BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Spare Parts  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Siemens Gas Turbine Generator  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
     MTU Cummins Perkins Volvo Diesel Generator  
     Power Plant Generator  
       Air Cooled Power Generator  
       low speed 125rpm/150rpm generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
     Cable&Wire  
     Electric Motor  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
     Drilling-Rig-for-Oil-Gas-Mining  

Diesel Generator Proposal

Power Plant Proposal

Home > Equipments > Drilling-Rig-for-Oil-Gas-Mining - 1500 HP RIG Technical Clarifications Page 2


 

1500 HP RIG Technical Clarifications Page 2

 
3.0
ใ€€/B>
DRILL STRING TUBULARS AND TOOLS
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.1
General
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Only new, range II drill tubulars will be accepted.   Unit prices are required.   All tubulars shall be fitted with metal thread protectors at both ends. Pipe racks and catwalks shall be provided.
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.2
Drill Pipe
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a. 5,000 metres of 5๏ฟฝ?x 19.5 lb/ft drillpipe, Grade G105, IU with NC50 connections and 6 ¼๏ฟฝ?OD tool joints.  Tool joints shall be hard-banded and the drill pipe shall have an internal plastic coating.
ใ€€/FONT>
API Standard ๏ผŒIEU.
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b. 1,500 metres of 3 ½โ€™x 13.3 lb/ft drill pipe, Grade G105, EU, with NC 38 connections, to run inside 7โ€™x  26 lb/ft interior flush liners.  Tool joints shall be hard-banded.   
ใ€€/FONT>
Not  Clear to the sentence โ€œto run inside 7"x26 lb/ft interior flush liners๏ฟฝ?. And here is not including  the internal plastic coating in the quotation.
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
c. 3 pieces 10 ft (3m) long pieces each of 5๏ฟฝ?OD drill pipe pup joints 
YES๏ฟฝ?/B>S135
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.3
Drill Collars
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a.  24 joints of 8โ€™๏ฟฝ OD x 2 13/16โ€™๏ฟฝ ID by 30ft long, spiral type drill collars, with 6 5/8โ€™๏ฟฝ Reg. Connections, and slip and elevator recesses.  Connection threads to be cold worked with gall-resistant coating in accordance with API Spec. 7.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b.  2 joints of 8๏ฟฝ?OD x 2 13/16โ€™๏ฟฝ by 10 ft (3m) long, spiral type drill collars (pup joint), with 6 5/8โ€™๏ฟฝ Reg. Connections,  and  slip  and  elevator  recesses.   Connection  threads  to  be  cold  worked  with  gall- resistant coating in accordance with API Spec. 7.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
c.  24 joints of 6 ½โ€™๏ฟฝ OD x 2 13/16โ€™๏ฟฝ ID by 30ft long, spiral type drill collars with NC 50 connections, and slip and elevator recesses.   Connection threads to be cold worked with gall-resistant coating ๏ฟฝ?in accordance with API Spec. 7.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
d. 2  joints  of  6-1/2๏ฟฝ?nbsp; OD  by  10๏ฟฝ?nbsp; long,  spiral  type  drill  collars  with  NC  50  connections,  and  slip  and elevator   recesses. Connection  threads  to  be   cold   worked   with   gall-resistant   coating   ๏ฟฝ?nbsp;  in accordance with API Spec. 7.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.4
Heavy Weight Drill Pipe
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
36 joints of 5" nominal OD, 2 ¾โ€™๏ฟฝ ID, Heavy weight range 2 drill pipe with NC 50 connection, 50 Ib per ft and 6 ๏ฟฝ?/2โ€™๏ฟฝ OD tool joints.  Tool joints shall be hard-banded and pipes shall an internal plastic coating.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.5
Kelly
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
2 pieces of API 5 ¼๏ฟฝ?nominal size, hexagonal Kelly, 40 feet standard overall length, with 3 ¼๏ฟฝ?bore, 6 5/8๏ฟฝ?Reg., 7 ¾๏ฟฝ?OD top connections, and NC50, 6 1/8๏ฟฝ?OD bottom connection. To be supplied with 2 pieces each of upper and lower Kelly cocks
YES
ใ€€/FONT>
ใ€€/FONT>
3.6
ใ€€/B>
Bit Subs
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a) 4 pieces of 7-5/8โ€™๏ฟฝ Reg. Box up and 7-5/8โ€™๏ฟฝ Reg. Box down, 9โ€™๏ฟฝ OD x 24โ€™๏ฟฝ long, bored for 5R float.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b) 4 pieces of 6-5/8โ€™๏ฟฝ Reg. Box down x 6-5/8โ€™๏ฟฝ Reg. Box up, 8โ€™๏ฟฝ OD x 24โ€™๏ฟฝ long, bored for 5R float.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
c) 4 pieces of 4 ½โ€™๏ฟฝ Reg. Box down x 4 ½ IF box up, 6 ½โ€™๏ฟฝ OD x 24โ€™๏ฟฝ long, bored for 4R float.
