BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > China-the-most-famous-gas-engine-generator-sets - 10x500KW Straw gasification and Generating set equipment and material list quotation


 

10x500KW Straw gasification and Generating set equipment and material list quotation

 
10x500KW Straw gasification and Generating set(500GJZ1-PwG-TEM2 ) equipment and material list quotation

The main equipment and material list table 1.1.

1.1 The main equipment and material list

order

Equipment name

Type and specification

qty unit

remark

Straw gasification unit

LHC-1000

5 set

293,857.14×5

1

Biomass fuel storehouse

 

1 unit

 

2

Spiral feeder unit /SPAN>

 

1 unit

 

3

Biomass gasifier

 

1 unit

 

4

Level 1 dry-type  cyclone separator

 

1 unit

 

5

Secondary dry-type  cyclone separator

 

1 unit

 

6

Level 1 spray washing tower

 

1 unit

 

7

Secondary spray washing tower

 

1 unit

 

8

Level 1 venturi Washing tower

 

1 unit

 

9

Grade 2 Venturi Washing tower

 

1 unit

 

10

Cooling dust collector

 

1 unit

 

11

Packed Tower scrubber

 

1 unit

 

12

Caustic washing soda separator

 

1 unit

 

13

Biomass tar filter

 

2 unit

 

14

Wet type pressure regulating gas storage tank

 

1 unit

 

15

Safety water seal device

 

1 unit

 

16

Residual gas burner

 

1 unit

 

17

Spiral ash conveying machine unit

 

1 unit

 

18

Rotary ash valve unit

 

3 unit

 

19

Ash conveying system

 

1 unit

 

20

Cooling precipitation processor

 

1 unit

 

21

Tower between line and accessories

 

1 unit

 

22

Blower unit set

 

1 unit

 

23

Induced draft fan unit

 

1 unit

 

24

give water pump unit

 

2 unit

 

25

Return water pump unit

 

2 unit

 

26

Gasification system console

 

1 unit

 

total

1,469,285.71

1.2 Generating set main equipment and material list

The main equipment and material list table 1.2.

1.2 The main equipment and material list

order

Equipment name

Type and specification

qty unit

remark

1.Electrical part

1

Container room

 

10 unit

45,396.83×10=453,968.25

2

Generating set(Including engine,generator, chassis, horizontal fan tank)

500GJZ1-PwG-TEM2

10 units

209,523.81×10=2,095,238.10

3

Station power distribution cabinet

 /SPAN>

2 units

11,349.21×2=22,698.41

4

Generator circuit breaker cabinet

GCBP1-1000

10 units

17,460.32×10=174,603.17

5

In situ control cabinet

FCP1-TEM2-500/J

10 units

20,952.38×10=209,523.81

6

Starting cabinet

DQ-3000

10 units

6,111.11×10=61,111.11

7

Transformer low pressure into line tank

JX-4000A

2 units

17,460.32×2=34,920.63

8

Transformer low pressure into line tank

JX-2500A

1 units

14,841.27

2.Gas inlet and exhaust

1

Special pipe flame arrester

 

10 units

5,238.10×10=52,380.95

2

Instrument and valve and other accessories

 

1 item

12,222.22

3

Silencer and exhaust pipe

Stainless steel

10 set

4,365.08×10=43,650.79

3.residual heat utilization

1

Needle tube heat exchanger

Includes valve, instrument, etc

10 set

10,563.49×10=105,634.92

2

Softened water apparatus

Includes valve, instrument, etc

1 units

10,476.19

3

Softening water tank

Includes valve, instrument, etc

1 units

2,793.65

4

Hot water circulating pump

Includes valve, instrument, etc

2 units

4,365.08×2=8,730.16

5

Water supply pump

Includes valve, instrument, etc

2 units

3,492.06×2=6,984.13

 

Steam separator

 

1 units

8,730.16

4.other

1

Gas alarm system

 

10 set

1,746.03×10=17,460.32

2

Fire extinguisher

 

10 set

873.02×10=8,730.16

total

3,344,698.41

Total(USD):1,469,285.71+3,344,698.41=4,813,984.12

Remark:

1. payment: 30% by T/T, balance be paid before delivery.

2. Validity: 30 days from Aug.21.2011.

3. Quotation code:63102012821

 

 

China the most famous gas engine generator sets
China's large gas generating set by CNPC manufacturing

For China gas engine generator sets or power plants, please click.

 