Form of Equipments Cost Breakdown |
|
|
|
|
|
|
|
NO |
Items of 2x150t/h+1x75MW Fibre&Coal Fired Power Plant |
QTY |
FOB Price in US$ |
I & F Price in US$ |
CIF Price in US$ |
Remarks |
A |
ENGINEERING DESIGN |
|
$214.50 |
$165.00 |
|
|
B |
MAIN EQUIPMENT (MECH. ELECTRICAL & CONTROL) |
|
|
|
|
|
1 |
Combustion System |
|
|
|
|
|
1.1 |
130t/h CFB Steam Boiler |
2 |
$1,118.00 |
|
|
|
1.2 |
Boiler's Auxiliary System |
2 |
$156.00 |
|
|
|
1.3 |
Dust Palletizing System |
2 |
$150.80 |
|
|
|
1.4 |
Thermal Insulation |
|
$71.50 |
|
|
|
1.5 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$36.40 |
|
|
|
2 |
Thermodynamic System |
|
$0.00 |
|
|
|
2.1 |
Steam Turbine |
1 |
$858.00 |
|
|
|
2.2 |
Other Auxiliaries |
|
$24.05 |
|
|
|
2.3 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$20.15 |
|
|
|
3 |
Generator & Electrical System |
|
$0.00 |
|
|
|
3.1 |
Generator & Auxiliaries |
1 |
$286.00 |
|
|
|
3.2 |
132/10.5kVPower Transformer |
2 |
$114.40 |
|
|
|
3.3 |
10.5/0.4kVPower Transformer |
6 |
$27.30 |
|
|
|
3.4 |
10.5 kV Switchgear Equipment |
38 |
$59.28 |
|
|
|
3.5 |
132 kV Switchgear Equipment |
4 |
$72.80 |
|
|
|
3.6 |
400 Volt PDB |
60 |
$39.00 |
|
|
|
3.7 |
Prospecting System and Metering System |
1 |
$117.00 |
|
|
|
3.8 |
UPS, Battery Charger and DC Distribution Panel |
1 |
$5.72 |
|
|
|
3.9 |
Cable and Related Materials |
|
$224.90 |
|
|
|
3.10 |
Blackstart and Emergency Generator |
|
$27.30 |
|
|
|
4 |
Measuring & Control System |
|
$358.80 |
|
|
|
5 |
Common Auxiliary System |
|
$0.00 |
|
|
|
5.1 |
Fuel Handling system |
|
$143.00 |
|
|
|
5.2 |
Ash & Slag Removing System |
|
$58.50 |
|
|
|
5.3 |
Cooling Water System |
|
$344.50 |
|
|
|
5.4 |
Chemical Water Treatment System |
|
$0.00 |
|
|
|
|
5.4.1 The Raw Water Pre Treatment System |
|
$33.80 |
|
|
|
|
5.4.2 Demin Water System (R/O System) |
|
$143.00 |
|
|
|
5.5 |
Crane & Hoist |
|
$43.55 |
|
|
|
6 |
Mandatory Spare Parts for 1 Year operation |
|
$76.70 |
|
|
|
7 |
Recommended Spare Parts for 5 (five) years operation |
|
$140.40 |
|
|
|
8 |
Training |
|
$109.20 |
|
|
|
9 |
Commissioning and its required equipments |
|
$201.50 |
|
|
|
|
TOTAL COST |
|
$5,276.05 |
|
$0.00 |
|
Remark: |
|
|
|
|
|
1. the above quotation is complete EPC price in US Dollar, but not including transportation, custom clearance, insurance, civil works, and installation. |
2. the quotation is only for reference, final proposal and quotation should be decided to final scope of supply and project practical data and conditions. |
3. the quotation code: 633020111231 |
4. validity: 3 months from Dec. 31th, 2011. |
5. the quotation unit is 10000 USD. |