BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Spare Parts  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Siemens Gas Turbine Generator  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
     MTU Cummins Perkins Volvo Diesel Generator  
     Power Plant Generator  
       Air Cooled Power Generator  
       low speed 125rpm/150rpm generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
     Cable&Wire  
     Electric Motor  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  

Diesel Generator Proposal

Power Plant Proposal

Home > Equipments > HFO Diesel generator & Marine HFO Engine - 4x3mw 7H32/40 Hfo diesel generator technical proposal.


 

4x3mw 7H32/40 Hfo diesel generator technical proposal.

 

Technical parameter for Generator Sets

Type

7H32/40

Brand

ZGPT-HYUNDAI

Dimension (L×W×H)  mm

9486×2810×4130

Weight               t

78

MCR           kW

3209

Voltage Rating          kV

11

PF

0.8

Rated Speed           rpm

750

Output Frequency            Hz

50

Steady-state voltage adjustment rate   %

±0.5

Voltage fluctuation rate          %

<.5

Frequency fluctuation rate      %

<5

Load mutation frequency settling time (S)

<3

Mutation load voltage stabilization time (S)

<2

Terminal connection

3phase,3wire

Fuel type

Diesel fuel oil or HFO

Engine

Type

7H32/40

Brand

HYUNDAI

MCR             kW

3325

Cylinders

7 L

Spec. fuel oil consumption   g/kWh

181

Spec. lub oil consumption    g/kWh

0.7

Starting system

Compressed Air

Cooling system

Water cooling

Rated Speed            rmp

750

Mean eff. pressure (MEP)         bar

24.9

Piston speed             m/s

10

Displacement /cylinder              L

32.2

Governor style

Electronic governor

Exhaust gas temperature (after TC)           oC

345

Exhaust back pressure(Max)       mbar

30

Compression ratio

15:1

Stroke               mm

400

Bore               mm

320

Alternator

Brand

Leroy Somer/ ABB/ Siemens/AVK /HYUNDAI

MCR                  kW

3209

Voltage Rating           kV

11

Rated Frequency          Hz

50

PF

0.8(Lag)

Field System

Brushless, PMG-excited

Insulation Grade

H

Grade of Protection

IP23

rated speed           rpm

750

Exotherm  Stator / Rotor 

F/F

Coolant method

Self-fan coolant

 

1.      Company introduction

Zhejiang Zhonggao Power Technology Co., LTD. (short for ZGPT), with headquarter in Zhejiang, China, has two production bases in Yiwu and Hangzhou, founded in 1995.

ZGPT is specialized in the research and development, manufacturer, sales, service, establishment of power plant, investment and EPC of middle and high-end diesel generators at home and abroad and HFO main engine for power plant as well as auxiliary equipment. ZGPT shall also provide the whole power system solutions to customers, push forward the demands of power at home and abroad and strive for the honoured enterprise of China and the world.

In recent years, the development pace of ZGPT has been accelerated ceaselessly. In 2004, ZGPT, cooperated with Zhejiang University to set up Zhejiang University-ZGPT technology joint research and development centers,  is specialized in the research about environmental protection and energy conservation of diesel generator set, and achieved many patents of parallel operation, energy conservation and vertical control cabinet of diesel generator set, so as to ensure the leading technology and high quality. Meanwhile, with regards to own special experience and technology, ZGPT has published the first professional textbook of Diesel Generator set that has been adopted by many domestic colleges and universities.

The normative management plays an important part in the core competence of enterprises. ZGPT learns from the "2+1" mode of management (that is, Status manuals, operating instructions + support platform) to implement the normative management to ensure every post and works having a dependable base. Meanwhile,   ZGPT has also learned from the Haier OEC management from the target management system to ensure the continuous improvement for all employees. In 2008, ZGPT took the lead in introducing ERP (Enterprise Resource Planning) system so as to increase the response speed and ability of technical response, technical proposal, manufacturing control delivery time control, cost management, etc.

Quality is the survival of an enterprise. ZGPT has established perfect quality management system and passed ISO9001 quality certificate and ISO14001 environmental management certificate.  ZGPT passed Quality Inspection Certificate in 2005, and achieved Certificate of Conformity of Quality System Certification of Military Products and McIntyre Certification of State Information Department in 2006,  rated as Zhejiang Medium-Size High-tech Enterprise by Chinese Academy of Sciences.

ZGPT always looks upon our clients as God. ZGPT not only provides the satisfactory products to customers, but also proposes "5S" standard services, that is, on the one hand, absorbed the service workers, on the other hand, organized the communications between customers and internal technicians and service workers, also organized the training to enhance the ability and quality of service workers. ZGPT strives for the first generator set of China brand by quick responses to customers and provision of quick and satisfied services to customers.

ZGPT has won the acclaim of the professionals in these fields and established a good corporate reputation by strong technical strength, reliable quality, favorable pre-sales and after-sales service, timely delivery and complete service networks, having achieved impressive performances in power plant, data base, electricity, oil field, telecommunication, smelting industry, civil aviation, bank, supermarkets, etc. 

2.      General rules

1.1 This technical program applies to Iraq 12MW Power station, which put forward the technical requirements of equipment for HFO power plant, and the design, structure, performance, installation as well as delivery for auxiliary equipment.

