Item |
Project name |
Model |
Quantity |
|
Generating sets |
1 |
Generating sets 500kW |
Including engines, chassis,generators, unit circuit breaker cabinet and on-site control cabinet |
2 |
|
2 |
Start cabinet |
|
1 |
|
3 |
Remote control cabinet |
|
1 |
|
4 |
Low voltage main cable ( unit to the circuit breaker cabinet ) |
YJV-0.6/1kv 3×185 |
100 |
|
5 |
Fire prevention plugging material |
|
40 |
|
6 |
Other power distribution, control cables |
|
2 |
|
7 |
Electrical complementary material |
Threading pipe, connection box, etc |
2 |
|
Unit air intake |
1 |
Silk screen filters |
|
1 |
|
2 |
Pipe special-purpose flame arrester |
|
2 |
|
3 |
General rubber bellows expansion joint |
|
2 |
|
4 |
Insert V cone flowmeter |
|
2 |
|
5 |
Gas treatment module |
|
4 |
|
6 |
Stainless steel membrane box pressure gauge |
|
12 |
|
7 |
bimetal thermometer |
|
4 |
|
8 |
Various pipe, elbow, flange |
|
2 |
|
Exhaust |
1 |
Muffler, exhaust pipe |
|
2 |
|
cooling part |
1 |
Much fan water tank |
|
2 |
|
2 |
Water softener feed water pump |
|
4 |
|
3 |
Water softening equipment |
|
1 |
|
4 |
Assembly type steel plate to the water tank and a bracket |
|
4 |
|
5 |
Level sensor |
|
2 |
|
6 |
Stents pipe valve six and other accessories |
|
2 |
|
|
1 |
transport fee |
|
1 |
|
Other expenses |
1 |
design fee |
|
free |
|
2 |
During construction period technology service charge |
|
|
3 |
Joint commissioning fee |
|
|
Total(USD) |
402,024.00 |
|
explain |
1, This budgeting does not include civil construction and installation charge; |
|
2, This quotation for FOB: Qingdao port; |
|
3,Quotation code:ning 62552012516 |