YES
ใ€€/FONT>
ใ€€/FONT>
3.7
ใ€€/B>
 Kelly Saver Subs
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Kelly  saver  sub,  4  ½๏ฟฝ?nbsp; IF  (NC  50)  connections,  6  ½๏ฟฝ?nbsp; OD  x  2-13/16๏ฟฝ?nbsp; ID  with  5๏ฟฝ?nbsp; OD  middle  recess  and  7๏ฟฝ?rubber protector installed.  36๏ฟฝ?Overall Length - 3 pieces.
YES
ใ€€/FONT>
ใ€€/FONT>
3.8
ใ€€/B>
Cross-over Subs
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
6  pieces  of  NC  50  box  up  x  6-5/8โ€™๏ฟฝ  Reg.  Pin  down,  8โ€™๏ฟฝ  OD,  with  6  ½โ€™๏ฟฝ  OD  fishing  neck,  24โ€™๏ฟฝ  long.   The tenderer shall include any other cross-overs as may be necessary to make up a complete drill string.
YES,Cross-over Subs ๏ผšNC38 Box*6 5/8REG Pin
NC38 Box*NC50 Pin
NC50 Box*NC38 Pin
NC50 Box*6 5/8REG Pin
6 pieces per size
ใ€€/FONT>
ใ€€/FONT>
3.9
ใ€€/B>
NRV Subs
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
4 pieces of NC 50 box up x NC 50 pin down, 6 ½โ€™๏ฟฝ OD, 24โ€™๏ฟฝ long, bored for 4R float valve.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.10
Three-Blade type drill string stabilizer ๏ฟฝ?26โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Two (2) pieces of blade type string stabilizer for 26โ€™๏ฟฝ diameter hole 8โ€™๏ฟฝ OD drill collar (fishing neck) diameter,6-5/8โ€™๏ฟฝ Reg. Box up x 6-5/8โ€™๏ฟฝ Reg. Pin down, 2-13/16โ€™๏ฟฝ diameter bore, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.11
Three-Blade type drill string stabilizer ๏ฟฝ?17 ½โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a) Four  (4)  pieces  of  blade  type  near  bit  stabilizer  body  for  17  ½โ€™๏ฟฝ  diameter  hole  8โ€™๏ฟฝ  OD  drill  collar (fishing neck) diameter, 6 5/8โ€™๏ฟฝ Reg. Box up x 6 5/8โ€™๏ฟฝ Reg. Box down, 2 13/16โ€™๏ฟฝ diameter bore, up end bored for 5F-6R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b) Four (4) pieces of blade type string stabilizer body for 17 ½โ€™๏ฟฝ diameter hole 8โ€™๏ฟฝ OD drill collar (fishing neck)  diameter,  NC  50  Box  up  x  NC  50  Pin  down,  2  13/16โ€™๏ฟฝ  diameter  bore,  cast  steel  thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.12
 Three-Blade type drill string stabilizer ๏ฟฝ?12 ¼โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a)  Four (4) pieces of blade type near bit stabilizer body for 12 ¼โ€™๏ฟฝ diameter hole 8โ€™๏ฟฝ OD drill collar (fishing neck) diameter, 6-5/8โ€™๏ฟฝ Reg. box up x 6-5/8๏ฟฝ?Reg. box down, 2-13/16โ€™๏ฟฝ diameter bore, up end bored for 5F-6R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b) Four (4) pieces of blade type string stabilizer body for 12 ¼โ€™๏ฟฝ diameter hole 8โ€™๏ฟฝ OD drill collar (fishing neck) diameter, NC 50 Box up x NC 50 Pin down, 2-13/16โ€™๏ฟฝ diameter bore, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
3.13
 Three-Blade type drill string stabiliser ๏ฟฝ?8 ½โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a)  Four (4) pieces of blade type near bit stabilizer body for 8 ½โ€™๏ฟฝ diameter hole 6 ½โ€™๏ฟฝ OD drill collar (fishing neck) diameter, NC 50 box up x 4 ½โ€™๏ฟฝ Reg. Box down, 2 13/16โ€™๏ฟฝ diameter bore, up end bored for 4R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b)  Four (4) pieces of blade type string stabilizer body for 8-½โ€™๏ฟฝ diameter hole 6 ½โ€™๏ฟฝ OD drill dollar (fishing neck) diameter, NC 50 Box up x NC 50 Pin down, 2 13/16โ€™๏ฟฝ diameter bore cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.14
Roller Reamer ๏ฟฝ?12 ¼โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
2 pieces of near bit rotary roller reamer body for 12 ¼โ€™๏ฟฝ hole three point, NC 50 Box up x 6-5/8โ€™๏ฟฝ Reg. Box down, up end bored for 5F-6R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.15
Roller Reamer ๏ฟฝ?17 ½โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
3 pieces of near bit rotary roller reamer body for 17 ½โ€™๏ฟฝ hole, three point, 6 5/8โ€™๏ฟฝ Reg. Box up x 6 5/8โ€™๏ฟฝ Reg. Box down, up end bored for 5F-6R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.16
Roller Reamer ๏ฟฝ?26โ€™๏ฟฝ Hole
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
1 piece of near bit rotary roller reamer body for 26โ€™๏ฟฝ hole, three point, 6 5/8โ€™๏ฟฝ Reg. Box up x 6 5/8โ€™๏ฟฝ Reg. Box down, up end bored for 5F-6R float valve, cast steel thread protectors.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
3.17
Core Barrel ๏ฟฝ?for 8 1/2๏ฟฝ?hole
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Core Barrel shall be 6-1/2๏ฟฝ?OD and 30 ft long complete with:
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Elevator lift sub
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Outer Barrel Head 
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Stabilizer
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 Outer barrel 
