BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > China-the-most-famous-gas-engine-generator-sets - Every day 250 tons of garbage 12 x 500 KW waste gasification power generation projects quoted price


 

Every day 250 tons of garbage 12 x 500 KW waste gasification power generation projects quoted price

 
 
Project Overview
1.1.1 Project Name
Yilang Ma praised Dahlan waste gasification power generation projects
1.1.2 Project Overview
The raw materials used every day is 250 tons of garbage.
1.1.3 the goal of building
Selection of advanced gasification technology, the stable operation of process equipment, the most mature and reliable power generation equipment, to ensure the long-term stable operation.
1.1.4 The construction content and scale
250 tons of refuse daily handling the project using refuse as raw materials, refuse heat vent into the main process, gas electricity use for the purpose of the technical program to gasification occur.
The project will construct a set of waste transport and pretreatment system; transport slag system set; pyrolysis of two sets of dry distillation gasification system; a set of control systems and ancillary equipment; 500KW generator container 12.
1.2 The design information
1.2.1 The waste disposal amount.
Other data:
The raw materials used every day is 250 tons of garbage.
1.2.2 The basic design parameters
1.2.2.3 Gas production:
Design parameters per ton can be gasified waste every day, 1500m ³ gasification gas, the basis of waste gasification of garbage 80% of gas production in the gasifier day of 1500 × 250 × 80% = 300 000 m³.
The annual output volume: 109.5 million m³
1.2.3 The installed capacity and gas generating capacity calculation
This project daily gas 300000m3, in LHV 5MJ to the take the gas / m3, Nissan gas heating value of 300 000 x 5 = 1.5 million MJ / d, and if used for power generation, configuration wins move the straw gas generator set, heat consumption rate of 10.5 MJ / kW • h, the daily generation capacity 1500000/10.5 =142857kW • h / d, the average daily run 24 hours, you can configure the generator set is 142 857/24 = 5952.38KW, it is recommended that configuration 12 The 500KW wins move the generator set.
The total area of approximately 35 acres
The total price of this item: 7558179.2USD, excluding civil work, international transportation, and custom clearance.
Quotation code: 6253020120507
 
Yangchunlin

  

China the most famous gas engine generator sets


For China gas engine generator sets or power plants, please click.

 

 




Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
[email protected]
[email protected]