu Zhangye Power Plant
2×330
DTII
1400
880
2005.01
 
28
Inner Mongolia Huahai Bofa Power Plant
 
2×330
DTII
1000�?400
1015
2004.08
 
29
Taishan Power Plant
2×600
DTII
1400-1800
500
2005.02
 
30
Sichuan Bashu Jiangyou Power Plant
2×300
DTII
1200
1800
2005.3
 
31
Guodian Sichuan Huayingshan Power Plant
2×300
DTII
1400
3103
2005.6
 
32
Yunnan Datang Kaiyuan Power Plant
2×300
DTII
1200
1815
2005.5
 
33
Datang Chaozhou Sanbaimen Power Plant
2×600
DTII
1400-1800
5300
2005.05
 
34
Hebei Xibaipo Power Plant
2×600
DTII
1400
2860
2005.04
 
35
Noth Western Power Project Shenhua Sunshine Power Plant
2×135
DTII
800
1290
2005.04
 /FONT>
36
Ningxia Maliantai Power Plant
2×330
DTII(A, )
1200
2238
2005.05
 
37
Inner Mongolia Huadian Botou Power Plant
2×600
DTII
1600
2700
2005.09
 
38
Zhenzhou Xinli Electricity Power Co., Ltd.
5×200
DTII
1200-1400
2900
2005.04
 /FONT>
39
Baotou Dingxi Power Plant
2×600
DTII
1400-1800
2640
2005.06
 
40
Zhangjiajia Sangzhi Comprehensive utilization Power Plant
 
 /FONT>
DT75
650
400
2005.06
 /FONT>
41
Jiangmen Guoyang Thermal Power Plant
 /FONT>
DTII
800-1000
2000
2005.07
 /FONT>
42
Qinghai Huadian Datong Power Plant
2×300
DTII(A)
1200-1400
2105
2005.08
 
43
Shanxi Yonghao Gangue Power Plant
2×50
DTII
800
980
2005.10
 /FONT>
44
Wuhai Haishen Thermal Power Plant
2 X 150 /FONT>
DTII
1200
1495
2005.09
 /FONT>
45
Huadian Baotou Hexi Power Plant
2×600
DTII
1400-1800
2300
2005.8
 
46
xiangtan Power Plant 3rd phase
2×600
DTII
1400-1600
3310
2005.10
 
47
Jiangxi Fengcheng Power Plant
2×600
DTII
1400
2180
2005.10
 
48
Guotou Qinzhou Power Plant
2×600
DTII
1400-1600
3376
2005.12
 
49
Guodian Changyuan Jinmen Power Plant
2×600
DTII
1200-1400
2618
2006.02
 /FONT>
50
Chongqing Hezhou Power Co., Ltd.
2×300
DTII
1200
1831
2006.3
 
