BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > 600mw ultra super critical power plant


Google

1  General

The project will include two 600MW supercritical coal fired units.
The newly-built power house (main power building) will be of proven and prevail four-array type arrangement, covering Turbine Hall, Deaerator Bay, Bunker Bay and Boiler area in series. The mode and major size of proposed power house taking reference from several existing international and Chinese domestic power stations with 600MW class unit which have already been demonstrated successfully by actual reliable operation and rich experiences.
 
2      Boiler  
The boiler proposed is supercritical pressure, single reheat, once-through, balanced draft boiler, designed for firing specified pulverized coal as the main fuel. Its capacity and steam parameters are carefully matched with those of steam turbine generator set.
The boiler is be designed for SH/RH outlet conditions of 571�?569�?and capable of meeting the guaranteed performance.
The boiler BMCR capacity is 1947.86t/h and can able to operate a turbo-generator set of 600MW, complete with superheater, reheater, economizer, air heaters, two forced draft fans, two induced draft fans, two primary air fans and six(6) middle speed mills will be provided.
One Twin Flue Chimney will be provided for two boilers.
Supporting steel structure, soot blowing units, platform, galleries and stair ways and all boiler internal steam, vent and drains piping, blow down/drain vessels, valves, fittings, fuel gas ducts and air ducts, dampers, lagging and refractory, casing, foundation bolts, boiler elevator etc.
The furnace dimensions are designed to provide appropriate volume and plan area, especially considering the properties of design coal.
Light Diesel Oil (LDO) will be used for boiler startup and combustion supporting.
The tentative coal analysis is as follows:

Item
Unit
Design coal quality
Check coal quality
Qnet,ar
kJ/g
22800
20900
Mt
%
8.5
7.6
Mad
%
2.75
2.58
Vdaf
%
39.12
33.02
Aar
%
18.74
27.16
Car
%
59.34
49.35
Har
%
3.75
3.2
Oar
%
8.24
11.01
Nar
%
0.85
0.9
St,ar
%
0.58
0.78
HGI
 
68
54
DT
�?/FONT>
1392
>1500
ST
�?/FONT>
1402
>1500
FT
�?/FONT>
1440
>1500
Ash analysis
SiO2
%
50.88
52.62
Al2O3
%
28.73
32.62
Fe2O3
%
2.91
4.44
CaO
%
6.87
3.56
MgO
%
0.64
0.58
Na2O
%
0.33
0.48
K2O
%
0.69
0.84
TiO2
%
0.96
0.54
SO3
%
2.38
2.18
MnO2
%
0.01
-

 
Six middle speed mills per boiler shall be provided based on the coal analysis specified. The total capacity of five coal mills shall be capable of carrying 100% BMCR generation load.
Dry electrostatic precipitators shall be provided on flue gas path between the air heaters and ID fans of a design proven on existing plants operating with similar fuels. The primary function of the particulate extraction plant is to control dust emissions both to the atmosphere.
Two PAF, FAF, IDF will be sized based on the coal analysis and boiler requirement, each fan can meet the requirement of 60%BMCR when one set of fans is out of service.

3    Turbine

Type                                               Super-critical tandem compound three cylinders
four exhaust reheat condensing turbine
Main Steam Pressure:                  24.2MPa
at main stop valves  
Main Steam Temperature:              566�?/FONT>
at main stop valves  
Reheat Steam Temperature:       566�?/FONT>
at combined reheat valves
Design Exhaust Pressure:             10.13KPa
Steam Turbines have basic design philosophy summarized as follows.
High reliability with detailed design consideration
High efficiency based on advanced fluid dynamic technology
Simple and quick starting based on impulse design
Control system of good stability and high sensitivity
The condenser will be designed in the form of single shell, divided water boxes, single-pass in circulating water side and installed in transversal arrangement. The condenser mainly consists of neck, shell, water box, exhaust expansion joint and so on.
Oxygen in condensate at condenser outlet over the entire load range from zero to Valve Wide Open operating conditions will be controlled at the desired level.
The deaerator will be used to remove dissolved oxygen and other non-condensable gases such as oxygen, carbon dioxide, etc from feedwater by using steam in direct contact with feedwater, heating the feed water to saturation temperature at the deaerator operating pressure so as to raise the thermal efficiency of the unit. The storage tank can store a definite amount of saturated water at deaerator pressure and conform to the standard of oxygen content to meet the needs of the boiler and guarantee its safe operation.
For each turbine-generator set, two 50% duty turbine-driven boiler feed water pumps and one 30% duty motor-driven boiler startup feed water pump will be furnished.
Two-stages (HP&LP) turbine by-pass system will be furnished to reduce temperature mismatch on start-up of the turbine and protect the reheater from damage.
4      Electrical system
The generators proposed for the plant are of three phase, horizontal mounted, two-pole cylindrical rotor type, with the rated power of 600MW, power factor of 0.9 lagging, terminal voltage of 22kV, frequency of 60Hz. The turbine generator adopts the typical water-hydrogen-hydrogen cooling system.
The excitation system offered is of static type. Excitation transformer and static rectifier would be assembly. Excitation transformers is tapped off from the generator busduct to supply the excitation current AC for the excitation system.
Each turbo generator unit would be connected by the isolated phase busduct to its own step-up transformer for feeding power to switchyard.
Station transformer will drawn power used for startup from switchyard.
 
