BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Spare Parts   |   BBS-Blog   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation - Technical Documents 1x200 MW COAL FIRED POWER PLANT/CHEMICAL WATER TREATMENT SYSTEM


 

Technical Documents 1x200 MW COAL FIRED POWER PLANT/CHEMICAL WATER TREATMENT SYSTEM

8  CHEMICAL WATER TREATMENT SYSTEM

Chemical water treatment system includes the following subsystem:
1)  Boiler make-up water treatment system
2)  Chemical dosing system
3)  Water & steam sampling and analyzing system
4)  Industrial waste water treatment system
5) Circulating-water dosing system
6)  Laboratory

8.1          Boiler Make-Up Water Treatment System

The water to be treated is from river water. According to the demineralized water quality requirement of the plant, the water treatment system process will be as follows:
Water from water supply ® clarified water tank ® clarified water pump ®multimedium filter® activated carbon filter ® cation exchanger ® decarbonator ®intermediate water tank ® intermediate water pump ® anion exchanger ® mixed-bed exchanger ® demineralized water tank ® demineralized water pump ® plant user
According to the total loss of the plant, the capacity of the water treatment system is 20t/h, adding to the self-used water, the capacity of the water treatment equipment is 22t/h.
The demineralized water at the outlet of the mixed bed will conform at all times as follows:
Conductivity (at 25°C) �?.2ms/cm
Silica                 �?0μg/L

8.2          Chemical Dosing System

In order to maintain the pH value and protect the feed-water pipe and equipment from corroding, the design proposes a set of ammonia dosing device including two(2) tanks and two(2) metering pumps for feed water.
In order to remove the oxygen within the feedwater, hydrazine as oxygen scavenger is fed continuously into boiler feedwater line. The hydrazine dosing device including two(2) tanks and two(2) metering pumps.
A phosphate dosing system including two(2) tanks and two(2) metering pumps will be designed to protect the boiler from scaling and corroding.

8.3          Water & Steam Sampling and Analyzing System

In order to monitor quality of water and steam cycle and ensure safety operation of unit, each unit will set one (1) water & steam sampling and analyzing device. Water and steam sampling and analyzing system includes high-temperature cooling rack and low-temperature instrument panel.

8.4          Industrial Waste Water Treatment System

The regeneration waste of the water treatment plant, and acid washing, the cleaning water of air pre-heater etc., are drained to neutralized water basin .The waste water will be discharged when pH reaching 6~9 after neutralizing treatment .

8.5          Circulating-Water Dosing System

8.5.1              The Killing Biology System
For prevent the microorganism growth in the circulating water system, one set of circulating-water killing biology system will be provided. The Main Equipment: Two (2) chemical solution tanks, Two (2) dosing pumps. The Equipment is in the circulating-water dosing room.
8.5.2              Inhibitor dosing system
One set of circulating-water inhibitor dosing system will be provided. The Main Equipment: Two (2) chemical solution tanks, Two (2) dosing pumps. The Equipment is in the circulating-water dosing room.

8.6   Laboratory

One set of instrument and equipment for chemical laboratory will be provided for the water, and coal analyzing.
 




Copyright©2006-2013 Leda Greenpower Beijing ICP Reg. No: 10010978
   Fax:0086-10-84161062  E-mail:
[email protected]
[email protected]