51
Chongqing Wansheng Power Plant
1×300
DTII
1000~1200
1794
2006.4
 
52
Faer Electric Power Station
4×600
, DTII
1400~1600
3741
2006.9
 
53
Sichuan Guangan Power Station (3rd phase)
2×600
DTII
1200~1400
2951
2006.4
 
54
Guangxi Fangcheng Port Power Plant
2×600
DTII
1400-1600
3750
2006.10
 
55
Guodian Yongfu Power Co., Ltd.
2×300
DTII
1000-1200
1400
2006.02
 
56
<, FONT face=Arial>China huadian engineering group Co., LTD
 
DTII
1800-2000
14373
2006.05
 
57
Datang Luohe Power Plant
2×600
DTII
650~1200
2950
2006.11
 
58
Anhui Huadian Suzhou Power Plant
2×600
DTII
1200
2245
2006.06
 
59
Xinzhou Guangyu Coal & Electricity Co., Ltd
2×135
DTII
800~1000
950
2006.06
 
60
Guodian Hebei Longshan Power Plant
2×600
DTII
1400
2895
2006.03
 /FONT>
61
Hubei Huadian Xiangfan Power Plant
2×600
DTII
1600
2470
2006.01
 /FONT>
62
Yangcheng Power Plant 3nd phase
2×600
DTII
1200-1400
1393
2006.04
 /FONT>
63
Tianjin Chenta, ng Th, , ermal Power Plant
2 X 300 /FONT>
DTII
1000-1400
2360
2007.03
 /FONT>
64
Xuzhou Huaxin Power Plant
2×300
DTII
1400
3100
2004.7 /FONT>
 /FONT>
65
Jiangsu Yancheng Power Plant
2×135
DTII
1200
240
2004.9 /FONT>
 /FONT>
66
Jiangsu Zhenjiang Power Plant
2×600
DTII
1400-1800
3350
2004.6 /FONT>
 /FONT>
67
Fujian Nanpu Power Plant
2×300
DTII
1400
4000
2004.10 /FONT>
 /FONT>
68
Fujian Jiangyin Power Plant
2×600
DTII
1400-1800
3250
2006.6 /FONT>
 /FONT>
69
Fujian Kemen Power Plant
2×600
DTII
1400
2650
2005.11 /FONT>
 /FONT>
70
Datang Wushashan Power Plant
4×600
DTII
1800
2221
2005.4 /FONT>
 /FONT>
71
Shandong Huangdao Power Plant
2×660
DTII
1400
1326
2005.10
 /FONT>
72
Fujian Songyu Power Plant
2×300
DTII
1200
340
2005.04 /FONT>
 /FONT>
73
Shandong Heze Power Plant
2×300 /FONT>
DTII
1400
2112
2005.12
 /FONT>
74
Xiamen Ruixin Power Plant
2×46 /FONT>
DTII
650
1700
2005.10 /FONT>
 /FONT>
75
Zhejiang Fengtai Power Plant
2×600 /FONT>
DTII
1400
2249
2007.4 /FONT>
 /FONT>
76
CWHEC
 /FONT>
TD75 /FONT>
500 -1000 /FONT>
1070 /FONT>
2005.6
 /FONT>
77
Jinzhushan Power Station
2×600 /FONT>
DTII
1200-1400
2600
2005.10
 
