BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Spare Parts  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Siemens Gas Turbine Generator  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
     MTU Cummins Perkins Volvo Diesel Generator  
     Power Plant Generator  
       Air Cooled Power Generator  
       low speed 125rpm/150rpm generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
     Cable&Wire  
     Electric Motor  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
     Drilling-Rig-for-Oil-Gas-Mining  

Diesel Generator Proposal

Power Plant Proposal

Home > Equipments > Drilling-Rig-for-Oil-Gas-Mining - 1500 HP RIG Technical Clarifications Page 1


 

1500 HP RIG Technical Clarifications Page 1

 

Item
Ken Gen Technical Specifications
Nature of Deviation by KERUI
Reason of Deviation by KERUI
Remark
1.0
 /B>
DRILLING PROGRAM
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Kenya Electricity Generating Company Limited (KenGen) has embarked on an ambitious drilling program to drill  several  geothermal  wells.  KenGen  therefore  intends  to  purchase  a  new  1500  HP  (minimum)  electric land  rig  complete  with  all  accessories  such  as  drill  string  tubulars,  fishing  tools,  directional  drilling equipment,  air-drilling  package,  well cementing  equipment  package,  mechanical  handling  equipment  and vehicles.
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The rig is required to drill deep geothermal wells within fractured volcanic formations and will be required to meet the following minimum hole and casing program.
 /FONT>
 /FONT>
 /FONT>
 /B>
1.1
20�?Conductor casing      
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
26�?hole shall be drilled to a depth of up to 80 meters; the hole shall be cased with 20�?94 lb/ft steel casing
back to the surface; this casing shall be cemented back to the surface.
 /FONT>
 /FONT>
 /FONT>
 /B>
1.2
13-3/8�?Anchor casing
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
17-1/2�?diameter hole shall be to between 300 to 450 meters; the hole shall be cased back to the surface
with 13-3/8�?54.5 lb/ft grade K55 steel casing; this casing shall be cemented back to surface.
 /FONT>
 /FONT>
 /FONT>
 /B>
1.3
9-5/8�?Production casing 
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
12-1/4�?diameter hole shall be drilled to a depth of about 500 to 550 meters and the hole will be kicked off and drilled directionally to a measured depth of about 1500 meters; the hole shall cased back to surface with 9-5/8�?47 lb/ft casing; this casing shall be cemented back to surface.
 /FONT>
 /FONT>
 /FONT>
 /B>
1.4
8-1/2�?Open hole
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
8-1/2�?diameter hole shall be drilled to measured depth of about 4500 meters; the hole shall be cased with 7�?26 lb/ft slotted liner extending up from the total depth to the 9-5/8�?casing shoe and run on a drill pipe. The slotted liner will not be cemented.
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The wells will be drilled with a water based bentonite mud or water only or aerated drilling fluids.
 /FONT>
 /FONT>
 /FONT>
2.0
 /B>
MAIN RIG EQUIPMENT
 /FONT>
 /FONT>
 /FONT>
 /B>
2.1
Rig Rating
 /FONT>
 /FONT>
 /FONT>
 /B>
 
a) Nominal depth with 5�?x 19.5 lb/ft, grade G105, range II drill pipe shall be 5,000 meters
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)   Capable of running 9-5/8�?x 47 lb/ft casing to 1500 meters with 50% overpull capacity
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Have a minimum racking capacity for 5000 meters of 5�?x 19.5 drill pipe.
YES
 /FONT>
 /FONT>
 /B>
 /B>
d)   Have a minimum of 1500 input horse power on the drawworks
YES
 /FONT>
 /FONT>
 /B>
2.2
Main Rig Specifications
 /FONT>
 /FONT>
 /FONT>
 /B>
2.2.1
Drawworks
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The specifications of the drawworks (certified to API 7K) are:   
YES, Model: JC50D(KERUI BRAND)
 /FONT>
 /FONT>
 /B>
 /B>
a)   Input Horsepower Rating: 1500 HP 
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)   Hoisting speeds: Four (4) 
YES, 4 Forward Gear  &4 Reverce Gear
 /FONT>
 /FONT>
 /B>
 /B>
c)    Drive: Two (2) Electric motors complete wit accessories
YES, Two (2) YZ08 Electric Motors, Rated Power:800KW,50HZ; Rated Speed:970rpm;
 /FONT>
 /FONT>
 /B>
 /B>
d)   Auxiliary electric brake    
YES, FDWS50(Air cooling),Max. Braking torque:75000N.m,Exciting Power:15KW,Exciting Current:40A
 /FONT>
 /FONT>
 /B>
 /B>