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 Corehead 
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Inner barrel head assembly
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Inner tube(s)
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 Shoe assembly
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
core chather
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Thread protector
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Tool box with handling tools
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 A set of spare cutters, core catchers etc
YES
ใ€€/FONT>
ใ€€/FONT>
4.0
ใ€€/B>
DOWNHOLE FISHING TOOLS 
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Series 150 Bowen releasing and circulating over-shots (or equivalent) , suitable for fishing in 17-1/2๏ฟฝ? 12-1/4๏ฟฝ?and 8-1/2๏ฟฝ?holes, one (1) of each. The over-shots shall be complete with spiral grapples, guides and pack offs to suit.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Drilling Jar,   size: 6-1/2๏ฟฝ?OD.  
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Fishing Jar, 6-1/2๏ฟฝ?OD 
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Bumper sub, 6-1/2๏ฟฝ?OD
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
12-1/4๏ฟฝ?hole junk sub 6-5/8๏ฟฝ?Reg/Box connection, Range 9-5/8๏ฟฝ?to 10-5/8๏ฟฝ?OD        
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
8-1/2๏ฟฝ?hole junk sub 4-1/2โ€IF Reg/Box connection, Range 7-1/2๏ฟฝ?to 8-1/4๏ฟฝ?OD                                                                                                                                                                                                      
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Reverse Circulation junk basket, size 10-1/4๏ฟฝ?to 11-5/8๏ฟฝ?OD with 6-5/8๏ฟฝ?Reg Pin Connection.         
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Reverse Circulation junk basket, size 7-1/2๏ฟฝ?to 8-1/4๏ฟฝ?OD with 4-1/2โ€IF Reg Pin Connection
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Fishing Magnet 10-3/4๏ฟฝ?to 11-5/8๏ฟฝ?OD with 6-5/8๏ฟฝ?Reg Pin Connection.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Fishing Magnet 7-1/2๏ฟฝ?to 8-1/4๏ฟฝ?OD with 4-1/2๏ฟฝ?Reg Pin Connection
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Taper Tap 6-3/8๏ฟฝ?OD
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Junk milling tools size 12๏ฟฝ?with 6-5/8 Reg Pin connection, 8-1/4๏ฟฝ?with 4-1/2IF Pin connection, one (1) of each.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Flat mill for 8-1/2๏ฟฝ?hole.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Impression blocks O.D. Tool: 11-3/4๏ฟฝ? 8๏ฟฝ? one (1) of each.๏ฟฝ?/FONT>
YES
ใ€€/FONT>
ใ€€/FONT>
5.0
ใ€€/B>
 DIRECTIONAL DRILLING EQUIPMENT
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 Mud motor for water based mud, 7-3/4๏ฟฝ?           
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Mud motor for aerated mud, 7-3/4๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Mud motor for water based mud, 6-1/2๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Mud motor for aerated mud, 6-1/2๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Non-magnetic drill collar, 6-1/2๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Two (2) Non-magnetic drill collar, 8๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
One (1) Short drill collar, 6-1/2๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
One (1) Short drill collar, 8๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Two (2) Single shot kits.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
One (1) Orientation Sub 6 ½๏ฟฝ?OD (0.5 ๏ฟฝ?2.5 degree)   
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
One (1) Orientation Sub 8๏ฟฝ?OD (0.5 ๏ฟฝ?2.5 degree)
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
One (1) Wire line winch c/w 4000 m line
YES
ใ€€/FONT>
ใ€€/FONT>
6.0
ใ€€/B>
AERATED DRILLING EQUIPMENT
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
6.1
Primary Compressors and Booster
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The equipment shall have an overall rated capacity of at least 4500 cubic feet/minute of air at a MAWP of 2200 psi at an elevation of about 2000 metres above sea level and a temperature range of 25 to 30 degrees Celsius.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The primary compressors shall comprise of five (5) each rated at a minimum of 900 cfm @ 350 psi and two (2) booster compressors each rated at least 2140 cfm @ 2200 psi. The aerated drilling package shall also include the air flow-meters (calibrated to read airflow rates in cubic feet per minute), orifice plate, manifold, air temperature gauge, pressure gauges etc.
