BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Spare Parts   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Power Generation > Gas Engine Generator power plant > 500kw-5200kw gas engine generator series - quotation for 500kw, 600kw, 1000kw biogas gas engine generator sets


Google

quotation for 500kw, 600kw, 1000kw biogas gas engine generator sets

quotation for 500kw, 600kw, 1000kw biogas gas engine generator sets
 
We can recommended the use of bio-gas gas engine generator sets with capacity of 500kW, 600KW, 1000kW. And the rought FOB China ports quotation is around: 500USD/kw, so the respective quotation for the 500kW, 600KW, 1000kW gas engine generator set are: 250000USD/500kw, 300000USD/600KW, 500000USD/1000kw.
quotation code: 2061520130517
 
1. What is your estimated Syngas volume and pressure you require at the engine inlet for producing 1 MW.Hr electricity.
Engine produces 1 kW.Hr electrical energy need 1.6 Nm3 gas, producing 1 kW.Hr electrical energy need 1600 Nm3 gas, which is based on gas composition and heating value. Engine inlet gas pressure meets 3kPa to 10kPa.
Syngas �? Volume (Dry)�?
H2  17.5 ,CO  20.8,CH4  3.3,N2   45.8,CO2 11.4,C2H4 0.7,C3H6 0.4
,GCV (MJ/Nm3) 6.2 �?/DIV>
2. The electrical output from the engine will be 415 V, 50 hz or different?
SD is our original gas-fired power generation equipment manufacturers, based on customer requirements, the unit can meet the requirements of any frequency and voltage, including 415 V and 50 Hz. Please State it clearly in the contract requirements.
3.     What will be the temperature from the engine exhaust gas? Does your engine have the facility to recover this heat and use in a steam turbine for producing more electricity?
 Engine exhaust gas temperature between 450 ° c to 500 ° c, according to customer's choice, the unit can support waste heat boiler, collects exhaust waste heat, hot water or steam. Engines can meet customer's requirements to produce steam, and use steam turbines to generate electricity.
4. What will be your scope of supply and what are the work we have to consider from our end?
We provide gas turbine genset, and its auxiliary equipments, and its ancillary equipments. The Ancillary equipments includes, but not limited to: unit radiator, unit preheating equipment, gas regulators, dewatering, filtration equipment, and so on. Moreover, the specific scope of delivery can be provided by customer. Users need to ensure quality of gas and reliable supply of gas; particularly gas processing results must always meet unit requirements. We can be EPC contractor, civil works better by users.
5. Is the supervision of the erection and commissioning provided by you and what about the services in case of any problem during working?
Our SD is China's most professional gas engine generator manufacturers of internal combustion engines and gas internal-combustion engine power station construction contractor, undertook more than 200 domestic and foreign gas engine power plant design, Building ,construction installation, commissioning, packet transport service, and can offer the power station service and operation service during construction and after sale services.
6.  No of years gurantee provided by you?
General warranty is one year after delivery or running 1500 hours, which comes first effective. We also can extend the warranty period, according to the contract warranty period. In addition, the owner can entrust the O&M to us
7. Are all the communication software provided is in English and can they interact with Siemens PLC.
All communications software is available in English; and can communicate with Siemens PLC.
8. What is the lead time for you to manufacture and ship the engine.
 12V190-600kW unit delivery time is 90 days after receiving advance payments and 16V190-1000kW unit delivery time is 120 days after receipt of advance payment.
yangchunlin




Copyright©2006-2013 Leda Greenpower Beijing ICP Reg. No: 10010978
   Fax:0086-10-84161062  E-mail:
[email protected]
[email protected]   Google