e)  Brake Control and Cooling systems respectively 
YES
 /FONT>
 /FONT>
 /B>
 /B>
f) Drum grooving: 1-3/8�?with lebus 
YES
 /FONT>
 /FONT>
 /B>
 /B>
g)   Nominal Rating (Depth Range): 4000-5000 m vertical   
YES
 /FONT>
 /FONT>
 /B>
 /B>
h)   Crown and floor saver system
YES
 /FONT>
 /FONT>
 /B>
2.2.2
Mast 
JJ450/45-K (KERUI BRAND)
 /FONT>
 /FONT>
 /B>
 /B>
The minimum specifications of the mast are:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   Open front type mast certified to API 4F and API 8C  
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)   Clear height: 148ft; Base width:
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Nominal capacity: 1,000,000 lbs   
YES
 /FONT>
 /FONT>
 /B>
 /B>
d)   Static hook load capacity (with 10 lines strung):Approximately 800,000 lbs   
YES
 /FONT>
 /FONT>
 /B>
 /B>
e)   Wind resistance with rated setback: 100 mph   
 /B>
Rated setback: 80 mph;                                                  Without setback capacity�?00mph
 /FONT>
 /B>
 /B>
f) Racking capacity: 5000 metres of 5�?drill pipe and 300 metres of 6 ½ �?drill collars    
YES
 /FONT>
 /FONT>
 /B>
 /B>
g)   450 ton crown Block   
YES�?/B>TC450,Max. Hook load:4500KN,Pully OD: Ø1524mm�?0"�? Pully quantity: 7PCS, Wire-line Dia.:Ø35mm (1-3/8");
 /FONT>
 /FONT>
 /B>
 /B>
h)   Casing stabbing board and deadline anchor  
YES�?/B>Model:YFZ20/5,Jaw Dia.:5"�?0"�?The max. lifting height: 5M�?nbsp;                                Lifting Weight:200Kg,Max.  Flow:14L/min,Rated Pressure:16Mpa
The Anchor Model:JGZ41,Max. deadline tension:410KN,The load of the 12 lines strung:4920KN
 /FONT>
 /FONT>
 /B>
 /B>
i) Vapor proof and explosion proof electric lighting lamps preferably Rig-A-lite or equivalent
YES�?/B>(KERUI BRAND)
 /FONT>
 /FONT>
 /B>
 /B>
The mast shall be designed to accommodate a Top Drive, preferably a Tesco unit. The cost of the Top Drive will  be  quoted  separately  and  KenGen  reserves  the  right  to  include  or  exclude  the  Top  Drive  in  tender award.
YES
 /FONT>
 /FONT>
 /B>
2.2.3
Substructure and Accessories
DZ450/10.5-S (KERUI BRAND)
 /FONT>
 /FONT>
 /B>
 /B>
To accommodate the mast, drawworks, electric drive group, rotary beams, rotary table, etc.   The API 4F certified substructure and accessories shall include but not limited to:
YES
 /FONT>
 /FONT>
 /B>
 /B>
a)   Substructure overall height: Approximately 30 feet
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)  Clear height under Rotary beams: Approximately 25 feet  
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Setback capacity: Approximately 600,000 lbs 
YES
 /FONT>
 /FONT>
 /B>
 /B>
d)   Rotary capacity: Approximately 800,000 lbs  
YES�?/B>(Rotary table load capacity�?,305,000 lbs�?B>
 /FONT>
 /FONT>
 /B>
 /B>
e)   Equipped with BOP handling system, hydraulic drill line spooler etc. 
YES
 /FONT>
 /FONT>
 /B>
 /B>
f) Equipped with rig skidding system (beams, jacks etc) to allow multi -pad drilling  
YES
 /FONT>
 /FONT>
 /B>
 /B>
g)  Complete set of rig matting for substructure and mud pumps
YES
 /FONT>
 /FONT>
 /B>
 /B>
h)   Pipe racks, 30 ft long x 3 ft high, 6 pieces 
YES
 /FONT>
 /FONT>
 /B>
2.2.4
Rig Power Plants (Generator Sets and Electrical System)
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
To include generating units and accessories for a 1500hp land rig.  These will include SCR Control modules to  provide  power  to  rotary  table,  drawworks  and  mud  pumps�?nbsp; DC  electric  motors.  The  system  will  also include engine/generator control cubicles, synchronizing system, ground detection system, hand-off circuit, power limit system, SCR PLC cubicle, Driller’s console and foot brake, Drawworks dynamic brake, voltage feeder and motor control centres for powering other auxiliary AC motors, etc.
YES�?/B>Four(04) sets CAT3512B   Generator sets�?BR>The Rated Output Power�?200KW�?BR>The Rated Voltage�?00V�?0Hz�?500RPM,SCR-MCC Room;
 /FONT>
 /FONT>
 /B>
 /B>
The generators to be supplied should provide electrical power output at 600 V, 3 phase, 50 HZ. All other auxiliary motor driven loads will be rated 415 V, 3 phase and 50 HZ while lighting loads will be rated at 240 V, single phase and 50 HZ.
YES,One(01) set VOLVO Generator�?00KW�?0Hz
 /FONT>
 /FONT>
 /B>
 /B>
The rig lighting system shall be complete with Rig-A-Lite system (or equivalent) covering all areas such as the mast, rig floor, pipe rack area, engine, mud pumps and tanks areas. The lamps shall be vapor proof, explosion proof and well secured to endure mast and general rig vibrations.