5    Control and instrumentation
        Centralized control has been considered for the boiler, turbine generator and auxiliary systems of the unit. One Centralized control Room (CCR) shall be furnished for two units. Monitoring and Control for units shall be realized in CCR. The following functions can be achieved:
a.      start/stop units in CCR
b.      Monitoring and adjusting of normal condition in CCR.
c.      Treating with abnormal condition and urgency accident.
d.      Patrolling periodically on site
Automation systems of power plant  shall be composed of Distributed Control System(DCS) and control system of auxiliaries plants. Design principle of control function decentralization and information centralized management will be adopted.
        The entire unit operation and monitoring shall be possible through  color /LCD monitors, at the same time, back-up panel shall be setup, there will be some necessary monitoring equipment, for example ,main parameter large digital displaying meters、industry TV、Hardwired window annunciator i.e. There will be fire alarm panel in CCR.
Programmable logic controller(PLC) add MMI control mode will be used for water, ash and coal control point, other auxiliary workshop will be designed as unmanned mode. Water, coal and ash control points can be connected by auxiliary control network, and operator can supervise the process through LCD operator workstation. The centralized supervision of auxiliary control system will also be realized in CCR.
6    Ash handling
        The Ash Handling System (AHS) for each unit shall be designed to collect, transport, dispose of bottom ash, coarse ash, and fly ash and collection of pulverizer reject solid and transporting it to the silo bins for the units.  
       Mill rejects will be collected and transported by battery operated trolley then transported to ash dump area by truck. Bottom ash will be transported to silos by SCC, fly ash will be conveyed to silos by dense pneumatic positive conveying system, bottom ash and fly ash will be transported to ash dump area by truck.
7  Coal handling
There is a crusher house in coal handling system. Two (2) screens and two (2) ring-type crusher are installed in each crusher house. The rated capacity of screen is 1500t/h.
The CHP facility shall have two (2) coal streams, one (1) operating + one(1) as standby. The rated conveyor capacity for conveyors is 1500 t/h.
All conveyor belting is of the fire resistant plied construction type.
When one of the boiler silos send bin low level signal, the coal handling system start work and fill it in until it send bin high level signal.
The coal handling system is controlled by PLC. The interlock is installed between primary equipments.
The type of coal unloading equipment and coal stockpile will be determined based on the site condition.
 
8    Water treatment
The process of boiler make-up water treatment system will be determined after got the water analysis.
Control way for DM water plant is program controller.
The middle pressure condensate polishing system will be furnished and it includes two (2) set 50% pre-filter + three (3) set 50% capacity high flow rate mixed beds. Two sets beds are operating as the third is stand-by.
 

9     Environmental Protection

In order to reduce the emission of air pollutants and prevent the fuel gas emitted by the boiler from polluting the environment, the following measures will be taken in design phase:
·       Adopt ESP to reduce emission of smoke-dust and keep its density to meet the emission standard;
·       Adopt low-nitrogen combustion technology on the boiler to reduce the NOX emission generation;
·       Emit the fuel gas from boiler through higher chimney to increase the ability of gas to dilute and diffuse.
It is required that the noise level of the main equipment and auxiliary not to exceed the level permitted by relevant standards. Certain equipment will be equipped with noise reducing device and noise insulating device.
The overall layout of the pant will be determined so that the layout is reasonable and the noise source is centrally arranged and far away from residential area as possible.
 
10   Ancillary facilities
Station Air and Instrument Air System,        Start-up Boiler, Fuel oil handing system       , Hydrogen generation system etc. will also be provided as necessary to meet the operation requirement.

 



Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]