1.2 The basic requirement of technical performance, technical parameter, scope of supply, technical service as well as responsibility are all provided in this technical program.

1.3 Our company is responsible for supply with completely new, advanced, reliable, and integrate equipment with rational combination which has achieved or surpassed national standard.

1.4 Civil construction is not involved in the scope

3.      Codes ,standards , units and language

Equipment, parts and auxiliary equipment, provided by the sealer, correspond with the latest version of the standard, but they are not limited to the following standard:

3.1 State Standards

-GB Relevant Standards

-ISO Standards

-IEC : International Electro-technical Commission

-KS : Korean Standards

-JIS : Japanese Industrial Standards

-ZGPT Factory Standard

3.2 Units and language

In all correspondences of technical documents, schedules and drawings, metric units of all measurements shall be used.

The English language shall be used in all documents, drawings, name plates and correspondences between contractor and client.

4.      Design parameter

4.1 Standard environmental conditions

Refer to ISO 30461/1-2002, the standard environmental condition:

Site Altitude (barometric pressure)         0 m

Environmental temperature:              25oC

Barometric pressure:                    1bar

RH (relative humidity):                  30%

Air temperature before T/C blower inlet    25oC

4.2 Local environmental conditions

Site Altitude (barometric pressure)        150m

Maximum ambient temperature           50oC

Minimum ambient temperature             -10oC

Average maximum ambient temperature    Not quite clear

Average minimum ambient temperature     Not quite clear

Average wind speed                    Not quite clear

Average annual rainfall                 Not quite clear

Relative humidity                     10%

4.3 Fuel Specification

For a main fuel of the power plant is heavy oil. Light diesel oil for a start-up, stop and maintenance.

The heavy fuel oil shall have the viscosity characteristics that the viscosity must be within the range of 12 ~ 18 cSt with the heating lower than 150 Deg.C.

The viscosity of Diesel oil shall be of 2.0 ~ 14 cSt at Engine inlet under the power plant operating conditions.

Heavy fuel oil specification:

_specific weight at 16.5 deg.c (0.95)

_Flashing point min at 56deg.c

_Viscosity 120 sent. stoc. at 50 deg.c

_Flow point Max + 21 deg.c

_percentage(S)quantity is 3.5%

_Percentage(C) is 6.5% after burning

_Water containing &(volume percent) residual 1.5%

_Thermal value (11500) kcal/kg

4.4 Lubrication oil Specification

The lubricating oil for engine shall be selected from the list of recommended lubricating oils for engine, which shall be of HD (Heavy duty) API-CD class and SAE 40.

4.5 Cooling water for diesel engine

The cooling water system is designed for using normal fresh water with corrosion inhibitor, in order to prevent incrustation and corrosion attack.

The following water quality shall be valid;

For engine

-  PH values  :                   7~9

-  Total hardness as CaCO3:       Max. 75 ppm (mg/liter)

-  Chloride as CI   :              Max. 80ppm (mg/liter)

-  Sulphate content      :          Max. 100 ppm (mg/liter)

-  Silicate as SiO :              Max. 60 ppm (mg/liter)    

-  Residue after evaporation       :      Max. 400 ppm (mg/liter)   

5.      Customer Requirements

Power station site: Iraq

Total capacity of power station: 12MW

Voltage: 11kV 

Frequency: 50Hz      

PF (Power Factor): 0.8pf 

6.      Summary of 12MW power station

6.1 Overall description of power station

There are 4 sets ZGPT- HYUNDAI 7H32/40 diesel generating sets in 12MW heavy oil power station, each set rated power: 3209KW. Excluding site degradation and Plant utility power consumption,, the total net output of power station is about 12 MW in continuous operation. Voltage: 11kV, Frequency: 50Hz, PF: 0.8pf, Speed: 750rpm.

The design picture of standard electrical station:

?Power station

?Exhaust system and exhaust boiler

?Sweetener

?Radiated coolant system

?Fuel depot

?Pump station

?Maintenance workshop and warehouse

 

12MW power station contains engine hall, exhaust system and exhaust boiler, radiated coolant system,fuel depot, pump station, maintenance workshop & warehouse and working building. Generating sets, auxiliary machines, supply unit, lube filtration separator and control system are all installed in power station. While the actual station design could be adjusted by weather, environment and terrain, but principle of proximity should be considered to prevent too much a long pipe arrangement. At the same time, the heat of heavy fuel oil tank is realized through the vapor of exhaust boiler, so the short line is in favor of heat insulation.

The heavy fuel oil could be the main fuel and light diesel oil the auxiliary fuel. With the main generating sets parallel operation, each unit can input or exit operation. The control system could adjust power balance, power of different sets, which has protective measures of inverse power, over current, etc.

(Suggestions)The power station need to collocate a 250kVA auxiliary engine, which can supply the black start power, light fuel oil, 24V storage battery start, power -0.4kV, frequency-50Hz, PF-0.8pf, and rotated speed-1500rpm. When the power station comes into good running, the auxiliary engine turns to the emergency standby sets.

Transformer, collocate by power station, provide the main auxiliary equipment with working power supply, the electricity of station lighting and domestic consumption.

