     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > China-the-most-famous-gas-engine-generator-sets - 2x500KW Straw gasification and Generating set equipment and material list quotation


 

2x500KW Straw gasification and Generating set equipment and material list quotation

 

2x500KW Straw gasification and Generating set(500GFZ1-PwG-TEM2) equipment and material list quotation 

Gasifier main equipment and material list

order

Equipment name

Type and specification

qty unit

remark

Straw gasification unit

LHC-1000

1set

293,857.14

1

Biomass fuel storehouse

 

1unit

 

2

Spiral feeder unit /SPAN>

 

1unit

 

3

Biomass gasifier

 

1unit

 

4

Level 1 dry-type  cyclone separator

 

1unit

 

5

Secondary dry-type  cyclone separator

 

1unit

 

6

Level 1 spray washing tower

 

1unit

 

7

Secondary spray washing tower

 

1unit

 

8

Level 1 venturi Washing tower

 

1unit

 

9

Grade 2 Venturi Washing tower

 

1unit

 

10

Cooling dust collector

 

1unit

 

11

Packed Tower scrubber

 

1unit

 

12

Caustic washing soda separator

 

1unit

 

13

Biomass tar filter

 

2unit

 

14

Wet type pressure regulating gas storage tank

 

1unit

 

15

Safety water seal device

 

1unit

 

16

Residual gas burner

 

1unit

 

17

Spiral ash conveying machine unit

 

1unit

 

18

Rotary ash valve unit

 

3unit

 

19

Ash conveying system

 

1unit

 

20

Cooling precipitation processor

 

1unit

 

21

Tower between line and accessories

 

1unit

 

22

Blower unit set

 

1unit

 

23

Induced draft fan unit

 

1unit

 

24

give water pump unit

 

2unit

 

25

Return water pump unit

 

2unit

 

26

Gasification system console

 

1unit

 

Gas tank

 

1set

52,380.95

total

  346,238.10

 

Generating set main equipment and material list

order

Equipment name

Type and specification

qty unit

remark

1.Electrical part

1

Generating set(Including engine,generator, chassis, horizontal fan tank)

500GFZ1-PwG-TEM2

2units

209,523.81×2=419,047.62

2

Station power distribution cabinet

 /SPAN>

2units

11,349.21×2=22,698.41

3

Generator circuit breaker cabinet

GCBP1-1000

2units

17,460.32×2=34,920.63

4

In situ control cabinet

FCP1-TEM2-500

2units

20,952.38×2=41,904.76

5

Starting cabinet

DQ-3000

1units

6,111.11

6

Transformer low pressure into line tank

JX-2000A

1units

14,841.27

2.Gas inlet and exhaust

1

Special pipe flame arrester

 

2units

  5,238.10×2=10,476.19

2

Instrument and valve and other accessories

 

1 item

2,619.05

3

Silencer and exhaust pipe

Stainless steel

2set

    4,365.08×2=8,730.16

3..residual heat utilization

1

Needle tube heat exchanger

Includes valve, instrument, etc

2set

10,563.49×2=21,126.98

2

Softened water apparatus

Includes valve, instrument, etc

1units

10,476.19

3

Softening water tank

Includes valve, instrument, etc

1units

2,793.65

4

Hot water circulating pump

Includes valve, instrument, etc

1units

4,365.08

5

Water supply pump

Includes valve, instrument, etc

1units

3,492.06

 

Steam separator

 

1units

8,730.16

4.other

1

Gas alarm system

 

2set

1,746.03×2=3,492.06

2

Fire extinguisher

 

2set

873.02×2=1,746.03

5.Establishment of set equipment (including power distribution room, 400 Volts low-voltage distribution system, intake system and other auxiliary facilities )

1

Set with cost of equipment

 

1set

92,190.48

6.Design fee

1

Design fee

 

1set

87,301.59

total

      797,063.49

Total(USD):346,238.10+797,063.49=1,143,301.59

remark:

1.The price does not include the civil engineering part: we can be send 1-2 technicians guide civil engineering part, civil engineering costs borne by the customer.

2.This quoted price does not contain the transport expense.

3. payment: 30% by T/T, balance be paid before delivery.

4. Validity: 30 days from Aug.21.2011.

5. Quotation code:63102012821

 

China the most famous gas engine generator sets
China's large gas generating set by CNPC manufacturing

For China gas engine generator sets or power plants, please click.

 