ใ€€/FONT>
Air compressor system,Sullair DLQ980XHAF,
Exhaust Pressure๏ฟฝ?50psi๏ฟฝ?BR>Power๏ผšCAT C15 diesel motor๏ฟฝ?36KW๏ผ‰๏ผŒRated air discharge
๏ฟฝ?80CFM๏ฟฝ?nbsp;                                The rated discharge capacity is 900cfm,and the total rated discharge of the five compressors is 4500cfm; While the 4500cfm could just meet the requirements of Max. Casing ID 17"๏ฟฝ?If you want to meet the Casing ID 20"๏ผŒanother three Air Compreeors should be equipted๏ผŒthen the total discharge capacity could be ๏ฟฝ?840cfm๏ฟฝ?/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The ratings of associated equipment, including foam injection pump, shall match those of the compression equipment for the normal range of industry requirements. The engines driving the compressors shall be turbo charged and preferably Caterpillar. The preferred make of the compressors and booster units are Sullair or Ingersoll Rand.
YES๏ฟฝ?/B>brooster system,Cooper CFA34
Output Pressure๏ผšโ‰ง2500psi
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
6.2
Detergent (Soap) Injection Pumps
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Triplex injection Pump and Mixing Tank, Shall be capable of delivering 66 gal/min at 3,000 psi for the preparation and injection of foaming mixture, and 
YES, Pump Unit๏ผˆwith Tank and Pharmaceutical Pumps๏ฟฝ?3NB๏ฟฝ?50
Rated Pressure๏ฟฝ?3000psi
Rated displacement๏ฟฝ?420L/min
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 Pneumatic Chemical/Soap Injection Pump: Shall be capable of delivering 7 gal/min at 3,000 psi for the injection of neat soap into the air flow line.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
6.3
Rotating Blowout Preventers and Banjo Box
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Rotating Blowout Preventers (RBOPโ€™s) and Banjo Box are required for incorporation into a BOP stack comprised of equipment described in Clause 2.2.16 of these specifications, in the following order (from bottom), a flange, ram BOP, Banjo box, annular BOP, RBOP.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
RBOPโ€™s required are:
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 a)1 only 21 ¼โ€™๏ฟฝ x 2000 psi single rubber- Grant Model 8068 or equivalent , c/w six (6) spare stripper
ใ€€/FONT>
RBOP๏ผšXF54-14-10.5/21,
Flange connection bottom๏ฟฝ?1 1/4";
Dynamic Pressure๏ฟฝ?500psi ;   Static Pressure๏ฟฝ?000psi;c/w six (6) spare stripper Rubbers.  
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
 b)1 only 13 5/8โ€™๏ฟฝ x 5000 psi single rubber ๏ฟฝ?Grant Model 7068 or equivalent, c/w twelve (12) spare stripper Rubbers.
ใ€€/FONT>
RBOP๏ผšXF35-10.5/21
Flange connection bottom๏ฟฝ?3-5/8";
Dynamic Pressure๏ฟฝ?500psi;         Static Pressure๏ฟฝ?000psi;c/w twelve (12) spare stripper Rubbers.
ใ€€/FONT>
ใ€€/B>
6.4
 Blooie Lines and Cyclone Separator
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The separators shall be designed to separate air and steam from the liquids in the drilling returns, and to discharge the liquids to a shale shaker situated over a mud tank. They shall be capable of separating a fluid flow of about 450 cubic metres/minute of air/steam and 2000 litres/minutes of liquid, and of withstanding a total throughput of 900 cubic metres/minute of air/steam and 2000 litres/minute of liquid.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Blooie Lines shall be capable for discharging both to the separator and through a waste line terminating at ground level into a waste pit approximately 30 metres from the wellhead. 
ๆŽ’ๅฑ‘็ฎก็บฟๅบ”่ƒฝๆŽ’ๆ”พๅˆฐๅˆ†็ฆปๅ™จๅ’ŒๅบŸๆฐด็ฎก็บฟๅˆฐๅœฐ้ขไธŠ็š„ๅบŸๆฐดๆฑ ๏ผŒๅคงๆฆ‚ไปŽไบ•ๅฃๅˆฐๅœฐ้ข30็ฑณ๏ฟฝ
YES
ใ€€/FONT>
ใ€€/FONT>
7.0
ใ€€/B>
MAIN CEMENTING EQUIPMENT                                                                                                                                         
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Truck mounted twin cementing unit with recirculation cement mixing system comprising of:
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.1
(a)High pressure pumping system:
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Two single acting horizontal positive displacement triplex pumps, 400 BHP, maximum flowrate ๏ฟฝ?m3/min, nominal maximum working pressure ๏ฟฝ?11,300 psi and centrifugal pumps.
YES, Plunger Pump๏ผšTPH400 ๏ฟฝ?sets
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The high-pressure pumping system consists of two (2) deck-mounted Diesel engines and two (2) deck-mounted transmissions. Caterpillar engines are preferred.     