6.2 Characteristics of heavy oil power station

(1) Highly-structured corollary equipment, flexible installation site and short construction period

The corollary equipment of heavy fuel oil generating sets is rather simple for little corollary equipment, small volume and light in weight. Compared with water turbine-generator set needed to dam, vapor generating set needed to boiler, fuel storage, and water treatment system, the diesel generating set has advantages of small occupation, high construction speed and low invest cost.

Modularity unit system used for heavy fuel oil generating sets, flexible arrangement according to the terrain, which is fit for construction of mountain area and mine area, subjected to small regional terrain restrictions.

(2) High thermal efficiency, low fuel oil consumption and low operation cost

The heavy fuel oil machine extended from diesel is the highest thermal motors of thermal efficiency, of  which the effective thermal efficiency is 40%?0%, the high-pressure steam turbine is about 20%?0%, and combustion gas turbine is about 20%?0%. So fuel consumption is rather low about 178g/kWh. The power station form applied with heat and power cogeneration, has the higher whole energy conversion efficiency, and the thermal power gets more fully used.

 (3) The rapid starting and can quickly reach full power

The heavy fuel oil generating sets may use heavy fuel oil and light fuel, which could reach full

loaded operation in 3 min of emergent condition (light fuel oil used on emergency ), and in 10 min of normal operation condition (starting uses light fuel oil, and heat engine uses heavy fuel oil ),while the thermal & electricity steam power equipment generally needs 3?h from starting to full load. What’s more, the shutdown process of diesel is rather short, started and shutdown frequently.

 (4) Simple maintenance, small conventional maintenance work, little operation staff, overhaul period of 36000h (related to the fuel oil quality), and low operation expense.

 (5) Convenient unit combination, capacity easy to extended

Each capacity of heavy fuel oil power station generating sets, ranging from 3000kw to 21000kw, which has the advantage of fitting for more power supply load with more selected capacity. When adopting heavy fuel oil power station generating sets as power, the installed capacity may dispose neatly according to actual need, which can increase power set capacity in the after enlargement & production. The expansion of access is simple and smart, so the expense of primary construction investment is much lower.

7.      Scope of supply

No.

Designation

Contents

Unit

Qty.

Installed location of machines

Remarks

1

7H32/40

generating sets

Engine, Auxiliary module ,shaft coupling, generator, public chassis, control panel

set

4

Power plant

 

2

Lube separating module

Including lube delivery pump, lube preheating device, lubricant separator, sump pump, sump tank, control switch cabinet, etc.

set

4

 

3

Fuel supply module

Conversion valve of heavy fuel oil and light oil, fuelmeter, viscosity control, fuel mixed tank, fuel pressure pump, HFO end heater, fuel cooler, fuel double filter, control switch cabinet

set

4

 

4

Leakage oil & decontamination module

Sludge pump discharge, fuel leaked oil tank, lube sludge tank

set

1

 

5

Engine preheating module

Preheating high temperature water, lubricating oil

set

2

 

6

Inlet filtration muffler module

Shutter, inlet filter, inlet muffler

set

4

 

7

Water maintenance module

Radiator, centrifugal water pump

set

1

 

 

8

Heavy oil separation module

HFO delivery pump, HFO preheating device, Separator, sump pump

set

2

Pump plant

 

9

Air container

Starting air container, working air container, pressure reducing valve

set

2

 

10

Air compressor

H.P. air compressor

set

2

 

11

Radiator

High /low temperature water heat dissipation

set

4

 

12

Exhaust Muffler

Exhaust Muffler

set

4

 

 

13

Exhaust boiler

Boiler body, air manifold, water pump, control switch cabinet

set

4

 

 

14

Switch cabinet

Switch cabinet of parallel generating sets

set

4

 

 

15

Feeder cabinet

Switch cabinet of total outgoing line

set

1

 

 

16

Neutral point resistance cabinet

Neutral point grounding of generator

set

4

 

 

17

PT cabinet

PT buscouple

set

1

 

 

18

DC panel

 

set

1

 

 

19

Power distribution cabinet

Power consumers and distributors of each module system

set

1

 

 

8.      Configure of power station system

8.1 Diesel generating sets

The generating sets mainly include diesel, duplex bearing generator, high elasticity shaft coupling and public housing. Diesel and duplex bearing generator are connected by high elasticity shaft coupling, which are also supported and fixed by public housing.

Function of diesel generating sets:

Rated power·········································3209kW   According to ISO3046

Site(Most Continuous Power)\speed···································· 3000kW

Rated speed··································· 750rpm   

Rated voltage··································· 11kV   

Rated frequency····························50Hz 

PF(Power factor)······································· 0.8     

Dry weight··············································· 77.1t    

The generating sets as the mai, n electrical power, no limitations for operation time; it can operate and supply electricity continuously except the normal maintenance.

8.1.1 Test and inspection

1) Shop test

,

Diesel engine shall be tested at the shop in accordance with ISO 3046 and manufacturer’s standard.

Load test

Diesel engine will be coupled with a generator and tested using marine diesel oil under the following loads and duration of test program.

