NO |
Items of 1x12MW Coal Fired Power Plant |
QTY |
FOB Price in US$ |
A |
ENGINEERING DESIGN |
|
$78.20 |
B |
MAIN EQUIPMENT (MECH. ELECTRICAL & CONTROL) |
|
|
1 |
Combustion System |
|
$0.00 |
1.1 |
Steam Boiler Proper |
1 |
$204.70 |
1.2 |
Boiler's Auxiliary System |
1 |
$25.30 |
1.3 |
Dust Palletizing System |
1 |
$29.90 |
1.4 |
Thermal Insulation |
|
$11.50 |
1.5 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$29.90 |
2 |
Thermodynamic System |
|
|
2.1 |
Steam Turbine |
1 |
$156.40 |
2.2 |
Other Auxiliaries |
|
$20.13 |
2.3 |
Installing Materials (Valve, Pipe and Pipe Fitting, etc) |
|
$29.33 |
3 |
Generator & Electrical System |
|
|
3.1 |
Generator & Auxiliaries |
1 |
$86.25 |
3.2 |
20/10.5kVPower Transformer |
2 |
$27.60 |
3.3 |
10.5/0.4kVPower Transformer |
2 |
$6.67 |
3.4 |
10.5 kV Switchgear Equipment |
20 |
$15.53 |
3.5 |
20 kV Switchgear Equipment |
6 |
$6.21 |
3.6 |
400 Volt PDB |
15 |
$7.36 |
3.7 |
Prospecting System and Metering System |
1 |
$65.55 |
3.8 |
UPS, Battery Charger and DC Distribution Panel |
1 |
$3.22 |
3.9 |
Cable and Related Materials |
|
$90.85 |
3.10 |
Blackstart and Emergency Generator |
|
|
4 |
Measuring & Control System |
|
$132.25 |
5 |
Common Auxiliary System |
|
$0.00 |
5.1 |
Fuel Handling system |
|
$67.85 |
5.2 |
Ash & Slag Removing System |
|
$55.20 |
5.3 |
Cooling Water System |
|
$86.25 |
5.4 |
Chemical Water Treatment System |
|
|
|
5.4.1 The Raw Water Pre Treatment System |
|
$10.01 |
|
5.4.2 Demin Water System |
|
$66.70 |
5.5 |
Crane & Hoist |
|
$21.28 |
6 |
Mandatory Spare Parts for 1 Year operation |
|
$28.75 |
7 |
Recommended Spare Parts for 5 (five) years operation |
|
$69.00 |
8 |
Training (No included the fee of bed and dining) |
|
$40.25 |
9 |
Commissioning and its required equipments (No included the consumed material, e.g. coals, water, electricity...) |
|
$87.40 |
10 |
Installation |
|
$1,092.50 |
11 |
Shipment |
|
$310.50 |
12 |
Insurance |
|
$25.30 |
13 |
Supervision |
|
$184.00 |
|
TOTAL COST |
|
$3,171.82 |
Quotation code: 1520130822 |