BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > geothermal power plant > Cooling System


Google

 5. COOLING SYSTEM

5.1 General

The cooling system consists of the following systems:

- Steam condenser system

- Air cooler system

- Oil cooler system

- Others

Basic design information for circulating cooling water

Circulating cooling water volume:  !--mstheme-->

Q=3960 m3/h, including

 !--mstheme-->

Condenser

3700 m3/h

Air cooler

140 m3/h

Oil cooler

80 m3/h

Others

40 m3/h

5.2 COOLING WATER SYSTEM

5.2.1 Main design information

Water circulation system is used for cooling the condenser of steam turbine and air cooler & oil cooler of power station. After heat exchanging with the equipments, temperature of cooling water rises about 17�? The hot water will be sent back to cooling tower by hot water pump. After exchanged with air in the tower, the hot water is cooled down to 30�?and then flown to the cooling water basin then flows to the condenser by gravity. There is about 2-3% of the water will be lost during the operation and it will be maker up by cleaning geothermal water piping in the mill.

One side filtrater is set in this system, so a portion of the circulation water can be filtrated, in this case the water quality can be reached. A portion of cooled water will be re-flooding into the ground through a combination seal well and spreader channel. 

The cooling water constant quality shall be maintained by means of chemical treatment defined by pH control and microbiological control. Chemical treatment of the cooling water shall be applied to achieve two specific objectives:

--to maintain the pH of the cooling water to an optimum value of between 5 and 6.5

--to prevent biological fouling of the cooling tower 

5.2.2 Equipment selection and structures

The cooling tower is of a mechanical forced draft counter-flow type. The material of tower structure is FRP (Fiber Reinforced Plastic) in stead of wood usually applied. In case of FRP structure, fire fighting system is not required and skilled carpenters are not required. 

The circulating water requires bypass filtering treatment for removal of impurities and sludge generated during circulation. Operation and backwash of the valveless filter is fully automatic. 

The hot water pump will be two groups, one group has 3 pumps (1 standby), pump model Q=1000 m3/h, H=20 m. The pump will take water from the catchment tank of condenser, and transfer to the cooling tower. 

The NaOH liquor will be added into the system to adjust the PH of water, the device includes a solution tank and two chemical pumps. The volume of tank is 10m3, the model of pump is: Q=4-40l/h, H=20 m

5.2.3 Location of Cooling Tower

The cooling water tower shall be located so that prevailing winds will not blow towards the power plant buildings as the mist and vapors may be corrosive and obnoxious, and humid air circulation, which would reduce tower performance, shall be avoided.



Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]