   Load     Duration

50 %                0.5 hours

75 %                0.5 hours

100 %                1 hour

Other test shall be performed additionally as follows :

  -  Over speed trip test

-  Engine safety device test (as per HHI standard)

After the shop test, the engine is to be overhauled and inspected in the presence of the representative of the client for the chosen one (1) cylinder for the followings ;

-  Piston & connecting rod

-  Cylinder liner

-  Main bearing shell

-  Intake and exhaust valve

2) Site test (option)

Client shall perform commissioning and start-up with Contractor’s technical assistance.

 Followings shall be checked before or during commissioning;

-  Installation check

-  Engine & generator coupling and alignment check       

-  Test to prove correct operation of interlocks, alarm and tripping circuits       

-  Safety device simulation check

Site performance test

After successful start-up, performance test shall be done by client under the technical assistance and guidance of contractor’s supervisor(s) as follows as far as site conditions allow;

Load               Duration

50% load          1 hour

75% load          1 hour

100% load          1 hour

The performance test procedure will be submitted to the client.

8.1.2 Diesel

Brand and model of diesel······························ ZGPT- HYUNDAI 7H32/40 

Pattern································· L, four stroke, direct injection, turbocharger, air cooled, compressed air starting

Cylinder bore······························ 320mm 

Stroke································· 400mm  

Compressed ratio····························15:1  

MCR (Most Continuous Power)\speed·············· 3325kW/750 r/min   According to ISO3046

Site(Most Continuous Power)\speed················ 3108kW/750 r/min

Direction of rotation·························· Crankshaft clock-wise rotation (as viewed from output end)

Lowest steady speed··························· 250r/min 

Fuel consumption rate (When MCR happens) ·············· 181g/kW.h,tolerance+5% 

                                         (Lower calorific value of fuel 42700KJ/kg;

Without engine driven pumps; Tolerance+5%; At 100& load)

MEP (Mean effective pressure)   24.9Mpa

Pistons mean speed································· 10 m/s 

Air intake flow····································· 23700kg/ h 

Exhaust gas flow··································24400kg/ h

Exhaust gas temperature after supercharger················· 354oC (300~400oC)

Supercharger air pressure································ 2.5-3.5bar

Supercharger air temperature before cylinder·················· 45oC (35~50oC)

Exhaust main pipe temperature before supercharger···························450~570oC

Most combustion pressure·································· 190bar

Diesel inlet lube pressure·································· 0.4~0.5MPa  

Diesel inlet lube temperature··································· 65oC 

H.T. water into-machine pressure···································· 0.3~0.4MPa

H.T. water out-machine pressure······························ 90oC  

Injector coolant water into-machine pressure···························0.4~0.9 MPa  

Injector coolant water into-machine temperature ···························60oC   

Fuel into-machine pressure·····························0.4~0.8MPa  

8.1.3 Generator

Brand of generator·································· Leroy Somer/ ABB/ AVK /HYUNDAI

Generator output power\speed························· 4011.25kVA / 3209 kW

Direction of rotation··································· Counter clock-wise (as viewed from input end)

PF············································ 0.8 

Voltage, frequency·······································11kV 50Hz 

Efficiency·········································96.5% 

Grade of Protection············································ IP23 

Winding temperature sensory··························· 2×6Pt100 (sensory) (1 set standby)

Anti-freezing heater········································· AC230V 

Coolant method·············································· Self-fan coolant

AVR (Automatic Voltage Regulator)·················· Installed on generator

8.1.4 High elasticity shaft coupling

Connect the diesel and generator elastically in order to make sure the output power from diesel deliver to generator.       

8.1.5 Common base and elastically supported

Fix and support diesel and generator, internally install lube working oil tank and contain lube for diesel engine.

The gensets are mounted with resilient vibration-free isolators onto the foundation. Diesel engine lube oil, cooling water interface connect the outside piping through a flexible connection

Common base equipped with electric drive turning gear, the pre-oil pump, lubricating oil centrifugal filter, fuel leak alarm and bolts, adjust seat pad and so on.

8.1.6 Genset control, safety and monitoring system

1) Genset control and monitoring system

-  Woodward electronic governor (EN80 actuator and 723+ controller)

-  Pressure & temperature sensor

-  Exhaust gas temperature sensor

-  Main bearing temperature sensor

-  Local engine control panel including monitoring system to be provided

2) Engine /generator control panel

Engine/ Generator control panel will be metal-enclosed, free-standing, IP41, indoor installation.

Monitoring

-  Engine RPM display

-  T/C RPM display

-  Engine pressure display

     Starting air pressure   

     FO engine inlet pressure

     LO engine inlet pressure

     Charge air engine inlet pressure

     LT & HT cooling water engine inlet pressure

   -  Engine temperature display

FO engine inlet temperature

     LO engine inlet temperature

     Charge air engine inlet temperature

     HT cooling water engine in/outlet temperature

     LT cooling water charge air cooler in/outlet temperature

     Main Bearing temperature

     Exh. Gas T/C inlet temperature

-  Generator

     Bearing temperature

     Stator winding temperature

Control

-  D/G set emergency stop

-  Engine start and stop

-  Engine speed control

-  Generator voltage control

-  Remote/Local control selection

Engine safety

-  Overspeed

-  LO engine inlet low pressure

-  HT cooling water high temperature

-  Tacho failure

-  Main bearing high temperature

Protection relay (multi or single protective type)

-  Under/ over voltage protection

-  Reverse power protection

-  Loss of excitation

-  Overcurrent protection

-  Overcurrent ground protection

-  Under and over frequency protection

-  Lock out relay (separate type)

3?/B>COMMON SYNCHRONIZING PANEL

-Double volt. Meter

-Double frequency meter

-Synchronizer

-Synchro scope with synchro check relay

4) LOCAL ENGINE CONTROL PANEL

Local Engine control panel will be metal-enclosed, free-standing or flash mounted, IP41, indoor installation, supplied separately.