78
Zhejiang Zheneng Leqing Power Plant
4×600 /FONT>
DTIIA
1400-1600
6452
2007.5
 
79
Guodian Feicheng Shiheng Power Plant
2*300
DTIIA
1000-1200
879
2006.12
 
80
Chuangyuan Power Plant
2*300
DTII
1200
2000
2006.12
 
81
Inner Mongolia Tuoketuo Power Plant
2*300
DTII
1200
1812
2007.4
 
82
Yiyang Power Plant 2nd phase
2×600 /FONT>
DTII
1400
2500
2007.5
 
83
Guotou Xuancheng Power Plant
1*600
DTII
1600
1050
2007.8
 
84
Fujian Huadian Kemen Power Plant
2*600
DTII
1400
324
2007.6
 
85
Datang Duolun Power Plant
2*600
DTII
1600
2750
2007.9.
 
86
Hunan Huarun Lianyuan Power Plant
2*300
DTII
1000
1800
2007.10
 
87
Tonglin Guodian Power Plant
2*600
DTII
1600
1350
2007.12.31
 
88
Nanjing Chemical Thermal Power Plant
2*300
DTII
1000-1200
2900
2008.1
 
89
Datang Baqiao Thermal Power Plant
2*300
DTII
800-1400
1119
2008.2
 
90
Hefei Power Plant
1*600
DTII
1600
2015
2008.2.29
 
91
Gansu Chongxin Power Plant
2X660
DTIIA
1600
 
2008
 
92
Datang Weihe Power Plant
2*300
DTII
1000-1200
1650
2008.3
 
93
Huadian Tuyou Power Plant
2*600
DTII(A)
1200-1600
2890
2008.7
 
94
Guodian Changyuan Jinzhou Thermal Power Plant
2*300
DTII
1600
2618
2008.7.1
 
95
Hubei Ezhou Power Plant 2nd phase
2*600
DTII
1600
1550
2008.8.30
 
96
Inner Mongolia
2*600
DTII
1400
2500
2008.8
 
97
China National Technical IMP & EXP Corporation
1*600
DTII
650-1800
2993.4
2009.4.30
 
98
Shandong Huadian Electric Power Material Co., Ltd.(Zibo)
 
DTII
1200
159.116
2008.3.20
 
99
Shandong Huadian Electric Power Material Co., Ltd.(Weifang)
 
DTII
800
18
2008.5.20
 
100
Jiangsu Nanjing Thermoelectricity Power Co., Ltd.
2*600
DTII
1200-1600
1625
2008.12.
 
101
Guangzhou Zhujiang Electric Power Fuel Co., Ltd.
2*300
DTII
1200
574
2008
 
102
Liaoning Jingzhou Power Station (Datang International Power Genration Co., Ltd.)
2*300
DTII
1400
2300
2008
 
103
Anhui Xuancheng Power Plant
2*300
DTII
1400-1800
2732.8
2008
 
104
Hefei  Power Plan
4*300
DTII
1200-1400
2202.9
2008
 
105
Anhui Jinyuan Power Plant
2*300
DTII
1000
450
2008
 
106
Fushan Nanhai Jingneng Power Co., Ltd.
2*300
DTII
1400
3275
2009
 
107
Fujian Huadian Zhangping Power Plant
2*300
DTII
1000
2417
2010.2
 
108
Baicheng Power Plant
2*600
DTII
1400
 
2009.6
 
109
Baicheng Power Plant
2*300
DTII
1200
 
2009.6
 
110
Huaneng Yueyang Power Plant 3rd phase
2*600
DTII
1400
2795
2009.12
 
111
Guodian Baoqing Power Co, Ltd.
2*1000
DTII
1400-1600
4313
2009.12
 
112
Guangdong Power Project
2*150
DTII(A)
800-1200
1282
2009.12
 
113
Huarun Electriicty Hubei Co., Ltd.
2*1000
DTII
1400-1600
3545
2010.4-12
 
114
Huadian Fujian Yongan Power Co., Ltd.
2*300
DTII
800-1000
1949
2010.3-5
 
115
Guodian Quanzhou Power Co., Ltd. (Nanpu Power Plant 2nd phase)
2*600
DTII
1400
2822
2010.3-6
 
116
Huadian Laizhou Power Plant
2*1000
DTII
1400-1600
2395
2010.5
 
 
 
End User Statements
 
4. Financial Data
                  Unit: million USdollar

Item
2007
2008
2009
Average
1.    Total Assets
 
20.94
20.62
20.62
 
2.    Turnover
 
67.08
70.77
94.98
 
3.    Current Assets
 
13.22
13.22
13.22
 
4.    Total Liabilities
 
11.54
10.30
10.30
 
5.    Current Liabilities
 
9.26
8.03
8.03
 
6.    Net Worth (1-4)
 
9.40
10.32
10.32
 
7.    Working Capital (3-5)
 
13.22
13.22
13.22
 

 
 
 
 
 


.Human Resource and Equipments
1.Information on Human Resources

No.
Items
Number
Remarks
1
Management
11
member of board
2
Technical Experts
 
Senior
12
 
Medium
230
 
Primary
46
 
3
Workers & Others
1133
 
4
Staff In Total
1432
 

 
2.Information on Equipments
 
NO.
Name of Equipments
 
Model
 
Quantity
 
 
 
1、cold work equipments
International standard product certificate is adopted
 
 
1
 
pretreatment of steel
H=2.2m     2.5m2/min
1
 
2
 
Quator rollor bending machine
W12-20×2500
1
 
3
Quator rollor bending machine
W12-32×5000
1
 
4
Hydraulical bending machine
Q12Y-32×4000
1
 
5
Hydraulical bending machine
Q12Y-32×5000
1
 
6
Large-scale joint shearing machines
 
1
 
7
Steel shapes straightening machine
250T
1
 
 
2、Pressure processing equipment
 
 
 
8
Horiz, ontal hydraulic, press
<, D, align="center" IV>500T
1
 
9
Vertical hydraulic press
250T
1
 
10
Roller pressure installed
 
4
 
11
punch
5~250T
12
 
 
3、welding equipments
 
 
 
12
CO2 Automatic protection welding machine
 
5
 
13
CO2 double- headed automatic protection welding machine
NZC3-3   350
2
 
14
submerged arc welding machine
 
2
 
15
NC flame cutting machine
 
1
 
 
4.Machinery Processing equipments
 
 
 
16
vertical lathe
φ2500
1
 
17
heavy lathe
CQ61160   φ1600×5000
1
 
 
18
 
Heavy cylindrical grinder
MQ1380    B×500
1
 
19
planer type milling machine
X2012C
1
 
20
Normal lathe
CW6142~100
35
 
21
pipe cuting machine
Q1125A   φ254
2
 
22
 
Center hole drilling machine
Z8210A-1500
1
 
23
 
Display horizontal boring
TX6112A
2
 
24
gear-hobbing machine
YN31125
1
 
25
gear-hobbing machine
Y320   M20×2000
1
 
26
Gear-grinding machine
ZSTZ500型西德NILES公司
1
 
27
Gear-grinding machine
ZSTZ1000型西德NILES公司
1
 
28
Gear-grinding machine
ZSTZ1250型西德NILES公司
1
 
 
5、Hoisting equipments
 
 
 