YES, CATERPILLAR C13  Generator set๏ฟฝ?sets
Allison HD4700 OFS transmition box๏ฟฝ?sets
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The pumps, which shall be horizontal triplex single acting plunger pumps, shall consist of fluid ends and power ends. They shall be characterized by their compactness, lightweight, high efficiency and ease of maintenance. The power ends shall have a welded housing made of alloy steel plates. The fluid ends shall be forged alloy steel. The pumps shall be equipped with hard surface plungers and shall be capable of being utilized for pumping of cement, acid, water, drilling fluid, and other fluid.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b)Fluid handling system:
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The fluid handling system includes a two open topped displacement tanks 22 BBL (3.5m3) total capacity (11 BBL [1.75m3] each compartment) calibrated holding tanks with all fill low pressure manifolding, release manifold and high pressure discharge manifold and three (3) centrifugal pumps.
YES, Measurement tank๏ฟฝ?2bbL๏ฟฝ?sets
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
(c)Cement mixing system:
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Installed on the unit is a complete recirculating mixing chamber, mixing tub, densiometer (8 to 22pounds per gallon ๏ฟฝ?ppg) with back-up (emergency) low-pressure jet mixing system.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
(d) Control and monitoring console
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The unit shall be installed on a centrally located walkway so that the operator will have a clear and unhindered view of the gauges console. The console will be made from corrosion resistant material.All labeling will be in English Language.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.2
Bulk (powder) cement transportation truck, c/w 15-ton capacity cement tank and unloading compressor.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.3
Bulk cement storage silos 2 x 24 m3 and 4 x 45 m3 capacities. The 24 m3 silos shall be on the rig site and the four 45 m3 shall be placed on a central bulk cement storage and dry blending yard.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.4
Scale tank (weighing tank) complete with load cell.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.5
 Bulk dry cement blending (mixing) tank.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
GENERATOR CONTROL / Power limitation
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.6
Air compressor for unloading cement received from the factory.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.7
Skid mounted portable cement slurry laboratory (complete with consistometer, weighing scales, stirrer etc).
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.8
Dry additive (cementing chemicals) mixing unit complete with cutting table.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.9
Conventional buttress threaded cementing heads for 20๏ฟฝ? 13-3/8๏ฟฝ?and 9-5/8๏ฟฝ?casing complete with manifold, high pressure piping (swivel chicksans), pressure gauges, flow-meters, safety valve, tees etc.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
7.10
Any other equipment required for the cementing equipment to be complete.
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
8.0
ใ€€/B>
MECHANICAL HANDLING EQUIPMENT, TRAILERS AND VEHICLES 
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
8.1
50-ton Truck Mounted Crane ๏ฟฝ?2 units
YES, QY50K-I,SINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
50  ton  truck  mounted  rough  terrain  crane,  with  independent  engine  for  crane  operation.  Caterpillar engines are preferred.
YES, QY50K-I,SINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
8.2
15-ton Rough Terrain Forklift Truck 
CPCD160-Cu1๏ผŒHELI FORKLIFT COMPANY
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Rough terrain forklift, 150 HP turbocharged diesel engine, 15 ton lifting capacity at 600 mm load centre, maximum lifting height of 4 metres, mast tilt: 15 degrees forward and 12 degrees backward. 12.00 x 20,18 PR tyres.
ใ€€/FONT>
Rated Lifting Weight๏ฟฝ?6T
Maximum lifting height๏ฟฝ?M                                             Mast tilt: 6degrees forward and 12 degrees backward.
ใ€€/FONT>
ใ€€/B>
8.3
 6 x 6 Tractor Unit  - 2 units   6 x 6
 ZZ4257N3557A๏ผŒSINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
6 x 6 tractor unit suitable for โ€œoff-road๏ฟฝ?drilling rig shifting application (rig size of 1500 HP). At least 350 HP turbocharged  diesel  engine  with  engine  brake.  Equipped  with 50  tonne  winch, headache rack and tail roller. Opening rear cab window. Trailer brake connections. 12.00 R 20 tyres.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
8.4
 6 x 6 Gin Pole truck
SINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
6 x 6 oilfield type truck configuration, suitable for โ€œoff-road๏ฟฝ?drilling rig shifting application (rig size of 1500HP). At least 350 HP turbocharged diesel engine  with engine brake. Approximately 20 ft long x 8-1/2  ft wide flat deck, equipped with retractable fifth wheel coupler, 50 ton winch, headache rack, gin poles and
tail roller. Opening rear cab window. Trailer brake connections. 12.00 R 20 tyres.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
8.5
Flat Deck Trailer ๏ฟฝ?2 units
SINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Flat Deck Trailer with pneumatic brakes, 50 ton capacity, approximately 40ft long x 8-1/2 ft wide x 5 ft high deck with full width tail roller and kingpin. Suitable for use with items 8.3 and 8.4. 12.00 R 20 tyres.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
8.6
 Low Flat Deck Trailer
SINOTRUCK
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Low-Bed Trailer with gooseneck and kingpin, pneumatic brakes, 50 ton capacity, load bed approximately 26 ft long x 8-1/2  ft wide x 2-1/2  ft high, with full width tail roller. Suitable for use with item 8.3. 12.00 R 20 tyres.