Monitoring

-  Engine RPM display

-  T/C RPM display

-  Engine pressure display

     Starting air pressure   

     FO engine inlet pressure    

     LO engine inlet pressure 

     Charge air engine inlet pressure

     LT & HT cooling water engine inlet pressure    

-  Engine temperature display

     FO engine inlet temperature

     LO engine inlet temperature

     Charge air engine inlet temperature  

     HT cooling water engine in/outlet temperature   

     LT cooling water charge air cooler in/outlet temperature   

     Main Bearing temperature

     Exh. Gas T/C inlet temperature

Control

-  D/G set emergency stop

-  Engine start and stop

-  Control Blocking

-  HT Cooling water Control Valve Control

However, the above shall be adjusted subject to detail design.

8.2 Auxiliary module

Auxiliary module is the engine front-end box device, fixed to the free end of the engine.

Auxiliary module integrates the pipes of the cooling water system and lubricating oil system, equipped with oil pumps, oil coolers, oil temperature control valve, oil pressure regulating valve, oil self-purification filters, HT pumps, LT pump and other equipment.

8.3 Lubricant system

Lubricant system provides getsets with lube of regular flow, temperature and quality, in order to lubricate and cool bearing, operation parts and piston. With separation, filtration and fresh supplement of lube, it can guarantee the function of set lube.

Lubricant system is a closed circulation system with a connection to the atmosphere via the tank vent pipe and the crankcase vent pipe.

Lubricant system contains lube working tank, lube oil pump, lube cooler, lube temperature control valve, lube oil filter, lube pressure regulating valve, lube preheating module and lube cleaned separating module, etc.

Gensets external lubricant oil system consists of cleaning separate modules, oil sludge double-filter etc.

8.3.1 Lube working tank

Lube working tank, integrated in the steel base frame. When the generating sets operate, the oil level must be between upper limit and bottom limit of working tank.

Capacity of lube·····································3 m3

8.3.2Lube oil pump

Lube oil pump has gear type and screw pump, which can make circulation by the lube. Relief valve installed internally to prevent the high system pressure. And lube oil pump drives by motor, one standby one uses.

Flow··········································· 2×30 m3/h, 7 bars 

8.3.3 Lube cooler

Lube cooler is panel cooler to take accumulated heat of system.

Heat exchange····································· 496 kW

8.3.4 Lube temperature control valve

Lube temperature control valve uses for maintain the constant temperature of system or the change within the small range of system temperature.

Control temperature ······································· 60-69oC

8.3.5 Lube oil filter

Lube oil filter can protect the diesel, which can keep off the impurity and lies in the entrance of diesel lube oil. Also the lube oil filter is continuous cross flow current kick-type self-cleaned filter.

Nominal filter fineness····································· 34μm

8.3.6 Lube pressure regulating valve

Lube pressure regulating valve is to regulate the system power of the operation process, which can make the inlet lube within the certain range of pressure of diesel.

Regulating pressure········································ 4-5bar

8.3.7 Lube preheating module

Parallel connection with the main lube system, it may preheat the lube of working tank to guarantee the rap is starting or sudden load. Generally, high temperature coolant water system and lube oil system are preheated with the same module.

Preheating temperature···································· 40 oC

8.3.8 Lube cleaned separating module

It is connected with the main lube system, very important, which includes lube delivery pump, lube preheating unit, lube separator, sump pump, sump tank, and control switch cabinet. Generally, it separates the moisture and harmful of lube oil dust with centrifugal oil separator.

Effective handling capacity·································· 0.8 m3

8.4 Coolant system

Coolant system, divided into two-closed circulation system, the low temperature water circulation system and high temperature water circulation system connect the atmosphere with the expansion radiator. Excepted from cooling the main machine, it needs to guarantee the proper temperature of the engine to meet combustion demand different load. The low temperature water is responsible for cooling supercharge Air II and lube oil, while the high temperature water for cooling cylinder jacket, supercharge Air I and cylinder head. And the external cooling uses the radiator not adding water.

The low temperature water circulation system mainly consist of LT expansion tank , LT water pump, LT heat exchangers and other equipment elements.

The high temperature water circulation system mainly consist of HT expansion tank ,HT water pumps, HT heat exchanger and temperature control valves and other equipment elements.

When the genset is running, the nozzle must be cooled; the cooling medium is oil, the lubricating oil main system taking the nozzle heat. Nozzle cooling module is installed in the engine block, and realizes the nozzle cooling function.

8.4.1Water pump

Both high temperature water pump and low temperature water pump are all centrifugal water pump, driving by the motor, one standby one uses. High & low temperature water pump deliver high temperature water and low temperature water separately through pump, making the circulation in the return line of their own.