29
twin beam overhead crane
30T
2
 
30
twin beam overhead crane
15T
1
 
31
Single beam overhead crane
5T
10
 
32
Truck crane
Q5113
1
 
33
Folk lift
5T
2
 
34
rubber hydraulic crane
16T
1
 
 
6、Thermal treatment equipments
 
 
 
35
chamber type electric furnace
75KW
2
 
36
annealing furnace
40T
1
 
37
Well-type carburizing furnace
φ1200×5000
1
 
 
38
Well-type carburizing furnace
φ1200×5000
1
 
 
 
7、Casting equipments
 
 
 
 
39
Casting center
 
1
 
 
 
8、Test device
 
 
 
 
40
reducer loading test board
 
1
 
 
41
X ray crack detective device
 
1
 
 
42
Idler performance test machine
 
6
 
 
43
Belt conveyor comprehensive performance test board
 
1
 


 View of factory and main equipments
 overview                    office building
gate of factory   
pretreatment of steel
500T oil press



2m  gear-hobbing machine            NILES gear-grinding machine

reducer testing board              boring machine

           
 site view

Long distance belt conveyor for Lafarge


(B=1800mm)               

Huanghua Port Coal Handling system
(B=2200mm)
Huanghua Port Coal Handling system

 
Shenzhen Mawan Power Plant
(5.13km)
Fujian Sande Co. 
Zhumadian Cement Co., Ltd.
 long distance belt conveyor for Fuzhou Taini Cement Co.

 (2×600MW) Guodian Datong Power Plant 2nd phase
  Guodian Jiangyin Power Plant
 
 Guodian Nanpu Power Plant

 
Contact:
yangchunlin
        
 
Belt Sample quotation:
1350mm x EP750 / 5Ply x 5 x 1.5 Fire resistant  Length : 630 meter    USD100/M (FOB Tianjin)
the Max width of belt we can produce is 2000mm, the Max length is unlimited but we advice less than 200-250m convenient for transport or delivery.
Delivery: two to three week after contract.
Technical specification
EP conveyor composed of multi polyester canvas layers (or with polyester toward longitudinal and polyurethanes for latitude), with high intensity top and bottom coating,
applying in granular, powdery material, and suitable for middle-long distance transmission.

EP conveyor belt has the same merit as Nylon conveyor belt, also with tensibility and keep high intensity in humidity condition, which would be very helpful for transferring the washy material or working on wet condition. Our EP conveyor belt products has five types according to coating difference: Anti-split type, Anti-abrasion type, common type, acid-alkali resistant type and heat-resistant type.
Type No.:NN80, EP100, EP125, EP150, EP200,EP250,EP300,EP400
 Belt    Layers    Coating thickness    Coating thickness  
 width      Top coating    Bottom coating  
 400    3~4    4.5 3.0    3.0 1.5  
 500    3~6    4.5 3.0    3.0 1.5  
 600    3~5    6.0 4.5    3.0 1.5  
 650    3~5    6.0 4.5 3.0    3.0 1.5  
 800    3~6    6.0 4.5 3.0    4.5 3.0 1.5  
 1000    3~7    6.0 4.5 3.0    4.5 3.0 1.5  
 1200    4~7    6.0 4.5    4.5 3.0 1.5  
 1400    4~7    6.0 4.5    4.5 3.0  
 1600    4~7    6.0 4.5    4.5 3.0  
 1800    5~7    6.0 4.5    4.5 3.0  
 2000    5~7    6.0 4.5    4.5 3.0  
Nylon conveyor longitudinal pulling intensity: N/mm
315 400 500 600 630 800 900 1000

Coating physical performance:
Coating rank   Code   Stretch intensity MPa   Intensity to rupture MPa   Abrasion rate mm3    After 70°C*7days aging, changing rate for stretch intensity  
 Anti-split    H    >24.0    >450    120<    -25~+25  
 Anti-abrasion    D    >18.0    >400    100<    -25~+25  
 Common    L    >15.0    >350    200<    -25~+25  
Agglutinating intensity between layers:

 

 

 

 

 


 

 

- China Top Mining Machine For grinding mill, jaw fine crusher, sand making machine hammer crusher 3/6 2013
- Belt Convey Equipment quotation 11/5 2012

Total 1 pages 2 items, Now at 1 page. First. Last. Next End


Statement: Any reference to the OEM, part number or other OEM, information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]