BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       Hyundai 5.5mw to 9.3mw Gas Engine Generator Sets  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > geothermal power plant


 

 China Geothermal Power Plant Contractor

(if you want read the whole article, click here, or go on page by page)

We are a Chinese leading geothermal power plant EPC contractor, main contractor or turnkey contractor from China. We have expertise in the design and manufacturing of the geothermal power plant, which is feathered with lower temperature and pressure of steam. NCG and silcan should be taken into consideration while design and manufacturing the critical equipments.

Here are typical description of main equipments designed and provided by us for a 2x6MW geothermal power plant, which is under construction in Indonesia.

1 Introduction

1.1 General

1.1.1 According to the requirements from user, this proposal specification covers works and services by China National Electric Wire & Cable Imp./Exp. Corp. (CCC) for Indonesia 2X6MW Geothermal Power Plant .

CCC will furnish Two(2) sets of 6 MW steam turbine generator including auxiliary equipment as well as utility equipment. We also offer the design, and technical service for of civil facilities, installation, commissioning whole plant.

After completion of the project, the power plant can generate electricity capacity with 2X6MW, Besides, the output--voltage of power plant is 20 kv, 50 Hz.

1.1.2. The main technical parameters of the major equipment

1.1.2.1 Steam Turbine 2 sets

-Rated capacity 6.8 MW

-Inlet steam

------pressure 8.6 bar

------temperature 171.9  degree

------Rated steam flow 56.7t/h

1.1.2.2 Turbo-generator 2 sets

-Rated capacity 6.8MW

-Rated voltage 6.3 KV

-Power factor 0.8(lagging)

-Frequency 50HZ

1.1.3 Main economic index of power plant

-Capacity of power plant 2X6.8 MW

-Rate for plant service power 10%

-Net output for power plant 2X6 MW

-Annual operation hours >=7884 h

-Heat rate 8590 kJ/kW.h

-Operation lifetime 30 years

1.1.4 The Project will consist of major equipment:

- Two turbine-generator and condenser

- Condensate system

- Water and wastewater treatment plant

- Main control room

- Control and instrumentation equipment

- Fire protection and detection system

- Ventilation and air conditioning system

- All requires piping and valves

- 20kV Substation and terminal substation

- Main and Auxiliary Transformers

- All civil, erection and installation works required for the above supplies

- Other system as necessarily required

1.2 Power plant outline

The Power Plant shall be located Within the Owner's Site. 

The turbine and equipment will be located in turbine building. The buildings will consist of turbine generator, main control room, electronic room, and auxiliary equipment.



Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
ycl1227@163.com
ycl1227@vip.163.com