High temperature water pump flow·························· 70 m3/h, 4.5 bar

Low temperature water pump flow·························· 70 m3/h, 4.5 bar

8.4.2 Radiator

The low temperature heat exchanger is responsible for cooling supercharge Air II &lube oil and drop off the heat of nozzle, while the high temperature heat exchanger for cooling cylinder jacket, supercharge Air I and cylinder head.

High temperature heat release···························kW

HT inlet / outlet temperature···························80/61oC

Low temperature heat release························· kW

LT inlet / outlet temperature··························· 44.6/33.5oC

8.4.3 Temperature control valve

The main function of high temperature water temperature control valve is to keep the constant temperature of out-let high temperature water, while the low temperature water temperature control valve is to keep the constant temperature of in-let low temperature water.

8.5 Cooling water preheating module

Parallel connection with the main high temperature coolant water system, this unit preheats the cooled water in sets and pipe to guarantee the rapid starting and sudden load of engine. Generally, high temperature coolant water system and lube oil system are preheated with the same module

Preheating temperature·························· 40 oC

8.6 Fuel system

Fuel system includes the parts of unloading oil, storage, delivery, handling, supply and gather of return oil, whose functions are to supply fuel continually to diesel and to preserve the constant flow, pressure, cleanness and viscosity. The heavy fuel oil system has the light oil as standby use, when starting and shutdown changing to light oil supply.

Fuel system includes heavy unloading fuel oil unit, heavy fuel oil storage oil-can, heavy fuel oil delivery unit, heavy fuel oil buffer oil cabinet, heavy fuel oil separating module, daily heavy fuel oil cabinet, fuel supply module, oil sludge tank, diesel unloading oil unit and daily diesel cabinet.                                            

8.6.1 Heavy fuel oil separating module

This unit, very significant, filtrates the heavy fuel oil with separator, which includes heavy fuel oil delivery pump, heavy fuel oil preheating unit, separator, oil sump and switch control cabinet. The separating impurity is delivered to oil sludge tank by pump.

The effective handling capacity ························ 6.2m3/h

8.6.2 Heavy fuel oil delivery unit

Heavy fuel oil delivery unit has gear type and screw pump, with the main function of delivering heavy fuel oil from storage oil-can to buffer oil cabinet by pump.

Delivery pump flow···························· 3.4m3/h,7 bar

Fuel twin filters······························ 34μm

 8.6.3 Fuel supply module

The main function of this unit is to heat and pressure fuel filtration, to supply the diesel fuel under the circumstance of standard temperature, pressure, viscosity and flow, and to realize the transfer between heavy fuel and light oil. This can change into the light oil between the starting and shutdown. Fuel supply module includes conversion valve of heavy fuel oil and light oil, fuel meter, viscosity control, fuel mixed tank, fuel pressure pump, HFO end heater, fuel cooler, fuel twin filters, and control switch cabinet.

Fuel pressure pump·························· 1.8 m3/h, 8 bar(one standby one uses?/FONT>

Fuel twin filters······························ 34μm

Fuel mixed tank····························· L

8.6.4 Diesel oil supply module

Diesel fuel supply unit consists of diesel fuel supply pump and filter unit, to supply enough diesel oil and ensure the normal operation of unit.

Fuel supply pump··························· 3.4 m3/h, 8 bar

Filters·································· 34μm

8.7 Air Inlet system                                             

Air inlet comes into the cylinder of main machine after turbocharged, to prevent the machine weary and clean air. Muffler is generally installed between turbocharger and air filter, which can reduce the high-frequent noise produced by the turbocharger. The inlet system contains shutter, inlet filter and inlet muffler, which forms the inlet filtration muffler module with each equipment combined.

Air inlet system mainly consist of window-shades, air filter, intake silencer and other equipment components, all the device integrates into a filter intake silencer module.

Air flow··································· 23.7 t/h

Inlet muffler································· 30dB (A)  

Filter precision······························· Max. 5μm

8.8 Exhaust system 

    The burned exhaust gas is pushed out by turbocharger, the temperature from 300?to 335?depending on the load of engine and used fuel. Before push put exhaust gas, it is recovering waste heat first by the muffler, then by the exhaust boiler. If needed, the second exhaust cleaned system, such as desulphurization equipment, is also installed. The exhaust system includes exhaust muffler.                                                                                                                                          

  Exhaust muffler function: Reduce the exhaust noise of engine.

Exhaust flow································ 24.4 t/h

Exhaust muffler······························· 25 dB (A)

Exhaust boiler: Exhaust energy circulation use for heat of heavy fuel oil, water and lubricating oil, heat tracing, containing exhaust muffler, boiler body, air manifold, water pump and control switch cabinet.

Evaporation capacity·····························1.5 t/h

Pressure··································· 9 bar

Temperature·································· 175oC

8.9 Leaked oil & decontamination module

This unit includes fuel leaked oil tank, lube sludge tank, sludge pump and exhaust oil pump, with function for collecting leaked fuel then supplying heavy fuel oil separating module. The lube oil sludge separated by the unit delivers to the oil sludge tank. Also, the oil sludge separated by heavy fuel oil separating module delivers to the oil sludge tank through the leaked oil pump.

