BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Spare Parts   |   BBS-Blog   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation - Technical Documents 1x200 MW COAL FIRED POWER PLANT/plot plan


 

Technical Documents 1x200 MW COAL FIRED POWER PLANT/plot plan

 2.PLOT PLAN

The cooling water system will be of twice-through water supply system. The coal will be transported to power plant by road.
The plot plan will be located according to coal yard�?main block—switchyard from south to north in turn. The main block is located in the middle of the plant. Switchyard is located in the north of the main block. The auxiliary production area is close to the west of the main block. it contains: mechanical draft cooling tower, chemical water treatment plant, comprehensive water pump house, office building, maintenance workshop, etc.
The roads in the plant connect with the main block and auxiliary production area in request of the fire-fighting and function. The width of the road around the main block is 6m. The width of the fire-fighting road behind the boiler is 4m. The 4m wide road connects each auxiliary building in the auxiliary area.
The turning radius of the roads will generally be 9-12m. The radius of the roads entering the workshops will be 6m.
The elevation of the proposed power station will be decided after the detailed site conditions are submitted by the owner. The floor level of main block and auxiliary building will be 0.3m higher than outside. The drainage slope will be more than 3-5�?
The organizing drainage will be adopted in the plant. Rain water will be collected by pipeline below the road in plant then discharge. The chemical water, waste water, oil water and coal yard water will be collected and treated before discharging.
The area in the power plant fence is about 19.50 ha.




Copyright©2006-2013 Leda Greenpower Beijing ICP Reg. No: 10010978
   Fax:0086-10-84161062  E-mail:
[email protected]
[email protected]