YES, Rated Voltage�?220V�? phase�?BR>Rated Frequency�?50Hz
Explosion-proof grade�?be used for  dâ…¡BT4 Place;
 /FONT>
 /FONT>
 /B>
2.2.5
Rig Air Compressors and Accessories
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Two (2) Air Compressors, (approximate capacity- 257 CFM at 125 PSIG, 400 GAL vertical and horizontal receivers (2), 11 HP cold start electric start system and Drier).  It will be the responsibility of the Supplier to ensure that adequate air supply is available to operate the drilling system instrumentation.
Two(02) sets  Screw comressors
:SULLAIR LS12-50HH 
Rated Exhaust Pressure:145psi�?MPa),
Nomina1 Displacement:232gal/min
Air Dryer:SRC-240
Cold-start air compressor:Volume flow:35.3cfm,Exhaust pressure:1MPa(143PSI.)
Air Tank�?40gal*2; Air tank�?50gal
 /FONT>
 /B>
2.2.6
Main dimensions
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   The  complete  rigs,  including  normal  cementing  equipment  set  up,  tubular  lay  down  areas, supervisors shacks and mechanics shop should have a site space requirement of about 120 metersx 80 meters.
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)   The mast shall have sufficient height to handle treble tubular racking
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    The distance from the ground level to the underside  of the substructure beams shall be not less than twenty five (25) feet. This is critical in accommodating the 13-5/8�?Double Ram BOP, 13-5/8�?annular BOP, drilling spool and the 13-5/8�?Rotating Head (for air drilling operations).
YES
 /FONT>
 /FONT>
 /B>
2.2.7
Diesel Engines 
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
All  diesel  engines  must  be  suitably  rated  for  operation  at  an  altitude  over  2000  meters  above  sea  level preferably with turbo charging. Caterpillar engines are preferred.
YES, Four(04) sets CAT3512B Generator sets�?BR>Rated Output Power�?200KW�?BR>Rated Voltage�?00V�?0Hz�?500RPM;
 /FONT>
 /FONT>
 /B>
2.2.8
Mud Pumping Equipment
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The mud pumping equipment shall comprise but not limited to the following:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   Mud pumps: Two (2) Triplex mud pumps, each rated at 1600 input horsepower complete with the following:  -  rod  lubricating  pumps,  Strainer  cross,  pulsation  dampener,  jib  crane,  stroke  counter, safety relief valves, 6-½ï¿½?liners, rotary hoses, pressure gauges, discharge hoses etc.
YES, F-1600, Rated power:1600HP,Rated Strock Frequency:120Spm�?Max. WP:5000Psi,Max. Cylinder Dia.:180mm,Min. Cylinder Dia:130mm, Suction port:12"Flange,Discharge port
:5" Flange;
 /FONT>
 /FONT>
 /B>
 /B>
b)  Motor pump drives
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Electric motors
YES, Four(04) sets DC Motors,YZ08DC, the rated power :800KW�?0HZ, rated rotary speed:970rpm
 /FONT>
 /FONT>
 /B>
 /B>
d)   Super-Charging centrifugal pumps and suction manifold
YES
 /FONT>
 /FONT>
 /B>
 /B>
e)   Supply of 6 sets of liners, spare valves, springs and repair kits for pulsation dampener
YES
 /FONT>
 /FONT>
 /B>
 /B>
f) Two submersible pumps (for re-circulating water from the ponds back to the mud tanks)
YES, Gorundfos Water pump: Two(02) sets�?BR>SP30-20, Flow capacity
�?0m3/h �?BR>Pressure head�?55m�?BR>Power�?8.5KW
 /FONT>
 /FONT>
 /B>
 /B>
g)   Any other consumables to maintain the pumps for two years. 
YES
 /FONT>
 /FONT>
 /B>
2.2.9
High Pressure Mud Piping
YES
 /FONT>
 /FONT>
 /B>
 /B>
High pressure (5000 psi WP) piping system for two pumps and dual standpipe, 5,000-psi jumper and rotary hoses. The stand pipe shall be rated to 5,000 psi complete with 4�?x 5,000 psi Gate valves, 2�?x 5,000 psi gate valves and Cameron Type D (or equivalent) pressure gauge range 0 to 5,000 psi.
YES, Double Standpipe:DN�?"
WP�?5Mpa
Rotary Hose�?"�?5Mpa�?5ft
 /FONT>
 /FONT>
 /B>
2.2.10
Mud System
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Mud systems (capacity approximately 1600 bbl) �?shaker, intermediate, suction, mixing and water tanks.
YES
 /FONT>
 /FONT>
 /B>
 /B>
Mud agitators.
YES
 /FONT>
 /FONT>
 /B>
 /B>
Trip tank, degasser and choke manifold.