Fuel oil leaked cabinet····························· 250 L

Sludge and exhaust oil pump························· 1.8 m3/h,3bar

Lube oil sludge cabinet···························· 250 L

Lube oil Sewage discharge pump······················ 1.8 m3/h,3bar

8.10 Compressed air system

Compressed air system mainly contains starting air container, working air container, pressure reducing valve and air compressor.

8.10.1 Starting air container························· Quantity: 2

Capacity·································· 500 L, 30bar

8.10.2 Working air container························· Quantity: 2

Capacity···································250 L, 7bar

8.10.3 Pressure reducing valve························ Quantity: 2

Capability··································· 30-7bar

8.10.4 Start air compressor···························Quantity: 2

Capability··································· 30bar, 50 m3/h

8.11 Electrical equipment of generating sets

Medium voltage switchgear mainly includes switch cabinet of generating sets, feeder switch cabinet and Neutral point resistance cabinet.

8.11.1 Switch cabinet of generating sets

Cabinet··································· KYN28-12

Dimensions································· 800(W)×1500(D)×2200(H)mm

Breaker···································· Circuit breaker 12kV ,630A,3-pole 25kA

Draw out type circuit breaker

Protection··································· PWZB

Quantity···································· 4side

8.11.2 Feeder switch cabinet

Cabinet···································· KYN28-12

Dimensions································· 800(W)×1500(D)×2200(H)mm

Breaker·································· Circuit breaker 12kV,1250A,3-pole 25kA

Draw out type circuit breaker

Protection···································PWZB

Quantity···································· 1side

8.11.3 PT cabinet

Cabinet··································· KYN28-12

Dimensions································ 800(W)×1500(D)×2200(H)mm

Quantity································· 1 side

8.11.4 Neutral point resistance cabinet

Dimensions································ 800(W)×1500(D)×2200(H)mm

Color··································· Camel gray

Quantity .···································4side 

8.11.5 Power distribution cabinet

Dimensions································800(W)×1500(D)×2200(H)mm

Color··································· Camel gray

Quantity································· 1 side

8.11.6 Control panel of generating sets

Dimensions······························· 800(W) ×800(D) ×2200(H) mm

Color································· Camel gray

Quantity······························· 4side

8.11.7 Direct current cabinet

Dimensions····························· 800(W)×600(D)×2200(H) mm

Quantity································1 side

AC input voltage···························· AC 400V±15%,50Hz,three phase four wire system,two input electrical power

DC Output Voltage··························· DC230V(Working voltage of auxiliary switch cabinet)

Battery capacity···························· Plumbonic acid battery non-maintenance 100Ah

Precision of voltage regulation·························· <±0.5%

Precision of steady current······························· <±0.5%

Ripple factor································<±0.5%

System efficiency······························ >90%

Power factor (PF)·······························>0.92

Operation noise······························· <50dB

Dielectric strength······························· 2000V/min no flashover, no disruption

Grounding resistor······························· <0.1Ω

Output return circuit······························· Standard configuration: KM 5, HM 5.

Cabinet structure······························· Product screen body of our company adopt PK structure, the front with glass doors

Grade of Protection···································IP30

9.      The practicable contents for the contractor

No.

Contents

Remarks

1

The whole design of power station

 

2

Construction project, equipment foundation construction

 

3

Units in place

 

4

Installation of power station equipment

 

5

Pipes(oil pipe, water pipe, air pipe, smoke pipe, tracing pipe, etc.?/FONT>

 

6

Oil tank& construction

 

7

Heavy fuel oil, diesel oil, lube unloading oil equipment

 

8

Power transformer, electricity transmission

 

9

Cable, wire, bridge

 

10.    Technical data and drawings of products

10.1 General requirements

10.1.1 The data provided by the sealer should be the national legal system of units, ie International System of Units, language be Chinese, the foreign drawings and files of import parts be provided foreign original documents. The sealer will provide the whole information and drawing according to units technical specifications, technical requirements, scope of supply and guaranteed conditions.

10.1.2 The drawings offered by the sealer should be clear and micro-copied drawings are forbidden to be offered. The organization structure of data is to be clear and strict in logic. The content of data must be correct, accurate, clear and comprehensive, meeting the project.

10.1.3 The sealer should provide the data related with the equipment design in time.

10.1.4 If to be found, the sealer will provide the files and data free of charge to other data not lined in the contract but project to be needed. When the equipment make an improvement, the sealer will provide the new technical data free of charge in time. 

10.2 Basic Requirements of information presentation

10.2.1 Technical files of coordination with project design data and drawings

The sealer will provide the data and drawings satisfied for the project design, project installation and operation maintenance.

As shown below:

No.

Designation

Qty.

Submission time

Remarks

1

Unit profile, unit installation system drawing, drawings of external auxiliary equipment and connection dimension, installation drawing

1

In one half a month after contract signing

AUTOCAD

E-document

2

The basic reference diagram of generating sets

1

In one half a month after contract signing

AUTOCAD E-document

3

Reference diagram of power plant

1

In one half a month after contract signing

AUTOCAD E-document

4

Principle diagram of system electricity, switch cabinet (one or two return circuit, chain, signal return circuit and external contacts )

1

In one half a month after contract signing

AUTOCAD E-document

5

Switch cabinet, outlet cabinet installation and connecting diagram

1

In one half a month after contract signing

AUTOCAD E-document

10.2.2 The technical files as data and diagram delivered with equipment

The sealer shall provide the needed data and diagram satisfied for the project installation, pre-commissioning, performance acceptance and operation maintenance in time (rather than the following files).