YES
ใ€€/FONT>
ใ€€/FONT>
9.0
ใ€€/B>
INFORMATION TO BE PROVIDED BY TENDERER
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Tenderer shall provide the following information to KenGen within two months calculated from the date of KenGenโ€™s Letter of Acceptance of tender.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
a) Layout of equipment, drawn to scale.    
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
b) Detailed drawings of substructure, mast and drawworks.    
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
c) Details of interconnecting pipe work and valving for mud, cement and air injection systems.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
d) Circuit and wiring diagrams for all electrical equipment.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
e) Detailed dimensional drawings of drilling wellheads (BOP Stacks for 17 ½๏ฟฝ?and 12 ¼๏ฟฝ?respectively).
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
f) An erection and commissioning programme detailing on-site activities commencing upon the arrival of the first truckload of equipment at the Site.
YES
ใ€€/FONT>
ใ€€/FONT>
10.0
ใ€€/B>
TOOLS AND APPLIANCES 
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
Tenderers shall list the following tools and appliances, which shall be provided under this contract.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
a) One  set  of  any  special  tools  or  gauges  required  for  the  routine  operation  and  maintenance  of  the equipment.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
b) One set of any special tools or gauges required for dismantling, re-assembling, checking or adjusting (but not for routine maintenance) or whole of the equipment covered by the Contract.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Each tool or appliance shall be clearly labeled with its size and/or purpose and shall be handed over in an โ€œas new๏ฟฝ?condition.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The sets of tools and appliances under (a) and (b) shall be provided in robust toolboxes.  The boxes shall be lockable.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
All tools and appliances shall be handed over to KenGen at the time of Issue of the Certificate of Acceptance.
YES
ใ€€/FONT>
ใ€€/FONT>
11.0
ใ€€/B>
SPARE PARTS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The Tenderers shall furnish a proposal containing, in the manufacturerโ€™s opinion, the recommended list of high usage spare parts likely to be required during the initial 2 (two) years  of operation of the equipment under Sections  I,  V,  VI  and  VII.    The  Tenderer  should  bear  in  mind  the  relative  remoteness  of  the  Site  when recommending the schedule of spare parts. The proposal must list each item and quote the unit price and should not exceed 5% of the value of the equipment offered.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Where applicable, all items shall be provided with sufficient spare/replaceable parts for two years๏ฟฝ?operation of  the  equipment. The  basis  of  selection  should  be  a  total  of  12,000  hours  of  rig  plant  operation  and  the drilling of a total of 36,000 metres of hole in hot volcanic formations.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
All spare parts delivered under the Contract shall be marked individually and clearly to identify the item for which they are supplied.
YES
ใ€€/FONT>
ใ€€/FONT>
12.0
ใ€€/B>
STANDARDISATION
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
Wherever  possible,  all  Goods  shall  be  selected  with  a  view  to  standardizing  brands  and  providing  the maximum interchangeability of spare parts.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Goods shall in all respects conform to high standards of engineering design and workmanship and shall comply with current applicable Codes and Standards.
YES
ใ€€/FONT>
ใ€€/FONT>
13.0
ใ€€/B>
COMPLIANCE WITH THE API STANDARD
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Wherever  possible,  materials,  equipment  and  design  shall  be  in  accordance  with  the  American  Petroleum Institute Standards current at the tender date, or, alternatively, with such authoritative standards appropriate to the country of manufacture as in the opinion of KenGen ensures an equivalent or higher quality than the API standard last published prior to the date of closing of the tenders.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
If the Tenderer offers material, equipment, design calculations or tests which conform to standards other than those published by the API, full details of the Standard, insofar as they affect the design or purpose of the equipment, shall be stated in the tender, and the Tenderer shall provide one copy of the relevant standard (in English) upon the request of KenGen.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
Tenderers๏ฟฝ?nbsp; with  less  than  eight  (8)  years  experience  in  manufacturing  main  rig  equipment  under  API certification shall not be considered. Tenderers shall submit copies of current API certificates for the following main equipment:
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a) API Spec 7K for drawworks, rotary Table, mud pumps, slips.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
b) API 4F and 8C for Mast and substructure.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
c) API 8A for crown block, travelling block, hook, swivel, elevators, links.  
YES
ใ€€/FONT>
ใ€€/FONT>
14.0
ใ€€/FONT>
INSTRUCTION MANUALS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
14.1
GENERAL
The Tenderer shall provide KenGen with complete and detailed instruction manuals for the equipment, written in the English language.
The manuals shall be provided as two separately bound sets.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
a) Installation, Operation and Maintenance Manuals.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
d) Spare Parts Manuals
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
At least one complete set of manuals shall be made available to KenGen during the period of Site erection and two further sets at the time of the Issuance of the Certificate of Acceptance.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
14.2
INSTALLATION, OPERATION AND MAINTENANCE MANUALS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
T, he manuals shall include basic step-by-step instructions on how to operate the equipment both with regard to individual items and to systems under all patterns of normal and abnormal conditions.  The instructions are to include reference to the applicable operation limits.
