The Gas Power Station Quotation
Project No.: Jichai201206-013
1. SCOPE OF SUPPLY
This project is a gas engine power plant in Islamic Republic of Pakistan. The power station Groups has a total power generation capacity of 20MW (Continues power, Requirements are:27200KW×70%=19040KW,Rtaed Power is 24MW) at the Reference Site Conditions Power and 7MW emergency diesel generator. Twenty (20) H16V190ZLT1-2 gas engine generating sets and Six (6) BH12V190ZL will be supplied to the client.
The generators are capable of operating parallel with each generator set.
The gas engine generating sets will be designed to produce electric power by gen-sets H16V190ZLT1-2 manufactured by Jichai. Generating sets voltage: 3.3KV, Frequency: 50Hz, PF: 0.8pf, Speed: 1000rpm.
The diesel engine generating sets will be designed to produce electric power by gen-sets BH12V190ZL manufactured by Jichai. Generating sets voltage: 3.3KV, Frequency: 50Hz, PF: 0.8pf, Speed: 1500rpm.
The equipment will be designed and constructed for operation at following conditions:
- Ambient Air temperature (blower inlet air temp.): -20oC~+50oC
- Total barometric pressure: 1000 mbar (100m AMSL)
- Relative humidity: <90%
Note ( Does not contain the following contents):
Construction project, equipment and lube oil tank foundation construction; Installation and commissioning; Main transformer, electricity transmission.
Ocean freight and Iran domestic transport costs and customs fees;
2. PRICE
NO. |
Name |
Description |
Unit |
Quantity |
1 |
Engine |
H16V190ZLT1-2 |
Set |
20 |
2 |
Generator |
JFG 5605-6(Siemens technology) |
Set |
20 |
3 |
Gas system |
Set |
20 |
4 |
Control system |
Multi-function control panel, the EGS gas control box, the synchronous controller, local signal acquisition systems, remote communication interface |
Set |
20 |
|
|
|
|
|
|
|
|
NO. |
Name |
Description |
Unit |
Quantity |
5 |
Cooling system |
"Heat cycle" cooling system
"Low-temperature cycle" cooling system |
Set |
20 |
6 |
Exhaust muffler |
Flame arrester type |
Set |
20 |
7 |
Air starting system |
Set |
20 |
8 |
Generator Room |
Set |
20 |
9 |
Auxiliary equipment |
Six batteries and charger, fire fighting silencer, bellows and the exhaust pipe, the random spare parts, random tools, the use of maintenance manuals, common base |
Set |
20 |
10 |
Emergency diesel generators BH12V190ZL 3300V |
Set |
6 |
Total USD: |
$11,370,000.00 |
|
|
|
|
|
|
|
|
United States Dollars Eleven Million Three Hundred Seventy Thousand Only
FOB QINGDAO PORT
3. Delivery time
Delivery time will be conditional to unsold production capacity. The equipment will be ready for shipment from our factory not later than 3 months after the date of signature of the Jichai Supply Contract and receipt of advance payment as defined therein.
4. WARRANTY
The warranty period shall be the earlier of (i) twelve (12) months from the commissioning or (ii) eighteen (18) months from the date of shipment.
5. VALIDITY
This offer is valid for a period of 60 days from the date of this offer.
6. REMARKS
1) All taxes and duties to be imposed are not included in our price.
2) The other terms and conditions of the contract shall be subject to mutual agreement.
China the most famous gas engine generator sets