YES
 /FONT>
 /FONT>
 /B>
 /B>
Solids control equipment �?shale shakers, desander, desilter, vacuum degasser and mud mixing pumps. Cooling Tower, 800 GPM, Temp. in �?85 deg. C, out �?35 deg. C (Electric motor driven)
YES
 /FONT>
 /FONT>
 /B>
2.2.11
Instrumentation
M/D Tcotco
 /FONT>
 /FONT>
 /B>
 /B>
Drilling instrumentation system to measure, record and display critical drilling and mud parameters shall be provided.  The instrumentation shall include but not limited to the following:
YES
 /FONT>
 /FONT>
 /B>
 /B>
a) 24 Hour Drilling Rate Recorder (Geolograph)
YES
 /FONT>
 /FONT>
 /B>
 /B>
A  manual  geolograph  with  6  �?nbsp; 8  pens  and  24  hour  charts  shall  be  provided.  An  electronic geolograph (computer display) alone will not be adequate and hence not be acceptable in absence of  a  manual  geolograph.  The  electronic  geolograph  shall  have  shock  proof  rubbers  t, o  cushion  it from rig vibrations.
YES
 /FONT>
 /FONT>
 /B>
 /B>
The recorder shall include but not limited to the following:
 /B>
 /FONT>
 /FONT>
 /B>
 /B>
penetration rate
YES
 /FONT>
 /FONT>
 /B>
 /B>
weight (weight on bit and total string weight)
YES
 /FONT>
 /FONT>
 /B>
 /B>
 pump pressure
YES
 /FONT>
 /FONT>
 /B>
 /B>
 pump strokes per minute
YES
 /FONT>
 /FONT>
 /B>
 /B><, /B>
 rotary table torque
YES
 /FONT>
 /FONT>
 /B>
 /B>
 rotary table revolutions per minute (RPM)
YES
 /FONT>
 /FONT>
 /B>
 /B>
b) Weight Indicator (mechanical).
YES
 /FONT>
 /FONT>
 /B>
 /B>
c) Driller’s  Console Instrumentation (RPM, Rotary Torque, Mud Pump Stroke Sensors, Return mud flow transmitter, Drawworks ROP/Height Sensor, Pit level transmitter, Hook load transmitter, Tank level transmitter, Instrumentation rig up and cables, Flow Line Pressure, Flow Line Temp etc).
YES
 /FONT>
 /FONT>
 /B>
 /B>
d)   Deviation Instruments. Totco Double recorder 0 �?8 degrees or equivalent.  
YES
 /FONT>
 /FONT>
 /B>
 /B>
e)   Any other instrument necessary for the Driller’s Console.
YES
 /FONT>
 /FONT>
 /B>
2.2.12
Hoisting Equipment (Traveling Equipment) 
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The  hoisting  equipment  manufactured  to  API  8A  specification  shall  include  crown  block,  traveling  block, hook; swivel, elevator links, Kelly, Kelly saver subs, Kelly valves, Kelly cocks (upper and lower) etc with the following ratings and sizes:
YES
 /FONT>
 /FONT>
 /B>
 /B>
a)   Crown block: load capacity: 450 ton   
YES,TC450,Max. Hook load: 4500KN,Pully OD:Ø1524mm�?0"�?Pully Quantity:7,                           Wire-line Dia:Ø35mm (1-3/8")
 /FONT>
 /FONT>
 /B>
 /B>
b)  Travelling block: load capacity: 450 ton   
YES,YC-450,
Max. Hook Load:4500KN�?BR>Pully Quantity: 6�?nbsp;     
Pully OD:Ø1524mm�?0"),          
 Wire-line Dia:Ø35mm
 /FONT>
 /FONT>
 /B>
 /B>
c)    Hook: 450 ton  
YES, DG-450
Max. Hook Load:4500KN�?BR>Hook Mouth Opening Size:220mm                 
 Mouth Dia of Main Hook:180mm,
Mouth Dia of Sub-Hook:120mm�?nbsp;
 /FONT>
 /FONT>
 /B>
 /B>
d)   Swivel: 450 ton   
YES, SL-450
Max. Static Load:4500KN�?BR>Max. WP:35MPa�?BR>center tube Dia:75mm�?BR>Connector thread:Connect with the Kelly 6-5/8"REG-LH�?nbsp;                                                   Max. Rotary Speed:300rpm
 /FONT>
 /FONT>
 /B>
 /B>
e)  2-3/4�?x 72�? 350 ton elevator links
YES
 /FONT>
 /FONT>
 /B>
 /B>
f) 2-1/4�?x 84�? 250 ton elevator links
YES
 /FONT>
 /FONT>
 /B>
 /B>
g) 2 pieces per rig of API 5 ¼â€™ï¿½ nominal size hexagonal Kelly, 40 feet long with 3 ¼â€™ï¿½ bore, 6 5/8�?Reg 7 ¾â€™ï¿½ OD top connection, and NC 50, 6 1/8’� OD bottom connection.
YES
 /FONT>
 /FONT>
 /B>
 /B>
h) Kelly spinner: Varco 6600 or equivalent air operated with maximum torque 1200 ft-Ibs at
110 rpm free spinning.