No.

Designation

Qty.

Submission time

Remarks

1

Drawings of unit profile, external auxiliary equipment and connection dimension, installation drawing

One set per set

Delivered with the equipment

 

2

Principle diagram of system electricity, switch cabinet (one or two return circuit, chain, signal return circuit and external contacts )

3

Diagram of units control system

4

Diagram of external auxiliary equipment control system

5

Switch cabinet, outlet cabinet installation and connecting diagram

6

Installation operating instructions

7

Operating instructions

8

Maintenance instructions

9

Atlas of spare parts

10

List of spare parts about operation maintenance and loss

11

List of equipm, ent packing

12

certification by manufacturer

11.    Progress of production and delivery

ZGPT

12MW Power Station Equipment delivery Plan

No.:ZGZD

Edition\ modification:2009/ 0

Effective date:

NO

Period   of    time

Project name

After signing the contract

Remark

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Jan.

 

1

4 sets gensets

 

 

 

 

 

 

 

 

 

 

 

 

2

Lube separating module

 

 

 

 

 

 

 

 

 

 

 

 

3

Heavy oil separation module

 

 

 

 

 

 

 

 

 

 

 

 

4

Fuel supply module

 

 

 

 

 

 

 

 

 

 

 

 

5

Leakage oil & decontamination module

 

 

 

 

 

 

 

 

 

 

 

 

6

Inlet filtration muffler module

 

 

 

 

 

 

 

 

 

 

 

 

7

Air compressor ,Air container

 

 

 

 

 

 

 

 

 

 

 

 

8

Exhaust Muffler

 

 

 

 

 

 

 

 

 

 

 

 

9

Radiator

 

 

 

 

 

 

 

 

 

 

 

 

10

Water maintenance module

 

 

 

 

 

 

 

 

 

 

 

 

11

Boiler system

 

 

 

 

 

 

 

 

 

 

 

 

12

Other equipment and accessories

 

 

 

 

 

 

 

 

 

 

 

 

13

Equipment installation and debug complete

 

 

 

 

 

 

 

 

 

 

 

 

1.      Delivery

12.1 Delivery requirements

The buyer is responsible for delivering the equipment and insurance for transportation expenses.

12.2 Package requirements

The sealer is in charge of equipment package, the package costs included in the total amount. The package and delivery be in accordance with the specifications of GB191-73 pictorial markings for handling of packages.

12.3 Place of delivery

Place of delivery in the sealer’s factory, the buyer should recognize the dispatch goods with the sealer helping to provide truck loading.

12.4 If the damage and loss happen to the equipment in transportation, the sealer will negotiate with the carrier and claim for compensation.

2.      The scope of service protection

13.1 Warranty period

Warranty period under scope of supply is one year. In the warranty period, the second party is in charge of free, for the problem of building in quality produced by the defects in equipment manufacture. After the warranty period, the sealer provides the technical consultation free of charge and the spare parts at the best price, also responsible for the life-long maintenance.

13.2 Guarantee of field service

In the warranty period, the sealer could provide more timely and comprehensive service guarantee. The spot service engineers sent by ZGPT are for the after-sales guaranteed work and train the spot operation workers, with food and accommodation provided by the buyer.

13.3 Technical training----to provide the training service free of charge

The sealer can provide the training of five days for ten persons, with food and accommodation provided by the buyer.

13.4 Installation of on-site guidance and commissioning

The sealer is responsible for the installation of equipment and commissioning; while the buyer is for solve the just requirements of the spot service engineers in order to ensure all tasks are carried.

13.5 Commitment

13.5.1 The aptitudes for spot service engineers of the sealer as follows:

a、Compliance with law, each rules and regulations on site.

b、In place on time with strong enterprise and responsibility.

c、Knowing about the equipment design in contract, familiar with the structure, having the spot working experience of the same or similar unit, able to do the spot guidance work correctly.

d?Healthy for the condition of field work.

13.5.2 The responsibilities of the spot service workers

a、The tasks mainly include the processing about problems of equipment quality, guidance for installation and commissioning, participation in trial running and acceptance functional test.

b、Before installation and commissioning, the technical workers should speak clearly to the buyer, explained and demonstrate the procedures and methods to be going.

c、The service workers have the right to dealing with all the problems of technology and business, ie, the service workers have to resolve the problems within the time allowed by the buyer, if the quality problems happen. If the sealer entrusts the buyer resolve the problem, the spot service workers of sealer must have the power of attorney and afford the related economic responsibility.

d、Pre-negotiation to the buyer about the normal come& go and change of the spot service workers.

13.5.3 The obligations about the buyer

The buyer need to coordination with the work of the service workers on site, and provision with the convenience for life, transport and telecommunications.

The buyer evaluates and recognizes the writing reasonable suggestions, and if the bad result happens for no execution of the buyer, it’s for buyer's account.

3.      Contacts

Both parties will agree in the contract execution stage about the plan, time, place, and contents of contacts.

 