BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
     Gas turbine & spare parts  
       GE 9FA 255mw Gas Turbine Generator  
       GE Licensed MS9001E Series Gas Turbine plant  
       42MW GE Gas Turbine Generator  
       PG6581B Gas Turbine Series Generator Plants  
       PG6581B Gas Turbine Set Supply Scope  
       Gas Turbine Spare Parts  
       Gas Turbine Generator Site Inspection  
       Quotationon Used PG6551B gas turbine plant  
       2MW Gas Turbine Generator  
       7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit  
       10MW Gas Turbine Generator  
       Used Gas Turbine Generator Plant  
       Technical-Specification-PG6581B-Gas-Turbine  
       Supply-Scope-of-PG6581B-Gas-Turbine  
       Budgetary Cost for 108MW Gas Turbine Plant  
       Siemens Gas Turbine Generator  
     HFO Diesel generator & Marine HFO Engine  
       8x8735kw MAN 18V32/40 HFO Diesel power Proposal  
       8x 4.1mw MAN 9L32/40 hfo power plant proposal  
       10x5.5MW MAN 12V32/40 HFO diesel plant proposal  
       3mw-9mw MAN 18V32/40 HFO Diesel generator  
       6 units 5.5mw MAN 12V32/40 hfo diesel plant  
       3x3.5mw MAN 8L 32/40 hfo diesel generator plant  
       1MW diesel generator   
       1.5MW Diesel Generator Set  
       2M Diesel Generator Plant  
       Sample Diesel Power Plant Proposal 9x2mw  
       Diesel power Plant List  
       Used Diesel Generator  
       Diesel Generator Pictures  
       Bio diesel generator power plant MW  
       Sample Pack List for 10x2MW HFO diesel power Plant  
       10kw-4000kw-Cummins-MTU-diesel-generator-set  
     MTU Cummins Perkins Volvo Diesel Generator  
       List of MTU Cummins PERKINS diesel generator  
     Power Plant Generator  
       Air Cooled Power Generator  
       low speed 125rpm/150rpm generator  
     Steam Turbine  
       Extraction Condensing Turbine  
       Condensing Steam Turbine  
       Recovery Turbine  
       Extraction Turbine  
       Required Data for Quotation  
       Alstom-Licensed-330MW-Steam-Turbine  
       Quotation-50MW-condensing-steam-turbine  
       Quotation-30MW-Condesing-Steam-Turbine  
     Boiler  
     Hydro Turbine  
     Engineering Machinery  
       Truck Mounted Crane Crawler  
       Trailer Concrete Pump  
       China track Bulldozer  
       China Crane  
       Benz Truck and Lorry from China  
       China-heavy-industry  
     Cable&Wire  
     Electric Motor  
     Transformer in MVA  
       Germany Certificates  
       Required Data for Quotation  
       Transformer Reference  
       Sample Inquiry  
     Wind Turbine Generator  
     Oil-Well-Drill-Bit  
       Oil-Well-Drill-Bit-Main-Products  
       Drill-product-series  
       Other-oilfield-products  
       Kingdream Rock Bits Catalouge 2011  
       IADC-CLASSIFICATION-OF-KINGDREAM-BITS  
       ROCK-BIT-COMPARISON-CHART  
     Drilling-Rig-for-Oil-Gas-Mining  
       Main-products-Directory-introduction  

Diesel Generator Proposal

Power Plant Proposal

Home > Equipments > HFO Diesel generator & Marine HFO Engine - MOU of EPC and investment on 25mw Hyundai18H35/40GV gas engine generator power plant


 

MOU of EPC and investment on 25mw Hyundai18H35/40GV gas engine generator power plant

 

Actually we can be EPC and investor for Any gas engine power projects and HFO diesel generator power projects with our MAN and Hyundai HFO/Gas engine OEM or licensee as partner when you can get PPA with sovereign guarantee.

the capacity can be 10-200mw

the investment ratio can be from 30% to 70%

MEMORANDUM OF UNDERSTANDING
 
THIS MEMORUNDUM OF UNDERSTANDING MADE ON THE 18th DAY OF OCTOBER   2011;
 BETWEEN
 
Chinese EPC and investment xxxx., LTD
 (hereinafter referred to as "Party A") which expression shall where the contexts so admits include its legal representatives and successors; and
Xxxx TRADING COMPANY., LTD
 (hereinafter referred to as "Party B") which expression shall where the contexts so admits include its legal representatives and successors; (Hereinafter the parties hereto collectively referred to as the "Parties" and respectively as the "Party".)
 