There  shall  be  a  section  of  monitoring  routine  efficiency  and  operating  conditions,  giving  normal  operating limits.
The manuals shall include, for all of the equipment supplied.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a) The step-by-step procedures for maintenance including the SCR rig electric systems
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
b) The checks to be made, including expected values and tolerances
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
c) The spares required
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
d) Drawings and schematics sufficient to illustrate the maintenance  procedures, spares and special tools include where possible exploded views and isometrics to give maximum instructional content including electrical circuitries.
YES
ใ€€/FON, T>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
f)Lubricant schedule.
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
Drawings and diagrams shall be reduced to a convenient size and bound into the manuals.  The reduced size drawings and diagrams shall be complete, legible and suitable for reproduction.  Drawings, which are referred to several times in the text, shall be either of the โ€œthrow clear๏ฟฝ?type or be repeated as necessary if the text is bulky, it shall be divided into conveniently sized volumes.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
There  shall  also  be  provided  checklists  and  procedure  sheets  suitable  for  each  periodic  inspection  and  for performance monitoring, in loose-leaf format, for use by the operators and maintenance staff.
YES
ใ€€/FONT>
ใ€€/FONT>
15.0
ใ€€/FONT>
SPARE PARTS MANUALS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Comprehensive  spare  parts  manuals  shall  be  provided.    They  shall  include  a  list  of  manufacturers๏ฟฝ?nbsp; part numbers and drawings of the equipment with part numbers identified against each component.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
A table of parts required for each maintenance inspection shall also be provided in the manual.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
LUBRICATION
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Tenderer shall provide, at its own expenses, all lubricants and greases for the first filling of the equipment at Site, including flushing oils where necessary.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
A complete schedule of recommended oils and other lubricants required for all components of the equipment shall be furnished by the Tenderer, the number of different types of lubricant shall be kept to a minimum, and the Tenderer should endeavor, wherever possible, to nominate oils and other lubricants available in Kenya.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The  Schedule  shall  be  submitted  to  KenGen  for  approval  in  time  for  incorporation  into  the  operating  and maintenance instructions, and in time to permit KenGen to obtain the necessary supplies.
่ฏฅ่กจๆ ผๅบ”ๅฝ“ๆไบค็ป™KenGen ๅ…ฌๅธไปฅๅŠๆ—ถ่Žทๅพ—ๆ‰นๅ‡†๏ผŒไปฅ็ซ‹ๅณๅ‚ไธŽๅˆฐๆ“ไฝœๅ’Œ็ปดๆŠค่ฏดๆ˜Ž๏ผŒๅนถไธ”ไฝฟKenGenๅณไฝฟ่Žทๅพ—ๅฟ…่ฆๆ”ฏๆŒ๏ฟฝ?/FONT>
YES
ใ€€/FONT>
ใ€€/FONT>
16.0
ใ€€/FONT>
RATING PLATES, NAME PLATES AND LABELS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Each major item of equipment shall have permanently attached to it in a conspicuous position, a rating plate of approved  size  and  pattern. It  shall  be  of  a  non-corrosive  material  upon  which  shall  be  engraved  any identifying name, type or serial number, year of manufacture, together with details of the loading conditions under which the item or equipment in question has been designed to operate.
YES
ใ€€/FONT>
ใ€€/FONT>
17.0
ใ€€/FONT>
MATERIAL CERFITICATES
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Material Test Certificates and Mill Inspection Certificates shall be provided for all items of supply, which are to be used down hole.
YES
ใ€€/FONT>
ใ€€/FONT>
18.0
ใ€€/FONT>
ERECTION AND CHECKING
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
a๏ผ‰Pre-shipment Erection
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The  Contract  shall  include  erection  and  testing  at  the  Supplierโ€™s  yard  prior  to  shipment.  Full  facility  and assistance shall be afforded by the Supplier for KenGen Engineers to carry out any necessary checks.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The  pre-shipment  erection  and  testing  shall  include  a  rig  up  and  performance  testing  of  the  structures, hoisting,  rotating  and  fluid  systems  as  prescribed  in  these  Technical  Specifications.   The  Supplier  shall  be responsible for all arrangements and costs in ensuring that this is carried out to the satisfaction of KenGen.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
b๏ผ‰On-site Erection
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The  Contract  shall  include  on-site  erection  and  testing  at  KenGenโ€™s  Site  after  delivery  of  the  Goods.  Full facility  and  assistance  shall  be  afforded  by  the  Supplier  for  KenGen  Engineers  to  carry  out  any  necessary checks.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The  on-site  erection  and  testing  shall  include  a  rig  up  and  performance  testing  of  the  structures,  hoisting, rotating and fluid systems as prescribed in these Technical Specifications.  The Supplier shall be responsible for all arrangements and costs in ensuring that this is carried out to the satisfaction of KenGen.