YES, be included in the Swivel (LANZHOU CHINA)
 /FONT>
 /FONT>
 /B>
2.2.13
Rotary Tables and Drives
YES, Model:ZP375
Rated Static Load:5850KN�?BR>Max. Rotary Speed:300rpm
Max. Working Torque:33000N.m
 Opening Dia.:952.5mm�?7-1/2"�?BR>Transmission ratio:3.56
 /FONT>
 /FONT>
 /B>
 /B>
The rotary table and drives shall be as follows:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   Rotary table with 27 ½ï¿½?or 37 ½ï¿½?opening built to API 7K specification.   
YES, Rotary table with 37 ½ï¿½?opening built to API 7K specification
 /FONT>
 /FONT>
 /B>
 /B>
b)  Independent rotary table drive, two-speed  
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Electric motor   
YES, One (01) set DC Motor  YZ08DC
Rated Power:800KW�?0HZ
Rated Rotary Speed:970rpm
 /FONT>
 /FONT>
 /B>
 /B>
d)   Master  bushing  with  insert  bowls  for  20�?  13-3/8�?  9-5/8�?nbsp; and  7�?nbsp; casing  and  built  to  API  7A specification.
YES,One (01)  set  20�?nbsp; casing bushing�?1-3/4"-13-3/8"�?-5/8"-10-3/4"�?-3/8"-8-5/8"sub-bushing(with liner),One(01) set per size
 /FONT>
 /FONT>
 /B>
 /B>
e)   Kelly drive bushing for 5-1/4�?API Hex Kelly (two units).   
YES
 /FONT>
 /FONT>
 /B>
2.2.14
Top Drive (optional)
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
AC electric top drive unit, preferably Tesco, c/w accessories with the following minimum ratings:
YES, Tesco  Top Drive�?00ECI900�?BR>Rated Power�?00HP
Max. Rotary Speed�?93RPM
 /FONT>
 /FONT>
 /B>
 /B>
a)   500 ton hoisting capacity 
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)  50,000 lb-ft drilling torque at 100 rpm
 /FONT>
33000 lb-ft drilling torque at 100 rpm
 /FONT>
 /B>
 /B>
c)    75,000 lb-ft connection torque
 /FONT>
36700 lb-ft connection torque
 /FONT>
 /B>
 /B>
d)  50,000 lb-ft braking torque
 /FONT>
56,000 lb-ft braking torque
 /FONT>
 /B>
 /B>
e)  7,500 psi working pressure
 /FONT>
5,000 psi working pressure
 /FONT>
 /B>
2.2.15
Rig Floor Tubular Handling Equipment
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Complete set of rig floor tubular handling equipment shall be provided for drill pipes, drill collars, casing and shall include but not limited to the following:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   Casing  Tools:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Casing-handling  equipment  is  required  for  7�?  9  5/8’�,  and  13  3/8’�,  20�?nbsp; API  coupled casing.  Equipment shall include but not limited to the following: 
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
1. Single joint pick up elevator 20�?�?1pc 
YES
 /B>
 /FONT>
 /B>
 /B>
2. Single joint pick up elevator 13-3/8�?�?1pc   
YES
 /B>
 /FONT>
 /B>
 /B>
3. Single joint pick up elevator 9-5/8�?�?1pc 
YES
 /B>
 /FONT>
 /B>
 /B>
4. Single joint pick up elevator 7�?�?1pc  
YES
 /B>
 /FONT>
 /B>
 /B>
5. Side door elevator 20�?�?2pcs   
YES
 /B>
 /FONT>
 /B>
 /B>
6. Side door elevator 13-3/8�?�?2pcs  
YES
 /B>
 /FONT>
 /B>
 /B>
7. Side door elevator 9-5/8�?�?2pcs   
YES
 /B>
 /FONT>
 /B>
 /B>
8. Side door elevator 7�?�?2pcs    
YES
 /B>
 /FONT>
 /B>
 /B>
9. Slips for 20�?casing �?1pc   20�?/FONT>
YES
 /B>
 /FONT>
 /B>
 /B>
10.  Slips for 13-3/8�?casing �?1pc 
YES
 /B>
 /FONT>
 /B>
 /B>
11.  Slips for 9-5/8�?casing �?1pc  
YES
 /B>
 /FONT>
 /B>
 /B>
12.  Slips for 7�?casing �?1pc 
YES
 /B>
 /FONT>
 /B>
 /B>
13.  Elevator 350 tons with adapter plate and segment for casing �?1 set 
YES
 /B>
 /FONT>
 /B>
 /B>
14.  Spider 350 tons with adapter plate and segment for casing �?1 set
YES
 /B>
 /FONT>
 /B>
 /B>
15.  Casing protector for 20�?clamp on type �?2 pcs
YES
 /B>
 /FONT>
 /B>
 /B>
16.  Casing protector for 13-3/8�?clamp on type �?2 pcs    
YES
 /B>
 /FONT>
 /B>
 /B>
17.  Casing protector for 9-5/8�?clamp on type �?2 pcs   
YES
 /B>
 /FONT>
 /B>
 /B>
18.  Casing protector for 7�?clamp on type �?2 pcs    
YES
 /B>
 /FONT>
 /B>
 /B>
19.  Casing power tongs �?1 set complete with jaws for 7�? 9-5/8�?and 13-3/8�?nbsp;   
YES
 /B>
 /FONT>
 /B>
 /B>
20.  Manual tongs �?1 set  
YES
 /B>
 /FONT>
 /B>
 /B>
21.  Casing clamps �?1 set   
