NO. |
Name |
Description |
Unit |
Quantity |
1 |
Engine |
H16V190ZLT1-2 |
Set |
20 |
2 |
Generator |
JFG 5605-6(Siemens technology�?/DIV> |
Set |
20 |
3 |
Gas system |
Set |
20 |
4 |
Control system |
Multi-function control panel, the EGS gas control box, the synchronous controller, local signal acquisition systems, remote communication interface |
Set |
20 |
5 |
Cooling system |
"Heat cycle" cooling system
"Low-temperature cycle" cooling system |
Set |
20 |
6 |
Exhaust muffler |
Flame arrester type |
Set |
20 |
7 |
Air starting system |
Set |
20 |
8 |
Generator Room |
Set |
20 |
9 |
Auxiliary equipment |
Six batteries and charger, fire fighting silencer, bellows and the exhaust pipe, the random spare parts, random tools, the use of maintenance manuals, common base |
Set |
20 |
10 |
Emergency diesel generators BH12V190ZL 3300V |
Set |
6 |
Total USD�?/DIV> |
$11,938,500.00 |
FOB QINGDAO PORT
Delivery time
Delivery time will be conditional to unsold production capacity.
The equipment will be ready for shipment from our factory
not later than 3 months after the date of signature of the SDJCHAi Supply Contract and
receipt of advance payment as defined therein.
WARRANTY
The warranty period shall be the earlier
of (i) twelve (12) months from the commissioning or (ii) eighteen (18) months
from the date of shipment.
VALIDITY
This offer is valid for a period of 60 days from the date of this offer.
|