1. SCOPE OF SUPPLY
This project is a gas engine power plant in the Islamic Republic of Iran. The power station has a total
power generation capacity of 26MW at the Reference Site Conditions. Nine (9) 12V26/32 gas engine
generating sets and waste heat recovery power generation system will be supplied to the client.
The gas engine generators are capable of operating parallel with Grid.
The gas engine generating sets will be designed to produce electric power by gen-sets 12V26/32
manufactured by Jichai. Generating sets voltage: 11kV, Frequency: 50Hz, PF: 0.8pf, Speed: 1000rpm.
Design condition and performance
Data design ambient condition
The equipment will be designed and constructed for operation at following conditions:
- Ambient Air temperature (blower inlet air temp.): 25˚C
- Total barometric pressure: 1000 mbar (100m AMSL)
- Cooling water temperature: 33˚C
- Relative humidity: 85%
- Cooling system: Radiator Cooling
Performance data at design ambient condition
- Gross Output At Generator Terminal : 2700 kW/Unit
(Tolerance +5%, Load 100%, 50 Hz, PF = 0.8 Fuel gas LCV = 49138 kJ/kg, Density = 0.80558 kg/Nm3)<90%
NO. |
Name |
Description |
Unit |
Quan. |
Price |
1 |
Jichai-9L32/40 Generator set |
Engines, couplings, generators, common base, control system |
set |
3 |
$15,460,000 |
2 |
Power house and auxiliary |
Lubricant separation module, fuel supply module, nozzle cooling modules, engine warm-up module |
set |
3 |
$3,800,000 |
Pump Station |
Water maintenance module, air bottles, air compressor |
Radiator, exhaust |
Radiator, exhaust silencer |
Distribution room |
Switchgear, feeder panel, neutral grounding resistor cabinet PT cabinets, DC screens, power distribution cabinets,station transformer |
Waste heat recovery power generation system |
3 |
Waste heat boiler |
|
set |
3 |
|
4 |
Power plant overall design & Project management |
|
set |
1 |
$800,000 |
5 |
The power station equipment installation, installation material and debugging |
Piping system (tubing, pipes, trachea, smoke tubes, etc.), cables, wires, bridge |
|
|
$1,420,000 |
6 |
Civil engineering |
|
|
|
$2,000,000 |
7 |
2 years spare parts |
|
|
|
$1,100,000 |
Total: |
United States Dollars Twenty Four Million Five Hundred Eighty Only ($24,580,000.00) |
3. Delivery time
Delivery time will be conditional to unsold production capacity. The equipment will be ready for
shipment from our factory not later than 3 months after the date of signature of theJichai Supply
Contract and receipt of advance payment as defined therein.
4. WARRANTY
The warranty period shall be the earlier of (i) twelve (12) months from the commissioning or (ii) eighteen
(18) months from the date of shipment.
5. VALIDITY
This offer is valid for a period of 60 days from the date of this offer.
6. REMARKS
1) All taxes and duties to be imposed are not included in our price.
2) The other terms and conditions of the contract shall be subject to mutual agreement.
China the most famous gas engine generator sets
For China gas engine generator sets or power plants, please click.
|