 /B>
Casing Safty Slips-1pair�?/B>WA-C3 1/2�? 20�?/B>
 /FONT>
 /B>
 /B>
22.  Casing drift for 7�?casing �?1 set     
YES
 /B>
 /FONT>
 /B>
 /B>
b)   Drillpipe, Collars:
 /FONT>
 /B>
 /FONT>
 /B>
 /B>
The drill pipe and drill collar rig floor handling tools shall be but not limited to the following:   
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
1.    Drill collar elevator size 8�?nbsp; - 1 pc  
YES
 /FONT>
 /FONT>
 /B>
 /B>
2.    Drill collar elevator size 6 ½ï¿½?�?1pc     
YES
 /FONT>
 /FONT>
 /B>
 /B>
3.    Elevator for 5�?drill pipe �?2pcs  
YES
 /FONT>
 /FONT>
 /B>
 /B>
4.    Elevator for 4 ½ï¿½?drill pipe �?1 pc 
YES
 /FONT>
 /FONT>
 /B>
 /B>
5.    Elevator for 3 ½ï¿½?drill pipe �?1 pc  
YES
 /FONT>
 /FONT>
 /B>
 /B>
6.    Slips for 8�?drill collar �?2 pcs
YES
 /FONT>
 /FONT>
 /B>
 /B>
7.    Slips for 6 ½ï¿½?drill collar �?2 pcs 
YES
 /FONT>
 /FONT>
 /B>
 /B>
8.    Safety clamp for drill collars �?1pc  
YES
 /FONT>
 /FONT>
 /B>
 /B>
9.    Drill pipe power tong �?1pc complete with jaws for 3-1/2�?4-1/2�?and 5�?drill pipe. 
YES
 /FONT>
 /FONT>
 /B>
 /B>
10.  Manual tongs �?2 sets   
YES
 /FONT>
 /FONT>
 /B>
 /B>
11.  Bit breakers for 17-1/2�? 12-1/4�?and 8-1/2�?rock bits.  
YES
 /FONT>
 /FONT>
 /B>
 /B>
Any other facilities required at the rig floor for complete handling of the tubulars shall be included by the
Supplier.
 /B>
 /FONT>
 /FONT>
 /B>
 /B>
c)    7�?OD, 26 lb/ft casing running spear with NC50 box up connection.
YES
 /FONT>
 /FONT>
 /B>
 /B>
The spear is connected to the drill pipes and it is used for running the 7�?OD slotted liners (casing) into
the hole after attaining the total depth of the well. After landing the liners on well bottom, the spear is unlatched from casing and pulled out of the hole.
 /B>
 /FONT>
 /FONT>
 /B>
2.2.16
Blowout Preventer System 
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Equipment offered shall withstand aerated drilling fluids and saturated steam conditions within the nominal ratings specified. This shall comprise 5,000-psi blowout preventers with closing unit and choke manifold.
YES
 /FONT>
 /FONT>
 /B>
 /B>
Requirements per rig:
 /B>
 /FONT>
 /FONT>
 /B>
 /B>
a)  One (1) only 21 ¼â€™ï¿½ Annular BOP x 2000 psi 
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)  One (1) only 21 ¼â€™ï¿½ x 2000 psi Ram-type BOP fitted with CSO (blind gates)
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)  One (1) only 13 5/8’� Annular BOP x 5000 psi    
YES
 /FONT>
 /FONT>
 /B>
 /B>
d)  One (1) only 13 5/8’� x 5000 psi Double Ram-type BOP fitted with Complete Shut Off (blind) and 5�?drill pipe rams
YES
 /FONT>
 /FONT>
 /B>
 /B>
One set of 9-5/8�?OD casing rams shall be provided to fit in item (d)  
YES
 /FONT>
 /FONT>
 /B>
 /B>
e)  BOP/Accumulator control unit (Koomey Type 80 or equivalent)  
FKQ800-7(SHANFHAI SHENKAI�?/FONT>
 /FONT>
 /FONT>
 /B>
 /B>
enetration rate
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
 Working pressure: 3000 psi
YES
 /FONT>
 /FONT>
 /B>
 /B>
Tank capacity: about 120 gallons   
Tank capacity: about 175 gallons
 /FONT>
 /B>
 /B>
Complete with remote control system   
YES
 /FONT>
 /FONT>
 /B>
 /B>
f)  Kill and choke line manifold 
YES, JG103-65/35,Main Nominal Dia.:103mm�?-1/16"),Pressure:5000PSi
YG103-65/35,main Nominal Diz.:103mm�?-1/16"),Pressure:5000PSi
 /FONT>
 /FONT>
 /B>
 /B>
g)  BOP test facility  
YES,  KB16Pneumatic high-pressure test pump,
The maximum test pressure:140MPa
 /FONT>
 /FONT>
 /B>
 /B>
h)  BOP handling facility
YES, FY-50Y,2×250KN
 /FONT>
 /FONT>
 /B>
2.2.17
Drilling spools
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
Sufficient , 2000 psi drilling spools shall be provided to allow for drilling hole sizes for 26’�, 17½ï¿½? 12 ¼ï¿½?and 8½â€™ï¿½  and  running  casing  sizes  from  20’�,  13-3/8�?  9-5/8�?nbsp; and  7’�  respectively.  Spools  shall  incorporate  side outlets for kill and choke lines
YES, One(01) set 20" casing bushing�?3-3/8"sub-bushing (with liner�?9-5/8" sub-bushing (with liner�?2-3/8"-8-5/8" sub-bushing (with liner�? one set per size.