NOW THIS MEMORANDUM OF UNDERSTANDING SETS FORTH THE FOLLOWING;
THE FOLLOWING ARE THE REPERESENTATIVES OF THEIR RESPECTIVE PARTIES;
 
xxxx General Manager
Party A
 
AND,
Xxxx CEO
Party B
WHEREAS:
Party A and the Party B agreed that both parties will work together to set up 50%:50% joint venture to achieve the goal of investing and constructing the following gas engine generator power projects (herein after called “Projects�?.
The board of joint venture including five boarding directors, for the first year, three members from Party A, the next year, three members from Party B, the turn will continue until the termination of the joint venture.
The Projects lists are:
 
25 MW gas engine power plant for xxxxx
If definition, names and address of Projects changed, Party B should timely/ formally inform Party A.
And WHEARES:
Party A will be EXCLUSIVE EPC contractor and Turn key for above project, the EPC budget price is $xxx 00,000, among which 50% will be invested by Party A, balance will be invested by Party B.
 
PARTY A shall:
a)      Invest 50% for joint venture and project
b)      Prepare detailed technical and commercial proposals for the Projects, including equipment list.
c)    Reply to questions and suggestions related to the Projects.
d)    Furnish Party B with information and documents concerning the project, which may reasonably be required by the Government of Xxx from time to time, for the success of the joint venture and the project;
e)     Apply with XXX-Hyundai18H35/40GV or other gas engine generator for the Projects;
f)   Acting as Projects financing facilitator to help get financing from China; providing needed help and information on Chinese bank financing for the Projects.
g)    Should provide maintenance and spare parts as well as operation for the project after its take over under additional contracts.
 
PARTY B shall:
a)     Invest 50% for joint venture and project
b)     Provide the land for this project for free.
c)     Responsible for register of joint venture in Xxx.
d)     Prepare the relevant documents and information of the Project, discuss and explain the details of the documents with the Party A. The aforesaid documents includes but not limited as follows:
²  Scope of work for Party A in detail;
²  Technical requirements with all major technical parameters;
²  Feasibility report and environment impact assessment report (if needed);
²  Power Purchase agreement;
²  All other needed documents from Party B for contracts and investment.
e)     Procure the information regarding local law for labour, custom duties, taxes, other levies, road conditions from main port to the Project site.
f)      Secure all approvals documents issued by the Government of Xxx government necessary for the Projects.
g)     Provide all other assistances where necessary to Party A.
h)     Shall not disclose any information or data to the public provided by either party, unless agreed by both parties prior in written form during and after the period of validity of the MOU.
i)       Exclusively work with Party A on the Projects
j)       Should pay all cost by himself  before effect of the EPC contract ;
 
Work schedule:
1.     The EPC contract will be sign between Party A and Party B within 1 month after signing the MOU.
1.1  Party B should supply technical document within 7 days after signing the MOU so that Party A can offer technical and commercial proposal, these document include geo survey report, gas analysis report, gas pressure report, red line of the scope of supply.
1.2  Party A prepare the EPC contract and technical specification within 7days after receiving above document, and negotiate the details with each other by email.
1.3  Party A will arrange members go to Xxx to confirm technical and commercial proposal and sign EPC contract if necessary.
2.    Party B should register the Joint venture in Xxx before 20th November 2011;Party A should provide all documents which are necessary in this process, the details work include but not limited:
2.1  Procure the permit documents from Xxx government;
2.2  Finish the joint venture agreement after negotiating with each other;
2.3  Set up Joint venture;
3.     Joint venture should be transferred with the EPC contract, PPA, land, fuel and other resource needed for the project under approval of the Xxx government within 1 month after joint venture set up.
4.     Party B financing 50% investment for the project in Xxx as soon as possible and pay to Part  A, the detailed plan of financing still need negotiate with each other.
 
Contacts for project coordination are as follows:
Contact from PARTY B________:
xxxx/CEO
 xxxxCOMPANY.,LTD
Address:
Telephone
Email:
 
Contact from PARTY A:
Yang Chunlin(project adviser)
Leda Greenpower Co.,ltd.
Tel:+86 13801218512
IN WITNESS WHEREOF the parties have set their respective hands and affixed their Common Seals the day and year first hereinbefore written.
 
SEALED WITH THE COMMON SEAL OF     
xxxxG COMPANY.,LTD
In the presence of:
xxxxx/CEO
 
_______________________________
 
SEALED WITH THE COMMON SEAL OF
Chinese EPC and investment xxxx., LTD
                                  
In the presence of:
 
_______________________________
xxxx
General Manager
 
And
 
Witness:
YANG CHUN LIN
PARTY A Advisor
Leda Greenpower Beijing Trading & Engineering Co., Ltd.
 
 
 
 




Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
[email protected]
[email protected]