Power Generation
    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation - Technical Documents 1x200 MW COAL FIRED POWER PLANT-general


 

Technical Documents 1x200 MW COAL FIRED POWER PLANT-general

1                    GENERAL

1.1             Project Description

The proposed 1x200 MW COAL FIRED POWER PLANT is to be designed and built to install 1 x 200 MW units in the first phase by the Project Owner. The Plant site is located xxxxxx South America. The Contractor will furnish one (1) sets coal fired boiler and one (1) sets of 200 MW steam turbine generator including auxiliary equipment as well as utility equipment. The scope of the contractor will comprise design, engineering, manufacture, inspection and testing at contractor’s work(s) and/or his sub-contractor’s work(s), packing, transportation and delivery to site, including unloading from carriers at site, handling and storage at site, intra site transport, erection, supervision, testing, commissioning and carrying out performance and guarantee tests at site of the plant/equipment, in accordance with the specification requirements, conditions, as specified. The Plant shall be brand new, and operating life will be at least 30 years from the Commercial Operation Date.

1.2             Outline of Work

The proposed Coal-Fired Power Plant will comprise one unit of 200MW output units with the necessary auxiliary and ancillary supporting equipment and systems. The unit will consist of a coal-fired boiler and a turbine generator with common coal & ash handling facilities arranged to operate from a control room.
Coal will be brought in from near mine by trucks to the plant’s coal handling system.
The proposed power plant is to connect to the 110kV substation.
The Plant will include:
¨             Pulverised coal fired boiler, condensing steam turbine generator complete with all auxiliaries;
¨             FGD�?flue gas desulphurization system;
¨             Coal yard for 60 days and conveying, handling and storage bunkers;
¨             Ash handling system including ash conditioning and transfer system to disposal pond for six months;
¨             Light fuel oil system for boiler start-up;
¨             Power and auxiliary transformers;
¨             Electrical distribution systems;
¨             Emergency diesel generator;
¨             Control and instrumentation system configured to enable operation from a common location;
¨             110kV substation to cater for the unit & one outgoing transmission lines;
¨             A secondary circulating water supply system with mechanical draft cooling towers;
¨             Raw water and water treatment systems.
In addition, the Plant will be built with the necessary infrastructure facilities to provide a fully functioning installation, including:
¨             Foundations for plant and buildings,
¨             Civil and structural works necessary for the plant installations,
¨             Buildings complete with services,
¨             Lifting facilities and cranes,
¨             Internal roads and car park areas,
¨             Station outdoor and perimeter and switchyard lighting,
¨             Site perimeter security fencing & security systems
¨             Internal communication systems
¨             Fire detection and protection systems
¨             Administration, workshop and stores buildings.
The terminal points for the equipment and system supply will be as follows:
¨             Coal transfer system
At the point of unloading hopper located in the first transfer tower in the power plant. Coal is supplied by the convey belts to the site from coal storage yard in the near coal mine which will be constructed by another Contractor.
¨             LDO
At the inlet of LDO unloading pump.
¨             Electrical connections
At export gantry of the 110 kV switchyard inside the power plant.
¨             Power for start-up
At the 110kV busbar.
¨             Fly and bottom ash
At the outlet of fly and bottom ash silos located in the power plant. The ash pond will be considered after confirming the information of the site.
¨             Liquid effluent
At the outlet flange of guard pond.
¨             Storm water drain
At the outlet of one meter apart from the boundary of power plant to nearest storm water drain.
¨             Road
All internal roads in the power plant and around 100m length of approach road.

1.3 Design Conditions

1.3.1  Fuel
1.3.1.1  Coal
The primary fuel for this project is coal, to be delivered by belts. Basic data of the coal characteristics being considered are given as follows according to the specification:

Item
Unit
Typical coal
Check coal
Ultimate analysis
 
 
 
Car
�?/DIV>
51.65
44.51
Har
�?/DIV>
3.36
2.95
Oar
�?/DIV>
13.97
9.19
Nar
�?/DIV>
1.11
1.57
Sar
�?/DIV>
1.23
3.50
Clar
�?/DIV>
0.0398
0.02
Proximate analysis
 
 
 
Mar
�?/DIV>
20
20.41
Mad
�?/DIV>
10
10
Aar
�?/DIV>
8.64
17.85
Qgv,ar
kJ/kg
20209
17910
Qnet,ar
kJ/kg
18948
16730

 

ASH COMPOSITION
 
 
 
 
% WEIGHT
MINIMUM
TYPICAL
MAXIMUM
SiO2
7.07
27.68
76.20
Al2O3
6.61
17.12
33.07
TiO2
0.47
7.55
58.48
Fe2O3
0.51
14.54
30.50
CaO
0.12
6.71
22.76
MgO
0.55
6.24
15.95
Na2O
0.19
1.59
9.32
K2O
0.21
0.70
1.54
P2O5
0.02
0.27
1.60
SO3
0.67
12.31
33.50
undetermine
0.09
5.26
17.37
 
 
 
 
 
 
 
 
ASH FUSION TEMPERATURE
 
 
 
 
 
MINIMUM
TYPICAL
MAXIMUM
Reduction Atmosphere
1024
1198
1540
1077
1233
1550
1094
1264
1550
1130
1300
1550
Oxidizing Atmosphere
994
1183
1362
1060
1230
1508
1070
1271
1573
1090
1330
1573
Foiling index
Severe
Slagging Index
Middle/High

 
1.3.1.2  Light Fuel Oil / Diesel
Light fuel oil information is not provided in the specification. The light fuel oil is assumed to be used as ignition and fire supporting fuel, to be delivered by road tanker. The fuel oil handling system and equipment will be based on the following fuel analysis:
No.
Component
Unit
Value
1
Specified gravity 15/15°C
kg/m3
830~870
2
Viscosity at 20 °C
cst
3~8
3
Pour point
°C
�?
4
Flash point
°C
�?5
5
Sulphur Content
%
�?.2
6
Ash content
%
�?.01
7
Low Heating Value
MJ/kg
42
1.3.2       Design Assumed Issues
It’s not clear about many constructive conditions at this time; the proposal is based on the assumption below technical issues for scheme design on this stage:
¨             Scale of project is capacity of 1 x 200MW, but considering the extension of this power plant for another two same units, the public system will be considered only suitable for 1 x 200MW.
¨             The site grading of proposed power plant is leveling, while land reclamation and clearing are not included in this proposal.
¨             Natural foundation will be used, while piling is not included in this proposal. We will supplement these parts when we acquire the detail of site situation.
¨             The ash lagoon and outside transportation piping and/or road are not included in this proposal. The proposal ash yard is beside the boundary of power plant. So at this stage we suggest that the fly ash will be transferred pneumatically to the ash silo arranged in the ash yard, the bottom ash will be transferred to the silo arranged near the boiler, and then they will be taken to the ash yard by trucks.
¨             As site is near the river, we use river water as the water source of service and potable water system.

1.3.3 Standards and Codes

All works, equipment, materials and systems will be designed, manufactured and/or constructed in accordance with the latest issue of the Chinese or equivalent internationally accepted codes and standards.
Additionally the local standards of environmental, health and safe, and etc. for power plant construction applied in Colombia must be followed.
The International System of Units (SI), including the "Metre" system, will be used in connection with the plant design. All materials, fittings, components, items of the plant and equipment supplied for incorporation in the Works will be standardized accordingly.
SI units will be used in all correspondence, documentation, calculations, drawings, measurements etc. If reference has to be made to non-standard items, tile SI units will be quoted followed by the non-standard units in brackets.
 