 /FONT>
 /FONT>
 /B>
2.2.18
Mud Circuit
 /FONT>
 /FONT>
 /FONT>
 /B>
2.2.18.1
Capacity:   Approximate total storage capacity shall be a minimum of 1,600 barrels with suitable tank divisions and delivery manifolds to accommodate mud pill mixing independent of normal drilling fluid.
The mud system will include the following:
YES
 /FONT>
 /FONT>
 /B>
 /B>
a)   Shaker tank
YES, 860bbl
 /FONT>
 /FONT>
 /B>
 /B>
b)   Intermediate tank
YES, 280bbl
 /FONT>
 /FONT>
 /B>
 /B>
c)   Suction tank
YES, 345bbl
 /FONT>
 /FONT>
 /B>
 /B>
d)  Mixing tank
YES, 170bbl
 /FONT>
 /FONT>
 /B>
 /B>
e)  Water tank, total capacity approximately 160 M3.
YES, 80m3X2
 /FONT>
 /FONT>
 /B>
 /B>
f) Combination Trip tank, Poor Degasser and Choke Manifold Skid.
YES, 15m3,with Desander and the skid of the hock manifold
 /FONT>
 /FONT>
 /B>
 /B>
g)   Standard duty Worm Gear Mud Agitators
YES, Mud Mixer�?BR>Fifteen(15) sets HA15: motor power:15KW, impeller diameter:1000mm
Two(02) sets HA7.5: motor power:7.5KW,impeller diameter:800mm
One (01) set  HA5.5:motor power:5.5KW,impeller dia:600mm
 /FONT>
 /FONT>
 /B>
2.2.18.2
2.2.18.2 Solids handling:  Desanders and desilters shall be capable of handling approximately 5500 litres/min. Shale shakers should preferably be dual type capable of handling approximately 4000 litres / min each side.
YES, One (01) set desander:HD-300X3,
Nominal diameter of cyclone:12"×3
Capacity:360m3/h
screen mesh size:1240×585mm
screen mesh size:150�?00mesh
Motor power: 0.5KW
One(01) set desilter:HM-100X16
Nominal diameter of cyclone:4"×16
Capacity:210�?40m3/h  
screen mesh size:1240×585mm
screen mesh size:150�?00mesh          
Motor Power:0.5Kw
 /FONT>
 /FONT>
 /B>
 /B>
The Desanders and desilters system will include the following:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a)   Desander Horizontal, 3 Cone.
YES
 /FONT>
 /FONT>
 /B>
 /B>
b)   Desilter Assembly, 16 Cone.
YES
 /FONT>
 /FONT>
 /B>
 /B>
c)    Linear motion shale shaker.
YES, Two (02) shaker ,HS280-3P
Motor power:2×2.2Kw
screen mesh size:3×833×1150mm�?BR>vibration strength:7.2g
Screen adjustment  range:-2° �?+6°
 /FONT>
 /FONT>
 /B>
 /B>
d)   Vacuum Degasser mounted on Oil field skid including explosion proof motor, starter, suction and discharge piping and jet nozzle.
YES
 /FONT>
 /FONT>
 /B>
 /B>
e) Mud laboratory complete with mud balances, testing kits etc.
YES
 /FONT>
 /FONT>
 /B>
2.2.19
Water tanks
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
160 M3  Water tanks and centrifugal pumps.           
YES,Water tank:80m3X2,
Two sets water pump:SP30-20:                        Discharge�?0m3/h �?BR>Pressure head�?55m�?BR>Power�?8.5KW
 /FONT>
 /FONT>
 /B>
2.2.20
Fuel Storage
YES, Capacity�?0m3,40m3+3m3
 /FONT>
 /FONT>
 /B>
 /B>
Sufficient  on-site  storage  shall  be  provided  for  a  minimum  of  10  days  operation  of  the  rig  and  aeration equipment.  Fuel filtering system and transfer pumps shall be included.
YES
 /FONT>
 /FONT>
 /B>
2.2.21
Safety Equipment
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
a) Fire extinguisher and safety equipment for rig site
YES
 /FONT>
 /FONT>
 /B>
 /B>
150 lb wheel mounted, dry chemical fire extinguisher 1
 /FONT>
165 lb wheel mounted, dry chemical fire extinguisher�?PCS.