YES
ใ€€/FONT>
ใ€€/FONT>
19.0
ใ€€/B>
PRE-OPERATIONAL CHECKS AND TESTS
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
On completion of on-site erection, the Supplier shall ensure that all necessary tests, inspections, checks and necessary  adjustments  are  carried  out  on  all  equipment  to  demonstrate  adequately  that  the  equipment complies with the specification requirements and is ready for trial operation.   These tests are to include, but are not necessarily limited to the following:
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
a) The correct and reliable functioning of all electrical equipment.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
b)The   correct   and   reliable   functioning   and   collaboration   of   all   automatic   controls,   instrumentation, supervisory equipment and manual controls supplied under this Tender.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
c) Before starting, all bearings, shafts and other moving parts shall be checked for proper alignment.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
d) All coupling guards, belt guards and other personnel safety items shall be installed.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
e) All safety controls shall be checked for correct settings.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
f) All control valves shall be checked for correct valve action and seating and the controllers and positioners shall be initially adjusted to the predicted set point position.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
g) All control valves shall be checked for correct valve action and seating and the controllers and positioners shall be initially adjusted to the predicted set point position.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
h) Each lubricating oil system shall be flushed and the filters inspected.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
I) All belts, pulleys and sheaves shall be checked for correct alignment and belt tension.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
j) All cooling water and sealing system shall be flushed and checked for proper operation.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
k)  All fire fighting and personnel safety equipment shall be installed and operated.
YES
ใ€€/FONT>
ใ€€/FONT>
20.0
ใ€€/B>
SAFETY
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
Before any section of the equipment is operated, KenGen and the Supplier shall establish and agree on a system of ensuring the safety of personnel and equipment.   While the equipment is under the control of the Supplier, the Supplier shall be primarily responsible for all safety precautions.  When the equipment is under the control of KenGen, KenGen shall be primarily responsible for these precautions.
YES
ใ€€/FONT>
ใ€€/FONT>
21.0
ใ€€/B>
TRIAL OPERATION/COMMISSIONING OF EQUIPMENT
ใ€€/B>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
After erection and completion of the pre-operational checks and tests, all equipment having moving parts, all electrical apparatus and all equipment subject to pressure shall be given a trial operation.  The trial operation shall be carried out in strict accordance with the equipment manufacturerโ€™s recommendations.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The  trial  operation  of  the  equipment  shall  demonstrate  to  the  satisfaction  of  KenGen  that  there  are  no weaknesses in bearings, cooling systems, heat exchangers, and other such components, or any performance deficiencies which may later handicap the operation of the main rig systems and of the complete drilling rig.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The Supplier shall submit a written report to KenGen summarizing the observations and results of the trial operation and the specific deficiencies discovered which require additional work. The report shall indicate Whether or not a re-trial is required, but the Supplier will make the decision on whether a re-trial should be carried out.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
At the site, the trial operation/commissioning shall take the form of a โ€œreliability run๏ฟฝ?wherein the equipment will be  operated  under  actual  drilling  conditions  for  a  period  of  about  sixty  (60)  days,  or  until  it  has  drilled  one directional well to a total depth of about 3000 meters, whichever occurs earlier.   During the commissioning period, the equipment will be operated by the Supplier. During this commissioning period, KenGen drilling staff at  various  levels  will  be  attached  as  counterparts  to  the  Supplierโ€™s  staff  for  the  purpose  of  training  and takeover after the commissioning period.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
If any failure or interruption occurs in any part of the equipment covered by the tender due to or arising from faulty design, materials, workmanship, but not otherwise sufficient to prevent full use of the equipment, the trial period shall recommence after the Supplier has remedied the cause or defect to the satisfaction of KenGen.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/B>
The period of trial operation on Site shall commence as soon as in the opinion of KenGen, the pre-operational checks and tests detailed in Clause 13 have been satisfactorily completed.
YES
ใ€€/FONT>
ใ€€/FONT>
22.0
ใ€€/FONT>
SUPPLIERโ€™S PERSONNEL
ใ€€/FONT>
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The Supplier shall provide fully competent, qualified and experienced personnel to undertake the erection and commissioning of the equipment and for the training of KenGenโ€™s personnel in the operation and maintenance of the equipment.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The  curricula  vitae  (CVs)  of  the  personnel  shall  be  submitted  with  the  tender.   Each person assigned to perform the Services shall be competent in written and spoken English and shall be subject to the approval of KenGen, which approval shall not be unreasonably withheld.
YES
ใ€€/FONT>
ใ€€/FONT>
ใ€€/B>
ใ€€/FONT>
The  minimum  requirements  of  Supplierโ€™s  Personnel  to  the  training  and  initial  commissioning  stages  for  the equipment under Sections I, V, VI and VII are stipulated in Clause 7, Section E, under โ€œPreamble๏ฟฝ?
YES
ใ€€/FONT>
ใ€€/FONT>
Note:
Here the "YES" mean we could meet the requirement of the tender. The red words are the difference.
 
 




Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
[email protected]