Form of Equipments Cost Breakdown |
|
|
|
|
|
|
|
NO |
Items of Guatemala Coal Fired Power Plant 3x130t/h+3x25MW |
QTY |
FOB Price in US$ |
I & F Price in US$ |
CIF Price in US$ |
Remarks |
A |
ENGINEERING DESIGN |
|
$198.00 |
|
|
|
B |
MAIN EQUIPMENT (MECH. ELECTRICAL & CONTROL) |
|
|
|
|
|
1 |
Combustion System |
|
|
|
|
|
1.1 |
130t/h CFB Steam Boiler |
3 |
$1,404.00 |
|
|
|
1.2 |
Boiler's Auxiliary System |
3 |
$216.00 |
|
|
|
1.3 |
Dust Palletizing System |
3 |
$208.80 |
|
|
|
1.4 |
Thermal Insulation |
|
$84.00 |
|
|
|
1.5 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$48.00 |
|
|
|
2 |
Thermodynamic System |
|
|
|
|
|
2.1 |
Steam Turbine |
3 |
$1,008.00 |
|
|
|
2.2 |
Other Auxiliaries |
|
$25.80 |
|
|
|
2.3 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$22.20 |
|
|
|
3 |
Generator & Electrical System |
|
|
|
|
|
3.1 |
Generator & Auxiliaries |
3 |
$504.00 |
|
|
|
3.2 |
13.8/6.3kV Power Transformer |
3 |
$81.60 |
|
|
|
3.3 |
6.3/0.4kV Power Transformer |
4 |
$17.28 |
|
|
|
3.4 |
6.3 kV Switchgear Equipment |
44 |
$110.88 |
|
|
|
3.5 |
13.8 kV Switchgear Equipment |
13 |
$69.60 |
|
|
|
3.6 |
400 Volt PDB |
68 |
$65.28 |
|
|
|
3.7 |
Prospecting System and Metering System |
1 |
$120.00 |
|
|
|
3.8 |
UPS, Battery Charger and DC Distribution Panel |
1 |
$12.00 |
|
|
|
3.9 |
Cable and Related Materials |
|
$360.00 |
|
|
|
3.10 |
Blackstart and Emergency Generator |
|
$26.40 |
|
|
|
4 |
Measuring & Control System |
|
$432.00 |
|
|
|
5 |
Common Auxiliary System |
|
$0.00 |
|
|
|
5.1 |
Fuel Handling system |
|
$132.00 |
|
|
|
5.2 |
Ash & Slag Removing System |
|
$58.80 |
|
|
|
5.3 |
Cooling Water System |
|
$342.00 |
|
|
|
5.4 |
Chemical Water Treatment System |
|
$0.00 |
|
|
|
|
5.4.1 The Raw Water Pre Treatment System |
|
$31.20 |
|
|
|
|
5.4.2 Demin Water System (R/O System) |
|
$141.60 |
|
|
|
5.5 |
Crane & Hoist |
|
$33.00 |
|
|
|
6 |
Mandatory Spare Parts for 1 Year operation |
|
$72.00 |
|
|
|
7 |
Recommended Spare Parts for 5 (five) years operation |
|
$132.00 |
|
|
|
8 |
Training |
|
$102.00 |
|
|
|
9 |
Commissioning and its required equipments |
|
$192.00 |
|
|
|
Bitmap
|
TOTAL COST |
|
$6,250.44 |
|
|
|
Remark: |
|
|
|
|
|
|
1. the above quotation is complete EPC price in US Dollar, but not including transportation, custom clearance, insurance, civil works, and installation. |
2. the quotation is only for reference, final proposal and quotation should be decided to final scope of supply and project practical data and conditions. |
3. the quotation code: 632020120116
The coal consumption of 75 Mw power plant is 43.08t/h ( 94974Btu/h) sub-bituminous coal - 12750 Btu/pound.
The efficiency of 130 t/h power boiler is >86%.
|
4. validity: 3 months from Jan. 16th, 2012. |
5. the quotation unit is 10000 USD. |