 /FONT>
 /B>
 /B>
 20 lb CO2  fire extinguisher           
 /FONT>
15 lb CO2  fire extinguisher �?PCS.
 /FONT>
 /B>
 /B>
30 lb dry chemical fire extinguisher
 /FONT>
27 lb dry chemical fire extinguisher �?0PCS.
 /FONT>
 /B>
 /B>
H2S Gas continuous monitoring system
YES
 /FONT>
 /FONT>
 /B>
 /B>
 Derrickman (Mast) escape line and chair
YES
 /FONT>
 /FONT>
 /B>
 /B>
 One (1) Hand held H2S Gas Detector 
YES
 /FONT>
 /FONT>
 /B>
 /B>
 Two (2) Safety Belts for mast climbing  
YES
 /FONT>
 /FONT>
 /B>
 /B>
 One (1) Emergency eye wash station   
YES
 /FONT>
 /FONT>
 /B>
2.2.22
Welding and Cutting Tools / Equipment
 /B>
 /FONT>
 /FONT>
 /B>
 /B>
Welding and cutting Tools for two rigs
YES
 /FONT>
 /FONT>
 /B>
 /B>
Heavy duty oxygen-acetylene welding set and cutting tools
YES
 /FONT>
 /FONT>
 /B>
 /B>
Diesel driven welding machine (Lincoln SAE 400 or equivalent)
YES
 /FONT>
 /FONT>
 /B>
 /B>
Electric welding machine
YES
 /FONT>
 /FONT>
 /B>
 /B>
Wireline cutter
YES
 /FONT>
 /FONT>
 /B>
2.2.23
Rig Site Offices and Accommodation Facilities
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
The following facilities are desired:
 /FONT>
 /FONT>
 /FONT>
 /B>
 /B>
1. Dog House �?1 unit 
YES
 /FONT>
 /FONT>
 /B>
 /B>
2. Workshop �?1 unit 
YES
 /FONT>
 /FONT>
 /B>
 /B>
3. Store house �?1 unit
YES
 /FONT>
 /FONT>
 /B>
 /B>
4. Office for Tool Pusher with two (2) beds, toilet and shower �?1 unit     
YES
 /FONT>
 /FONT>
 /B>
 /B>
5. Office for Drilling Engineer with two (2) beds, toilet and shower �?1 unit  
YES
 /FONT>
 /FONT>
 /B>
 /B>
6. Office for Directional Drilling Engineer with two (2) beds, toilet and shower �?1 unit
YES
 /FONT>
 /FONT>
 /B>
 /B>
7. Office for Aerated Drilling Engineer with two (2) beds, toilet and shower �?1 unit 
YES
 /FONT>
 /FONT>
 /B>
 /B>
8. Office for Maintenance Engineer with two (2) beds, toilet and shower �?1 unit  
YES
 /FONT>
 /FONT>
 /B>
 /B>
9. Office for Rig Geologist with two (2) beds, toilet and shower �?1 unit
YES
 /FONT>
 /FONT>
 /B>
 /B>
10. Office for Drilling Supervisor with two (2) beds, toilet and shower �?1 unit  
YES
 /FONT>
 /FONT>
 /B>
 /B>
11. Dormitory for eight people �?with 8 beds, toilet and shower. �?2 units  
YES
 /FONT>
 /FONT>
 /B>
 /B>
12. Meeting room/ dining room  - 1 unit
YES
 /FONT>
 /FONT>
 /B>
2.2.24
Base (Rig) Camp
YES
 /FONT>
 /FONT>
 /B>
 /B>
ase camp for about 75 people comprising of:
YES
 /FONT>
 /FONT>
 /B>
 /B>
1. Engineers/Superintendents accommodation�?each with two bedrooms (2 beds per room.), toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
2. Supervisors/Technicians accommodation �?each with two bedrooms (2 beds per room), toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
3. Workers accommodation �?each with 8 beds, toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
4. Geologists/Reservoir Engineers accommodation�?each with two bedrooms (2 beds per room.), toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
5. Consultants/Ad hoc Specialists accommodation�?each with two bedrooms (2 beds per room.), toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
6. Cementing/Services crew accommodation �?each with 8 beds, toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
7. No of dining rooms
YES
 /FONT>
 /FONT>
 /B>
 /B>
8. No of kitchens with storage
YES
 /FONT>
 /FONT>
 /B>
 /B>
9. Toilet and shower unit - approximately 6 toilets and 6 showers
YES
 /FONT>
 /FONT>
 /B>
 /B>
10. Offices �?providing two office spaces.
YES
 /FONT>
 /FONT>
 /B>
 /B>
11. Camp Manager/Cateress accommodation �?each with two bedrooms (2 beds per room), toilet and shower
YES
 /FONT>
 /FONT>
 /B>
 /B>
12. Cement laboratory c/w accessories
YES
 /FONT>
 /FONT>

 
 